Different Factors Affecting the Life of Insulating Materials:
1. Dielectric strength / Electrical stress / High voltage stress.
2. Temperature / Thermal stress / High temperature. 3. Mechanical stress .4. Moisture absorption. 5. Water 8. Ageing. 9. Improper handling. d) List eight agents which contaminate the insulating oil. 1. Water. 2. Moisture.3. Dirt / dust.4. Carbon deposits. 5. Sulphur. 6. Acids. Grace . solid particle
External Causes for Abnormal Operation of Electrical Equipment
1. Sometimes in the generating station / receiving station / substation there occurs over voltage or under voltage which affect the normal working of the machine / equipment. 2. High voltage disturbances.
3. Sustained power frequency over voltage disturbances.
4. Lightning surges. 5. Switching surges.
6. Travelling waves. 7. Arcing grounds.
8. Resonance conditions. Different Factors Affecting the Life of Insulating Materials: 1. Dielectric strength / Electrical stress / High voltage stress. Temperature /Thermal stress /High temperature. 2. Mechanical stress .4. Moisture absorption. 5. Water 8. Ageing. 9. Improper handling. d) List eight agents which contaminate the insulating oil. 1. Water. 2. Moisture.3. Dirt / dust .4. Carbon deposits. 5. Sulphur. 6. Acids. Grace . solid particle Describe the procedure for conducting polarity test of a single phase transformer with the necessary circuit diagram.
1.The secondary winding terminals are also marked as a1
and a2, as shown in figure and the voltage measured across it will be V2. 2. Now a voltmeter V3 is connected across A2 and a2. if it measures the difference of V1 and V2, Then the A2 and a are of the 2 same polarity.
3. If a voltmeter V3 measures the addition of V1 and
V2 then the A2 and a are of opposite 2 polarity. 5.If a voltmeter V measures the addition of and then the 3 V1 V2 A2 and are of opposite a2polarity Trouble shooting Chart for 1Φ Induction Motor:
Motor Fault / Cause Remedies
Motor fails to start or Blowing of fuse • Replace fuse with
not Faults in starting Wrong connections proper type rating supply circuit / Motor control circuit Check physically and switch ON but does correct them not start Motor stalls Reduce load. Over load Change type or size. Wrong application Consult motor manufacturer Motor does not Power failure Check for loose pick up rated Starter may be defective connections to line speed Check for starter contacts and clean replace them Motor overloaded Reduce load or load the Motor runs hot / Unbalanced terminal motor as per its rating Motor overheats voltage / supply voltage is Check for faulty leads Winding too hig overheating
1. Misalignment of Check and correct the balancing
misalignment of rotor or rotor Motor vibrates Bent shaft rebalance rotor
Noisy operation 2. Misalignment of Check and correct the balancing
misalignment of rotor or of motor rotor rebalance rotor 3. Bent shaft. Explain the procedure to test electrical machine by direct testing with neat diagram. Write any two merits and de-merits of it. Direct Loading Test on Single Phase Transformer:
1. The load is increased step-by-step till secondary ammeter shows
the full load secondary current. Note down the reading of wattmeter, voltmeters and ammeters 2. Determine the performance i.e., full load efficiency and regulation of transformer. Efficiency: % Efficiency = [ Output Power / Input Power] × 100% = [ W2 / WI] × 100% Voltage Regulation: Let us consider that no load secondary voltage is 0V2 and full load secondary voltage is V2 Direct Loading Test on Three Phase Induction Motor:
1. Reduce the load on the motor and finally unload it completely.
2. Switch-off the supply to stop the motor. 3. Note-down the effective diameter of the brake drum. 5. Perform necessary calculations to determine performance parameter Merits of Direct Loading Test: 1.Very simple method. 2. Very useful for small capacity machines Demerits of Direct Loading Test: 1.More power consumption c) Prepare trouble shooting chart of three phase induction motor for any three faults.
Problem Motor cause Remides
Motor stalls One phase may be open check supply reducd