Afghan Development Association: Kabul Engineering Department
Afghan Development Association: Kabul Engineering Department
Kabul Engineering
Department
CONCRETE WORKS:
1 - All air - entraining plain cement concrete should be M-200 by wright and for RCC should
LIST OF DRAWINGS be M-250 or be as specified on the drawings.
2 - All PCC under footings to have cement, sand and aggregate as specified on the
drawings.
3 - Concrete design should be based on a compressive strength of fc = 200kg/cm2 or
as specified on the drawings.
4 - Weight per unit volume of concrete W=2400kg/m3.
5 - Sand or fine aggregate shall be free from salt, Alkali, Calcium sulphate or
Vegetation and it shall not contain more than 0.5 percent by weight clay.
DESCRIPTION DRAWING Sheet No. 6 - Aggregate:- Coarse aggregate shall consist of crushed gravel with the maximum
size of 20mm.
7 - The maximum slump for concrete should be between ( 5 - 7.5 )cm. ( For deferent
concrete type refer to general specification ).
8 - To increase the workability of the concrete provide the chemical admixture ( Super
plasticizer, If required ).
List of drawings & Brief Technical Specification 1 9 - Water used for concrete mixture and concrete curing shall be from a source
approved by the Engineer and at the time of use shall be free from contaminants.
10- Concrete compaction should be done by using concrete vibrator at the time of
pouring in such a way to form a solid compact concrete.
11- Concrete curing should by continued for 28 days.
12- During cold weather concreting should be stopped or the contractor has to
Project site Google map 2 consider cold weather concreting procedure as accepted by the Engineer. ( Or
refer to general specification ).
13- Concrete shuttering / form work should be of steel or wooden type.
MASONRY WORKS:
General site plan 3 1 - Plum / Mass air - entraining concrete shall contain a maximum of 40% stone with a
maximum stone size as 20cm.
The concrete ratio shall be M-20.
2 - Stone for mass concrete, Stone masonry, Gabion and grouted stone pitching should
be of good quality and approved by Engineer.
3 - All grouted stone pitching in stilling basin and foundations should be with ratio of (
1:3 ).
Check Dam site plan 4 4 - All masonry cutoff wall shall be with M400( 1:3 ) Cement sand mortar or as specified on
the drawing.
EARTH WORKS:
1 - Backfilling material should be properly tested and selected to be suitable as per
standard practice.
site Plan for Irrigation Canal & Gate details 5 2 - For backfilling maximum thickness of each loose soil layer should not more than
15cm. According to general specification.
GABION WORKS:
1. Stones used for rock filling should be mountain crashed stone.
Details drawing of check dam 6---9 2. 3mm thick galvanized steel wire Mesh spacing is (10cm*8cm)
Bending wire is (3mm)Edge wire is (3.8~4mm).
3. Individual stones should be sound, hard and durable
and should be such that they will be able to sustain weathering
Details drawing of Gabion wall 1-2 and water action.
4. They should be free from laminations, soft spots,
cracks and other defects.
5. Min & Max size of stone 1.5 time to 2.5 time of mash opening.
6. Tolerance on size of stone + - 5%.
7. Minimum density 22KN/m3.
8.All dimension are in m or otherwise specified.
ADA,NCA,PRRD,MEW NO.1/11
SHEET
DWG Dimension
SURVEYED BY CHECKED BY ADA Team SCALE PROVINCE Kabul Stone Masonry Gravity Check Dam
cover
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara ..\..\photo.jpg
ADA,NCA,PRRD,MEW
SHEET
NO.2/9
SURVEYED BY CHECKED BY ADA Team SCALE DWG Dimension PROVINCE Kabul
cover Stone Masonry Gravity Check Dam
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara
Mountains N
water fl A
ow/Rive
r Existing Reservior
Need to be rehabilitation
Gate Valve 3 inch
Por.Intake,Ref Sheet#
B B
River
Cultivated Area
Mountains
Existing Canal
Cultivated Area
SHEET
NO.5/9
SURVEYED BY ADA,NCA,PRRD,MEW CHECKED BY ADA Team SCALE DWG Dimension PROVINCE Kabul Stone Masonry Check Dam
cover
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara
24
15
0+00
.0
.00
0
2410
0+02
0 Pro.Stone.M Dam
0+040
00
Village
.00
5.
240
0+0
00
60
24
Water Flow
24
0+
17
08
.5
0
0
Cultivated Area
2412.50
0+100
0+114
Water storage
Volume=876m3
.50
2407.5
2402
Mountains
Cultivated Area
BM1
Village
ADA,NCA,PRRD,MEW
SHEET
NO.3/9
SURVEYED BY CHECKED BY ADA Team SCALE DWG Dimension PROVINCE Kabul
cover Stone Masonry Check Dam
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara
24
15
0+00
.00
00
0
2410.
0+02
0
0+040
0
5.0
.00
240
0+0
00
60
24
24
0+
17
0
.50
80
2412.50
Water storage 0+100
Volume=876m3 0+114
2.50
2407.5
240
BM1
SHEET
NO.4/9
SURVEYED BY ADA,NCA,PRRD,MEW CHECKED BY ADA Team SCALE DWG Dimension PROVINCE Kabul
cover Stone Masonry Check Dam
DESIGNED BY Eng.Noor Rahman"Rhmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara
1 N34° 45' 59.22" E68° 59' 42.72" 22 N34° 45' 58.59" E68° 59' 44.48" 42 N34° 45' 58.95" E68° 59' 46.14"
2 N34° 45' 59.13" E68° 59' 43.22" 23 N34° 45' 58.57" E68° 59' 44.80" 43 N34° 45' 58.83" E68° 59' 46.49"
3 N34° 45' 59.06" E68° 59' 43.74" 24 N34° 46' 06.99" E69° 01' 05.18" 44 N34° 45' 58.76" E68° 59' 46.77"
4 N34° 45' 58.94" E68° 59' 44.21" 25 N34° 45' 58.34" E68° 59' 45.50" 45 N34° 45' 58.71" E68° 59' 47.04"
5 N34° 45' 58.91" E68° 59' 44.52" 26 N34° 45' 58.29" E68° 59' 45.88" 46 N34° 45' 58.70" E68° 59' 47.28"
6 N34° 45' 58.78" E68° 59' 44.95" 27 N34° 45' 58.14" E68° 59' 46.52" 47 N34° 45' 59.73" E68° 59' 44.04"
7 N34° 45' 58.69" E68° 59' 45.33" 28 N34° 45' 58.46" E68° 59' 43.51" 48 N34° 45' 59.58" E68° 59' 44.73"
8 N34° 45' 58.53" E68° 59' 45.76" 29 N34° 45' 58.31" E68° 59' 44.09" 49 N34° 45' 59.45" E68° 59' 45.30"
9 N34° 45' 58.40" E68° 59' 46.34" 30 N34° 45' 58.17" E68° 59' 44.53" 50 N34° 45' 59.36" E68° 59' 45.81"
10 N34° 45' 58.36" E68° 59' 46.79" 31 N34° 45' 58.12" E68° 59' 44.75" 51 N34° 45' 59.29" E68° 59' 46.12"
11 N34° 45' 57.91" E68° 59' 45.10" 32 N34° 45' 58.05" E68° 59' 45.07" 52 N34° 45' 59.21" E68° 59' 46.44"
12 N34° 45' 58.22" E68° 59' 44.92" 33 N34° 45' 58.06" E68° 59' 45.30" 53 N34° 45' 59.16" E68° 59' 46.77"
13 N34° 45' 58.60" E68° 59' 44.67" 34 N34° 45' 58.05" E68° 59' 45.63" 54 N34° 45' 59.13" E68° 59' 47.01"
14 N34° 45' 58.84" E68° 59' 44.73" 35 N34° 45' 57.95" E68° 59' 46.12" 55 N34° 45' 59.06" E68° 59' 47.27"
15 N34° 45' 59.06" E68° 59' 45.35" 36 N34° 45' 57.88" E68° 59' 46.77" 57 N34° 45' 58.97" E68° 59' 47.51"
16 N34° 45' 59.18" E68° 59' 45.83" 37 N34° 45' 59.57" E68° 59' 43.18" 58 N34° 45' 58.95" E68° 59' 22.64"
18 N34° 45' 58.86" E68° 59' 42.97" 38 N34° 45' 59.47" E68° 59' 43.83" 59 N34° 45' 34.42" E69° 01' 03.94"
19 N34° 45' 58.76" E68° 59' 43.36" 39 N34° 45' 59.39" E68° 59' 44.28"
20 N34° 45' 58.61" E68° 59' 43.85" 40 N34° 45' 59.23" E68° 59' 44.92"
21 N34° 45' 58.63" E68° 59' 44.18" 41 N34° 45' 59.05" E68° 59' 45.69"
SHEET
NO.5/9
SURVEYED BY ADA,NCA,PRRD,MEW CHECKED BY ADA Team SCALE DWG Dimension PROVINCE Kabul GPS Points
cover
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara
Water Flow
D
22.0
10.0
compacted earth
El:2410
1.5
UP/Stream(PCC)Apron
El:2415
2.0
El:2416
4.50
2.5
0.5
0.2
0.50
4 El:2410
2.4
2%slope
2%slope
0.5
DN/Stream(PCC) Apron
0.5
1.2
0.6 0.6
0.9 0.9
D
A
30.0
ADA,NCA,PRRD,MEW
SHEET
SURVEYED BY CHECKED BY ADA Team SCALE DWG Dimension NO.6/9 PROVINCE Kabul Stone Masonry Gravity Check Dam
cover
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara
1.0
PFL
0.35
10cm PCC PFL
El:2415 MWL
FB,1.0
(1:3) pointing
(1:3) pointing
5
RB 0.5
0.
6"GI pipe to
gate valve
5
10cm PCC El:2410
RB 0.5
0.
10cm PCC El:2410 0.7
1
0.7
1.80
1.5 1.5
1
1
3.5
1.80
2.5
compacted earth 3.5 2.5 2.5
10cm PCC
2.5
10cm PCC
2.5 4.0
4.50 1.4 d>30cm filling by dray stone
section :(D-D)
section :(A-A) -Top wide L=30m
-Top wide L=30m - Bottom wide L=15.5m
- Bottom wide L=15.5m
10.0
1
0.6 10cm PCC
h=5.0
(1:3) pointing
2.5
dn/stream apron
1.5
0.50 1.50
10cm PCC Por. Wide for check dam bed L=15.5m Manhole
0.5
GL
1.1
DWG Dimension
ADA,NCA,PRRD,MEW
SHEET
SURVEYED BY CHECKED BY ADA Team SCALE NO.9/9 PROVINCE Kabul Stone Masonry Gravity Check Dam
cover
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara
10mm@15cm c/c
10mm@15cm c/c
10
10
15
Sleeve
150
50
A A
100
150
15
10 15
10
10 15 100 15 10
10 15 100 15 10
150
25
0.50
5
80*50*4 for frame support 30
0.7
Stone Masonry
Joint filled with @40
1:6 cement motar welded
Wall
Steel sheet must be connected to steel 0.3
R20
22.5 cm wide @25 galvanized pipe s
PVC Water stop for opening hand wheel Note: Control gate
size (0.6*1.2)m *3
Hand wheel details
No. near to the
Existing reservoir
22.5 cm wide
PVC Water stop
SKIN PLATE
4MM THICK CHANNEL
CHANNEL
12X5X0.6CM 10X4.7X0.5CM
0.50
0.12
0.6 0.60
0.6
A SECTION S-S
0.50
0.50
SPINDLE Ø40MM SPINDLE Ø40MM
SPINDLE CONNECTION
SPINDLE CONNECTION
NUT
joint for covered section
NUT
of stonemasonry PCC
SKIN PLATE
Plan of construction
4MM THICK S S
PVC water stop
22.5 cm wide
SKIN PLATE
CHANNEL
1.50
1.50
4MM THICK
12X5X0.6CM
0.05
0.05
CHANNEL
10X4.7X0.5CM
CHANNEL 0.12 CHANNEL
10X4.7X0.5CM 0.50 12X5X0.6CM
0.60 SECTION F-F
F
Canal Flow
PLAN
DETAIL (D)
PLAN
SECTION S-S
SECTION F-F
SURVEYED BY
SHEET
DRAWN BY Eng Noor Rahman Rahamni APPROVED BY NCA/UNDP DRAWING NO. VILLAGE Shamir
Gabion and stone specification
Technical Specification
Uper Cop
1. Stones used for rock filling should be mountain crashed stone.
Cortoin 2. 3mm thick galvanized steel wire Mesh spacing is (10cm*8cm)
Box edge Bending wire is (3mm)Edge wire is (3.8~4mm).
Box edge 3. Individual stones should be sound, hard and durable
1.0
and should be such that they will be able to sustain weathering
and water action.
4. They should be free from laminations, soft spots,
Side Sheet cracks and other defects.
1.0 5. Min & Max size of stone 1.5 time to 2.5 time of mash opening.
2.0
Lower Sheet 6. Tolerance on size of stone + - 5%.
7. Minimum density 22KN/m3.
8.All dimension are in m or otherwise specified.
1.0
1.0
2.0
Kabul
CHECKED BY SCALE
cover
PROVINCE
Gabion details
DESIGNED BY Eng Noor Rahman Rahmani REVIEWED BY ADA Technical Team DATE 08/11/2023 DISTRICT Guldara ..\photo.jpg
DRAWN BY Eng Noor Rahman Rahamni APPROVED BY NCA/UNDP DRAWING NO. VILLAGE Shamir Bala Village
Gabion Protection wall plan & section
1
MWL FB0.5
RBL,DN/S RBL,UP/S
1
1
1
2
3
Section A-A
A
16m
A
DRAWN BY Eng Noor Rahman Rahamni APPROVED BY NCA/UNDP DRAWING NO. VILLAGE Shamir Bala
Shamir Bala Village Road Widening & Cutting Types (Existing)
3.0
New road surface hard rock (avg-1.3m,cutting)
Natural Ground
CL
Section#1 Area Cut
Varies Height
1.4
Road Cross Section #1, in
e
0.6 3-5 %Slop
ST:0+00 to 0+350Km
3.0
New road surface hard rock (avg-1.3m,cutting)
Natural Ground
Note:LengthofRoadinall2sections=0+650Km
Thefieldengineerisresponsible
foradjustingtheaboveSection
bylookingatthenaturalAreaslope.
Alldimensionsareinm.
ADA,NCA,PRRD,MEW ADA Team
SHEET
Section#2
Road Cross Section #2,in
ST:0+350-0+650Km
3-5 %Slope
Section#1
Varies Height
Note: LengthofRoadinall2sections=0+650Km
Thefieldengineerisresponsible
foradjustingtheaboveSection
bylookingatthenaturalAreaslope.
Alldimensionsareinm.
ADA,NCA,PRRD,MEW ADA Team
SHEET
Hydraulic design:
Discharge estimation based on Rational method
3
Q = kCIA m /sec 3.50 Cumecs
k, for metric method is 0.278
C, Runoff coefficient 0.6 From table
I, Railfall intensity (mm/hr)
A, Drainage area (Skm) 1.37 Skm
0.38
I = T/(tc+10) 15.33 mm/hr
Where:
T- is return period 50 year
tc- is time of concetration (minutes)
tc = 0.01947 L0.77/S0.385 12.44 minutes
Where:
L - is maximum length of travel 2300 m
S - is catchment slope 0.27
Highest top catchment level 3038.5 m
Level at axis of check dam 2410 m
HL
D/S Pucca Floor
U/S Pucca Floor
t1 t2 t1
d1 d2
L1 B L2
Masonry Gravity Check Dam Calculation for water pressure (Shamir Bala village)
a
X1
X2
V1 h1
h V2 Stone masonry
H
Ph C.G
h/3 W
R
h(b) ɣ(w)xh heel V3 Toe
e X
b/2 b/2
Fmin Fmax
ɣ(w)xh(u2)
ɣ(w)xh(u1)
Uv2 Uv1
1.511729 (kg/cm2)
0.421961 (kg/cm2)
Note:
U Uplift Force (Upward)
Mu Uplift force Moment
H Total Height
hw water height
Ph Water Force
χ Distance from toe to Resultant point
e (exce..) distance from X to centre of base
C.G Centre of Gravity
F(min/max) Stresses on toe and heel (shall be >0)
K Seepage Coeficient (in hard foundation it is 1)
V Total vertical Weight
∑Ph Total Horizontal load
h1 D/S inclined height
Pe Hydrodynamic Force (VAN-KARMAN)
Me Moment of hdrodynamic force act at (4H/3Pi)
Kh is the friction of gravity adopted for horizontal acceleration, such as 0.1, 0.2
Pei Horizontal Intertia forces due to earthquak
Mpei Moment of horizontal intertia forces due to earthquake
VE Vertical earthquake forces (Upward)
MVE Moment of Vertical earthquake forcess (Upward)
h(u1) Uplift pressure head (first corner)
h(u1) Uplift pressure head (second corner)
h(u1) 5.700 m
h(u2) 0.900 m
Cost/Unit Total Cost
S/NO Discriptions Unit Quantity
(Afs.) (Afs.)
Remarks
3
2 Excavation of the foundation of check dam Irrigation canal lining and intake M 375.00 0
Provide, install and fill the gabion basket (1x1x2) m with stone in place, having mesh size not more than
(80x100) mm as per relevant drawing, specification and complete satisfaction of the site engineer. (2.7 to 3)
3
3 mm galvanized mild steel wire should be used for the mesh with zinc quantity not less than 260 gr/m2 and M 138.20 0
(3.4 to 4) mm galvanized mild steel wire with zinc quantity of not less than 275 gr /m2 for the frame. The
gabion boxes shall be fabricated 'Maccaferri' type or equivalent supplied by an approved manufacturer.
Casting Plain Cement Concrete (PCC), M200 kg/cm2 (1:1.5:3), the PCC should be properly leveled,
3
4 including the preparation, shuttering, pouring, compacting, curing and with all requirement activities, cement M 39.80 0
used in PCC should be of best quality. If should be tested
Casting Reinforced Cement Concrete (RCC), M250 kg/cm2 (1:1:2) with shuttering, steel and curing at least
5 M3 3.20 0
14days during hot weather condition and 7days during cold weather condition.
6 installation of water stoper inside the expansion joints where needed m 27.00 0
Stone masonry construction of the check dam, and canal, with cement- sand mortar M400:1:3, the stone must
7 be mountain stone and solid, clean and free of dust. And according to site engineer guidance. With at least M3 683.30 0
35% mortar all activities as per drawings
Pointing for both side of Check dam and walls and canal with mortar 1:3 (cement -sand), with all
8 M2 469.30 0
requirement activities. The pointing should be outer
9 Signboard ( Digital ) Pcs 1.00 0
10 Large size tent Pcs 1.00 0
Operating the 3" water pump for draining the water to downstream as per need of the villagers, while
11 Day 20.00 0
operating NCA and ADA engineers should be informed and the days will be counted to supplier
12 3 inch HDPE pipe for water pump M 50.00 0
13 6 inch Gate valve best quality (bronz) No 1.00 0
14 GI pipe IIL-EEL 6" to be connected with Gate Valve M 8.00 0
15 Supply and installation of metalic control gate according to drawing No 4.00 0
16 Glass wool (10cm) thick best quality which will be selected by Engineer m2 50.00 0
17 Anti-Freeze Isomat #1 quality Adium 150 liter 60.00 0
18 First Aid Kit kit 1.00 0
Inside of reservior existing rock cutting and removing with seapage control of the existing reservoir by stone
19 LS 1.00 0
boulder, plastic, gravel, bitument , PCC and inside plaster for wall.
Excavation, hard cutting and soft cutting in rock hill and soil hill by lentgh of 650m and 3width site visit is
20 LS 1.00
must, to see the amound of cutting
4.00 Gabion
6.00 Pointing
7.00 Shuttering
8.00 Curring
9.00 RCC
13.00
14.00