Download as pdf or txt
Download as pdf or txt
You are on page 1of 23

Afghan Development Association

Kabul Engineering
Department

Construction of Stone Masonry Brief Information:


Check Dam and Irrigation Canal Length of Check Dam = 30m
in shamir bala village Guldara District Height of Check Dam = 6m
Catchments Area = 1.37Km2
Capacity of Reservoir =876m3
09 Nov 2023 Purpose of Check Dam =
Groundwater recharge and
Irrigation use.
Duration of Project = 3month
Brief Technical Specifications

CONCRETE WORKS:
1 - All air - entraining plain cement concrete should be M-200 by wright and for RCC should
LIST OF DRAWINGS be M-250 or be as specified on the drawings.
2 - All PCC under footings to have cement, sand and aggregate as specified on the
drawings.
3 - Concrete design should be based on a compressive strength of fc = 200kg/cm2 or
as specified on the drawings.
4 - Weight per unit volume of concrete W=2400kg/m3.
5 - Sand or fine aggregate shall be free from salt, Alkali, Calcium sulphate or
Vegetation and it shall not contain more than 0.5 percent by weight clay.
DESCRIPTION DRAWING Sheet No. 6 - Aggregate:- Coarse aggregate shall consist of crushed gravel with the maximum
size of 20mm.
7 - The maximum slump for concrete should be between ( 5 - 7.5 )cm. ( For deferent
concrete type refer to general specification ).
8 - To increase the workability of the concrete provide the chemical admixture ( Super
plasticizer, If required ).
List of drawings & Brief Technical Specification 1 9 - Water used for concrete mixture and concrete curing shall be from a source
approved by the Engineer and at the time of use shall be free from contaminants.
10- Concrete compaction should be done by using concrete vibrator at the time of
pouring in such a way to form a solid compact concrete.
11- Concrete curing should by continued for 28 days.
12- During cold weather concreting should be stopped or the contractor has to
Project site Google map 2 consider cold weather concreting procedure as accepted by the Engineer. ( Or
refer to general specification ).
13- Concrete shuttering / form work should be of steel or wooden type.

MASONRY WORKS:

General site plan 3 1 - Plum / Mass air - entraining concrete shall contain a maximum of 40% stone with a
maximum stone size as 20cm.
The concrete ratio shall be M-20.
2 - Stone for mass concrete, Stone masonry, Gabion and grouted stone pitching should
be of good quality and approved by Engineer.
3 - All grouted stone pitching in stilling basin and foundations should be with ratio of (
1:3 ).
Check Dam site plan 4 4 - All masonry cutoff wall shall be with M400( 1:3 ) Cement sand mortar or as specified on
the drawing.
EARTH WORKS:
1 - Backfilling material should be properly tested and selected to be suitable as per
standard practice.
site Plan for Irrigation Canal & Gate details 5 2 - For backfilling maximum thickness of each loose soil layer should not more than
15cm. According to general specification.

GABION WORKS:
1. Stones used for rock filling should be mountain crashed stone.
Details drawing of check dam 6---9 2. 3mm thick galvanized steel wire Mesh spacing is (10cm*8cm)
Bending wire is (3mm)Edge wire is (3.8~4mm).
3. Individual stones should be sound, hard and durable
and should be such that they will be able to sustain weathering
Details drawing of Gabion wall 1-2 and water action.
4. They should be free from laminations, soft spots,
cracks and other defects.
5. Min & Max size of stone 1.5 time to 2.5 time of mash opening.
6. Tolerance on size of stone + - 5%.
7. Minimum density 22KN/m3.
8.All dimension are in m or otherwise specified.

ADA,NCA,PRRD,MEW NO.1/11
SHEET
DWG Dimension
SURVEYED BY CHECKED BY ADA Team SCALE PROVINCE Kabul Stone Masonry Gravity Check Dam
cover
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara ..\..\photo.jpg

DRAWN BY Eng.Noor Rahman"Rahmani" APPROVED BY NCA/UNDP DRAWING NO. VILLAGE


Shamir Bala
Shamir Bala Catchment Area

ADA,NCA,PRRD,MEW
SHEET
NO.2/9
SURVEYED BY CHECKED BY ADA Team SCALE DWG Dimension PROVINCE Kabul
cover Stone Masonry Gravity Check Dam
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara

DRAWN BY Eng.Noor Rahman"Rahmani" APPROVED BY NCA/ADA DRAWING NO. VILLAGE


Shamir Bala
Existing and Proposed Layout plan for Irrigation Canals with proposed control gate installation and one side construction of protection walls

Mountains N

water fl A
ow/Rive
r Existing Reservior
Need to be rehabilitation
Gate Valve 3 inch

Pro. one side protection walls

A Control gate,Ref:sh# Cultivated Area


A

Por.Intake,Ref Sheet#
B B
River

Cultivated Area

Mountains

Existing Canal

Cultivated Area

SHEET
NO.5/9
SURVEYED BY ADA,NCA,PRRD,MEW CHECKED BY ADA Team SCALE DWG Dimension PROVINCE Kabul Stone Masonry Check Dam
cover
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara

DRAWN BY Eng.Noor Rahman"Rahmani" NCA/ADA Shamir Bala


APPROVED BY DRAWING NO. VILLAGE
General Site Plan of Shamir Bala Village
Mountains N

Pro.Tertiary road,Refer -Sheet#

24
15
0+00

.0

.00
0

2410
0+02
0 Pro.Stone.M Dam

0+040

00
Village

.00
5.
240
0+0

00
60

24
Water Flow
24

0+
17

08
.5

0
0

Cultivated Area

2412.50
0+100
0+114
Water storage
Volume=876m3

.50
2407.5

2402
Mountains

Cultivated Area

BM1

Village

ADA,NCA,PRRD,MEW
SHEET
NO.3/9
SURVEYED BY CHECKED BY ADA Team SCALE DWG Dimension PROVINCE Kabul
cover Stone Masonry Check Dam
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara

DRAWN BY Eng.Noor Rahman"Rahmani" APPROVED BY NCA/ADA DRAWING NO. VILLAGE


Shamir
SITE PLAN OF THE CHECK DAM
N
Water Storage Area

24
15
0+00
.00

00
0

2410.
0+02
0
0+040

0
5.0

.00
240
0+0

00
60

24
24

0+
17

0
.50

80

2412.50
Water storage 0+100
Volume=876m3 0+114

2.50
2407.5

240
BM1

SHEET
NO.4/9
SURVEYED BY ADA,NCA,PRRD,MEW CHECKED BY ADA Team SCALE DWG Dimension PROVINCE Kabul
cover Stone Masonry Check Dam
DESIGNED BY Eng.Noor Rahman"Rhmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara

DRAWN BY Eng.Noor Rahman"Rhmani" NCA/UNDP Shamir Bala


APPROVED BY DRAWING NO. VILLAGE
Shamir Bala Village LAT & Long

1 N34° 45' 59.22" E68° 59' 42.72" 22 N34° 45' 58.59" E68° 59' 44.48" 42 N34° 45' 58.95" E68° 59' 46.14"

2 N34° 45' 59.13" E68° 59' 43.22" 23 N34° 45' 58.57" E68° 59' 44.80" 43 N34° 45' 58.83" E68° 59' 46.49"

3 N34° 45' 59.06" E68° 59' 43.74" 24 N34° 46' 06.99" E69° 01' 05.18" 44 N34° 45' 58.76" E68° 59' 46.77"

4 N34° 45' 58.94" E68° 59' 44.21" 25 N34° 45' 58.34" E68° 59' 45.50" 45 N34° 45' 58.71" E68° 59' 47.04"

5 N34° 45' 58.91" E68° 59' 44.52" 26 N34° 45' 58.29" E68° 59' 45.88" 46 N34° 45' 58.70" E68° 59' 47.28"

6 N34° 45' 58.78" E68° 59' 44.95" 27 N34° 45' 58.14" E68° 59' 46.52" 47 N34° 45' 59.73" E68° 59' 44.04"

7 N34° 45' 58.69" E68° 59' 45.33" 28 N34° 45' 58.46" E68° 59' 43.51" 48 N34° 45' 59.58" E68° 59' 44.73"

8 N34° 45' 58.53" E68° 59' 45.76" 29 N34° 45' 58.31" E68° 59' 44.09" 49 N34° 45' 59.45" E68° 59' 45.30"

9 N34° 45' 58.40" E68° 59' 46.34" 30 N34° 45' 58.17" E68° 59' 44.53" 50 N34° 45' 59.36" E68° 59' 45.81"

10 N34° 45' 58.36" E68° 59' 46.79" 31 N34° 45' 58.12" E68° 59' 44.75" 51 N34° 45' 59.29" E68° 59' 46.12"

11 N34° 45' 57.91" E68° 59' 45.10" 32 N34° 45' 58.05" E68° 59' 45.07" 52 N34° 45' 59.21" E68° 59' 46.44"

12 N34° 45' 58.22" E68° 59' 44.92" 33 N34° 45' 58.06" E68° 59' 45.30" 53 N34° 45' 59.16" E68° 59' 46.77"

13 N34° 45' 58.60" E68° 59' 44.67" 34 N34° 45' 58.05" E68° 59' 45.63" 54 N34° 45' 59.13" E68° 59' 47.01"

14 N34° 45' 58.84" E68° 59' 44.73" 35 N34° 45' 57.95" E68° 59' 46.12" 55 N34° 45' 59.06" E68° 59' 47.27"

15 N34° 45' 59.06" E68° 59' 45.35" 36 N34° 45' 57.88" E68° 59' 46.77" 57 N34° 45' 58.97" E68° 59' 47.51"

16 N34° 45' 59.18" E68° 59' 45.83" 37 N34° 45' 59.57" E68° 59' 43.18" 58 N34° 45' 58.95" E68° 59' 22.64"

18 N34° 45' 58.86" E68° 59' 42.97" 38 N34° 45' 59.47" E68° 59' 43.83" 59 N34° 45' 34.42" E69° 01' 03.94"

19 N34° 45' 58.76" E68° 59' 43.36" 39 N34° 45' 59.39" E68° 59' 44.28"

20 N34° 45' 58.61" E68° 59' 43.85" 40 N34° 45' 59.23" E68° 59' 44.92"

21 N34° 45' 58.63" E68° 59' 44.18" 41 N34° 45' 59.05" E68° 59' 45.69"

SHEET
NO.5/9
SURVEYED BY ADA,NCA,PRRD,MEW CHECKED BY ADA Team SCALE DWG Dimension PROVINCE Kabul GPS Points
cover
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara

DRAWN BY Eng.Noor Rahman"Rahmani" NCA/ADA Shamir Bala


APPROVED BY DRAWING NO. VILLAGE
Shamir Bala Village Stone Masonry Gravity Check Dam Plan

Water Flow

D
22.0
10.0
compacted earth
El:2410

1.5
UP/Stream(PCC)Apron

El:2415

2.0
El:2416

4.50

2.5
0.5
0.2
0.50
4 El:2410

2.4
2%slope
2%slope

0.5
DN/Stream(PCC) Apron

(Manhole)6" gate valve


6"GI PIPE 7m,Sht#11

0.5
1.2
0.6 0.6
0.9 0.9

D
A
30.0

ADA,NCA,PRRD,MEW
SHEET
SURVEYED BY CHECKED BY ADA Team SCALE DWG Dimension NO.6/9 PROVINCE Kabul Stone Masonry Gravity Check Dam
cover
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara

DRAWN BY Eng.Noor Rahman"Rahmani" APPROVED BY NCA/UNDP Shamir Bala


DRAWING NO. VILLAGE
El:2416
El:2416
10cm PCC 2.0
10cm PCC 2.0

1.0
PFL

1.0 El:2415 MWL

0.35
10cm PCC PFL
El:2415 MWL

FB,1.0
(1:3) pointing
(1:3) pointing

Gate Valve Box

5
RB 0.5

0.
6"GI pipe to
gate valve

5
10cm PCC El:2410
RB 0.5

0.
10cm PCC El:2410 0.7
1
0.7

1.80
1.5 1.5
1

1
3.5
1.80

1.5 1.5 compacted earth 2.5

2.5
compacted earth 3.5 2.5 2.5
10cm PCC

2.5
10cm PCC
2.5 4.0
4.50 1.4 d>30cm filling by dray stone

1.4 d>30cm filling by dray stone

M400(1:3) stonemasonry Core Wall


RCC Slab/M250 M400(1:3) stonemasonry Core Wall
water flow inside Channel (PIPE) T=10cm Concrete /M200
T=10cm Concrete M200 T=100 cm (1:3) stonemasonry
T=100 cm (1:3) stonemasonry T=10cm Concrete/M200
T=10cm Concrete/M200 Natural Ground(Stone Bed)
Natural Ground(Stone Bed)

section :(D-D)
section :(A-A) -Top wide L=30m
-Top wide L=30m - Bottom wide L=15.5m
- Bottom wide L=15.5m

ADA,NCA,PRRD,MEW DWG Dimension NO.7/11


SHEET
SURVEYED BY CHECKED BY ADA Team SCALE PROVINCE Kabul Stone Masonry Gravity Check Dam
cover
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara

DRAWN BY Eng.Noor Rahman"Rahmani" APPROVED BY NCA/UNDP DRAWING NO. VILLAGE


Shamir Bala
Pro.Excavation
Construction wide with both side excavation L=30m
1.5 Existing wide 27m
8.5

10.0

1
0.6 10cm PCC

h=5.0
(1:3) pointing

2.5
dn/stream apron

Existing bed wide L=12.5m

1.5
0.50 1.50
10cm PCC Por. Wide for check dam bed L=15.5m Manhole
0.5

GL
1.1

10cm PCC M:200 T=10 cm concrete


15cm Boulder
0.6

T=100 cm (1:3) stonemasonry


0.5 10cm PCC M:200 T=10cm concrete
15cm Boulder
Existing rock
0.7
1.10 View

Section :(A-A) canal one side


protection wall, L=45m.

DWG Dimension
ADA,NCA,PRRD,MEW
SHEET
SURVEYED BY CHECKED BY ADA Team SCALE NO.9/9 PROVINCE Kabul Stone Masonry Gravity Check Dam
cover
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara

DRAWN BY Eng.Noor Rahman"Rahmani" APPROVED BY NCA/UNDP DRAWING NO. VILLAGE


Shamir Bala
2No.12mm

10mm@15cm c/c

10mm@15cm c/c

All Dimension are in Cm


Section A-A
2No Handle in each slab
10mm@15cm c/c

10

Reinforcement Details 6inch Gate Valve With 8mGI pipe

10
15
Sleeve
150
50

A A

100
150
15

10 15
10

10 15 100 15 10
10 15 100 15 10
150

Gate valve Box Plan


NO.11/11
SHEET
DWG Dimension
SCALE PROVINCE Kabul Stone Masonry Gravity Check Dam
cover
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara ..\..\photo.jpg

DRAWN BY Eng.Noor Rahman"Rahmani" APPROVED BY NCA/UNDP DRAWING NO. VILLAGE


Shamir
Joint filled with
Plan of construction 1:6 cement motar Water Stop installation details & Metal control gate details
joint for one side wall
of stone masonry
Frame support
0.6

25

0.50
5
80*50*4 for frame support 30

0.7
Stone Masonry
Joint filled with @40
1:6 cement motar welded

Wall
Steel sheet must be connected to steel 0.3

to the gate leaf thru M 16Bolt sheet 0.50


0.60

R20
22.5 cm wide @25 galvanized pipe s
PVC Water stop for opening hand wheel Note: Control gate
size (0.6*1.2)m *3
Hand wheel details
No. near to the
Existing reservoir
22.5 cm wide
PVC Water stop
SKIN PLATE
4MM THICK CHANNEL
CHANNEL
12X5X0.6CM 10X4.7X0.5CM

0.50

0.12
0.6 0.60
0.6
A SECTION S-S

Join filled with 1:6 cement sand mortar


HAND WHEEL D=40CM F HAND WHEEL D=40CM

BEARING PLATES &


4BOLLTS 18x16x2 CM BEARINPLATES&4BOLTS
18x16x2cm
CHANNEL12x5x0.6CM0.05 0.05

0.50

0.50
SPINDLE Ø40MM SPINDLE Ø40MM
SPINDLE CONNECTION
SPINDLE CONNECTION
NUT
joint for covered section

NUT
of stonemasonry PCC

SKIN PLATE
Plan of construction

4MM THICK S S
PVC water stop
22.5 cm wide

SKIN PLATE
CHANNEL

1.50

1.50
4MM THICK
12X5X0.6CM

0.05

0.05
CHANNEL
10X4.7X0.5CM
CHANNEL 0.12 CHANNEL
10X4.7X0.5CM 0.50 12X5X0.6CM
0.60 SECTION F-F
F
Canal Flow

PLAN
DETAIL (D)
PLAN
SECTION S-S
SECTION F-F

ADA,NCA,PRRD,MEW ADA Technical Team


NO.10/11

SURVEYED BY
SHEET

CHECKED BY SCALE DWG Dimension PROVINCE Kabul


cover Water Stop and control gate Details
DESIGNED BY Eng Noor Rahman Rahmani REVIEWED BY ADA Technical Team DATE 08/11/2023 DISTRICT Guldara ..\photo.jpg

DRAWN BY Eng Noor Rahman Rahamni APPROVED BY NCA/UNDP DRAWING NO. VILLAGE Shamir
Gabion and stone specification

Technical Specification
Uper Cop
1. Stones used for rock filling should be mountain crashed stone.
Cortoin 2. 3mm thick galvanized steel wire Mesh spacing is (10cm*8cm)
Box edge Bending wire is (3mm)Edge wire is (3.8~4mm).
Box edge 3. Individual stones should be sound, hard and durable

1.0
and should be such that they will be able to sustain weathering
and water action.
4. They should be free from laminations, soft spots,
Side Sheet cracks and other defects.
1.0 5. Min & Max size of stone 1.5 time to 2.5 time of mash opening.
2.0
Lower Sheet 6. Tolerance on size of stone + - 5%.
7. Minimum density 22KN/m3.
8.All dimension are in m or otherwise specified.

River Rounded Stone

1.0
1.0
2.0

SURVEYED BY ADA,NCA,PRRD,MEW ADA Technical Team DWG Dimension


SHEET
NO.1/2

Kabul
CHECKED BY SCALE
cover
PROVINCE
Gabion details
DESIGNED BY Eng Noor Rahman Rahmani REVIEWED BY ADA Technical Team DATE 08/11/2023 DISTRICT Guldara ..\photo.jpg

DRAWN BY Eng Noor Rahman Rahamni APPROVED BY NCA/UNDP DRAWING NO. VILLAGE Shamir Bala Village
Gabion Protection wall plan & section

1
MWL FB0.5

RBL,DN/S RBL,UP/S
1
1
1

2
3
Section A-A

A
16m
A

SURVEYED BY ADA,NCA,PRRD,MEW ADA Technical Team DWG Dimension


SHEET
NO.2/2

CHECKED BY SCALE PROVINCE Kabul Protection wall Plan and section


cover
DESIGNED BY Eng Noor Rahman Rahmani REVIEWED BY ADA Technical Team DATE 08/11/2023 DISTRICT Guldara ..\photo.jpg

DRAWN BY Eng Noor Rahman Rahamni APPROVED BY NCA/UNDP DRAWING NO. VILLAGE Shamir Bala
Shamir Bala Village Road Widening & Cutting Types (Existing)

Section#2 Road Cross Section #2,in


Area Cut
ST:0+350-0+650Km
1.4
0.6
Varies Height
e
3-5 %Slop

3.0
New road surface hard rock (avg-1.3m,cutting)
Natural Ground

Road Cutting Cross sections(Ordinary Soil & Hard soil )

CL
Section#1 Area Cut
Varies Height

1.4
Road Cross Section #1, in
e
0.6 3-5 %Slop
ST:0+00 to 0+350Km
3.0
New road surface hard rock (avg-1.3m,cutting)
Natural Ground

Road Cutting Cross sections(hard Rock & Soil)

Note:LengthofRoadinall2sections=0+650Km
Thefieldengineerisresponsible
foradjustingtheaboveSection
bylookingatthenaturalAreaslope.
Alldimensionsareinm.
ADA,NCA,PRRD,MEW ADA Team
SHEET

SURVEYED BY DWG Dimension


NO.3/3
CHECKED BY SCALE PROVINCE Kabul Road Widening Sections
cover
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara

DRAWN BY Eng.Noor Rahman"Rahmani" APPROVED BY NCA/UNDP DRAWING NO. VILLAGE


Shamir Bala
Shamir Bala Village Road Widening & cutting
Proposed Sections

Section#2
Road Cross Section #2,in
ST:0+350-0+650Km

3-5 %Slope

3.0 Natural Ground

Cross section(Ordinary Soil & Hard soil )

Section#1

Varies Height

Road Cross Section #1, in


3-5 %Slope
ST:0+00 to 0+350Km
3.0 Natural Ground

Cross section(hard Rock & Soil)

Note: LengthofRoadinall2sections=0+650Km
Thefieldengineerisresponsible
foradjustingtheaboveSection
bylookingatthenaturalAreaslope.
Alldimensionsareinm.
ADA,NCA,PRRD,MEW ADA Team
SHEET

SURVEYED BY DWG Dimension


NO.3/3
CHECKED BY SCALE PROVINCE Kabul Road Widening
cover
DESIGNED BY Eng.Noor Rahman"Rahmani" REVIEWED BY ADA Team DATE 08/11/2023 DISTRICT Guldara

DRAWN BY Eng.Noor Rahman"Rahmani" APPROVED BY NCA/UNDP DRAWING NO. VILLAGE


Shamir
Ref: IS 7666/1989 HYDRAULIC DESIGN OF
BARRAGES AND WEIRS - GUIDELINES
Design of Check Dam ,Treasure of RCC design (SUSHAL KUMAR
Page713-954),IRRIGATION ENGINEERING
AND HYDRAULIC STRUCTRUES - SANTOSH
KUMAR GARG -PAGE 333.
Location of Project: Kabul, Guldara,Shamir Vilage
Project Name: Shamir Village Check Dam Enter Only Yellow Cells

Hydraulic design:
Discharge estimation based on Rational method

3
Q = kCIA m /sec 3.50 Cumecs
k, for metric method is 0.278
C, Runoff coefficient 0.6 From table
I, Railfall intensity (mm/hr)
A, Drainage area (Skm) 1.37 Skm

In regions where no IDF curve is available, rainfall intensity could be calculated:

0.38
I = T/(tc+10) 15.33 mm/hr
Where:
T- is return period 50 year
tc- is time of concetration (minutes)
tc = 0.01947 L0.77/S0.385 12.44 minutes
Where:
L - is maximum length of travel 2300 m
S - is catchment slope 0.27
Highest top catchment level 3038.5 m
Level at axis of check dam 2410 m

Design of spillway for Check Dam: Base Width of Check dam

General formula of weir Q = C*Le*He^1.5 B = (H+ dc) / √P 3.57 m


Provide 4m
Pick discharge 3.50 cumecs H=Height of Check dam 5m
to be safe
Head on spillway 0.35 m 1m dc = Depth of flow over crest 0.35 m
Width of spillway 9.95 m P = Specific gravity of material (Random
Provide 10 m Rubble Masonry-2.25)

Design of Apron for Check Dam: Scour Depth


at first shuld be calculate
L = C*H 20.00 m Regime width (Lacey’s) 9.04 m
L = Total length of Apron Regime width of the canal (P)= 4.83 x√( Q) m
C = Bligh’s Creep Co-efficient = 4 to 5 (as the sub-soil is Gravel)
H = Height of weir= 5 Looseness Factor (LF)= Overall length of dam/P
Overall length of check dam = 58 m
Length of downstream Apron Looseness Factor (LF)= 6.42
L2 = 0.696 x C (H)^ ½ 7.78 m Scour Depth on Upstream side
No need
more,it is
down and
Provide 2.5 m hard rock
Normal scour depth (R) = 1.35 (q 2) 1/3 / f 0.07 m
Length of downstream Apron including Talus Maximum Scour depth=1.5R 0.10 m
L3 = 1.2 x C (qH) ½ 8.28 m Provide 0.3 m
Provide 3m upstream cut-off wall depth (d1) 1.8 m stone masonry
q = unit discharge in m/s f = silt factor (varies from 0.8 to 1.2)
q = 1.84 (dc)^ 3/2 0.38 cumecs/m/se (Here assuming f = 1)
Scour Depth on Downstream side
Length of downstream Talus Assume downstream velocity as 1 m/s and breadth of water course
Downstream Talus = L3 – L2 0.50 m equal to length of weir.
q = A x V=> A=q/V (A=D*L), L=1m 0.38 m
Length of upstream Apron Downstream cut-off wall depth (d2) 0.38 m
L1 = L – (L2 + B+2d1+2d2) 5.33 m Provide (d2) 2.5 m Stone masonry
No need
more,there
Provide 1.5 m is hard rock Maximum scour depth below base of the weir d2-d1
0.7

DESIGN OF THICKNESS OF APRON Stilling basin

Total Creep length (Lc)=d1+L1+B+L2+d2 12.3 m Fr=q/(g*y^3)^0.5 10.88


Residual pressure at toe of body wall (RP) y1=q/(2g(H+dc-y)^0.5 0.04 m
RP=H-(H/Lc*Lt) 2.03 m 0.03 m
creep length upto toe (Lt) 7.3 m 0.03 m
Provide (y1) 0.05 m
Thickness of Apron at Toe (masonry) (Tt)=RP/Density of masonry y2=0.5y1((8Fr+1)^0.5-1) 0.209574 m
Density of masonry= 2.5 Where:
0.81 m Fr, froude number
Thickness of Apron beyond Toe at different sections y1, depth of flow (pre-jump depth)
Residual pressure at 4m from Toe & thickness of Apron: H, hight of the wier or water depth
dc, head on spillway
RP=H-(H/Lc*Lt) 0.41 m y2, depth of flow (post-jump depth) y2<H2
creep length upto toe (Lt) 11.30 m h4=y1(0.536Fr+1.04) 0.34
h4, hight of the end sill
Thickness of Apron at Toe (masonry) (Tt)=RP/Density of masonry
Density of masonry= 2.5
0.16 m
Water Level Crest

HL
D/S Pucca Floor
U/S Pucca Floor
t1 t2 t1

d1 d2
L1 B L2
Masonry Gravity Check Dam Calculation for water pressure (Shamir Bala village)

Ref: IS 7666/1989 HYDRAULIC DESIGN OF BARRAGES AND WEIRS - GUIDELINES ,Treasure of


Type of soil
RCC design (SUSHAL KUMAR Page713-954),IRRIGATION ENGINEERING AND HYDRAULIC
STRUCTRUES - SANTOSH KUMAR GARG -PAGE 333. (Hard Rock)
Enter Only Yellow Cells
Item Data Formula calculation Formula Calculation Result
a (m) 2.00 Ph = ɣ(w)*h^2/2 12,500.00
b (m) 4.20 U1 = K*ɣ(w)*h(u1)*b 3,780.00
H (m) 5.00 U2= K*ɣ(w)*h(u1-u2)*b/2 2,400.00
h(b) 1.00 M(u1) = U1*b/2 7,938.00
ɣ(st) (kgr/m3) 2,500 M(u2) = U2*(2/3)*b 6,720.00
V1 = a*H*(ɣst)*1 25,000.00
h1 (m) 5.00 V2 = 0.5*(b-a)*h1*(ɣst) 13,750.00
V3 = b*h(b)*(ɣst) 10,500.00
ɣ(w) (kgr/m3) 1,000.00 ∑V = V1+V2+V3- (U1+U2+VE) 40,607.50 ∑V 40,607.50
h/3 (m) 1.67 VE = 0.05* (V1+V2+V3) 2,462.50 ∑Ph 18,812.50
hw (m) 5.00 M(v1) = V1*X1 80,000.00 ∑MR 122,216.67
h2 25.00 M(v2) = V2*X2 20,166.67 ∑Mo 55,902.00
M(v3) = V3*b/2 22,050.00
M(net) = Mv1+Mv2+Mv3-
ɣ(w)*h 0.00 (Mu1+Mu2+Mph+Me+MPie1+MPie2+MPie3) 69,256.17

K 1.00 ∑Ph = Ph+Pe+Pe1+Pe2+Pe3 18,812.50 S.F.S = (∑V*μ)/∑Ph 1.51 Stable


M(ph) = Ph*h/3 20,833.33 SFO =∑MR/∑Mo 2.19 Stable
X = ∑M(net)/∑V(net) (m) 1.71
μ 0.70 e = b/2 - X 0.3945 Fmax=Ww/b(1+6e/b)(kg/m2) 15,117.29 Compression
(2/3)*b 2.80 M(VE) = 0.05*[(M(v1)+M(v2)+M(v3)] 6,110.83 Fmin=Ww/b(1-6e/b)(kg/m2) 4,219.61 Compression
X1 (m) b-a/2 3.20 ∑V/b= 9,668.45
X2 (m) (b-a)2/3 1.47 (1+6e/b)= 1.56
b/6 0.70 (1-6e/b)= 0.44
Kh 0.10 Pe = 0.555*ɣ(w)*Kh*H^2 1,387.50
b/2 2.10 Me = 0.424*Pe*h 2,941.50
h(u1) 5.70 Pei1 = 0.1*V1 2,500.00
h(u2) 0.90 Pei2 = 0.1*V2 1,375.00
h(u1)-h(u2) 4.80 Pei3 = 0.1*V3 1,050.00
MPie1 = 0.1*Pei1 6,250.00
MPie2 = 0.1*Pei2 4,583.33
MPie3 = 0.1*Pei3 525.00

a
X1

X2
V1 h1
h V2 Stone masonry
H
Ph C.G
h/3 W
R
h(b) ɣ(w)xh heel V3 Toe

e X
b/2 b/2

Fmin Fmax

ɣ(w)xh(u2)
ɣ(w)xh(u1)
Uv2 Uv1
1.511729 (kg/cm2)
0.421961 (kg/cm2)

Note:
U Uplift Force (Upward)
Mu Uplift force Moment
H Total Height
hw water height
Ph Water Force
χ Distance from toe to Resultant point
e (exce..) distance from X to centre of base
C.G Centre of Gravity
F(min/max) Stresses on toe and heel (shall be >0)
K Seepage Coeficient (in hard foundation it is 1)
V Total vertical Weight
∑Ph Total Horizontal load
h1 D/S inclined height
Pe Hydrodynamic Force (VAN-KARMAN)
Me Moment of hdrodynamic force act at (4H/3Pi)
Kh is the friction of gravity adopted for horizontal acceleration, such as 0.1, 0.2
Pei Horizontal Intertia forces due to earthquak
Mpei Moment of horizontal intertia forces due to earthquake
VE Vertical earthquake forces (Upward)
MVE Moment of Vertical earthquake forcess (Upward)
h(u1) Uplift pressure head (first corner)
h(u1) Uplift pressure head (second corner)

h(u1) 5.700 m
h(u2) 0.900 m
Cost/Unit Total Cost
S/NO Discriptions Unit Quantity
(Afs.) (Afs.)
Remarks

A1 BoQ for Check Dam


Site preparation (Existing site Cleaning and removing the debrise along the river up stream of check dam,
1 including cutting of the sides of the reservoir up to the zero level with transportation the waste materials to the LS 1.00 0
other site) the area will be selection by ADA or NCA Engineer consulting the village malik.

3
2 Excavation of the foundation of check dam Irrigation canal lining and intake M 375.00 0

Provide, install and fill the gabion basket (1x1x2) m with stone in place, having mesh size not more than
(80x100) mm as per relevant drawing, specification and complete satisfaction of the site engineer. (2.7 to 3)
3
3 mm galvanized mild steel wire should be used for the mesh with zinc quantity not less than 260 gr/m2 and M 138.20 0
(3.4 to 4) mm galvanized mild steel wire with zinc quantity of not less than 275 gr /m2 for the frame. The
gabion boxes shall be fabricated 'Maccaferri' type or equivalent supplied by an approved manufacturer.

Casting Plain Cement Concrete (PCC), M200 kg/cm2 (1:1.5:3), the PCC should be properly leveled,
3
4 including the preparation, shuttering, pouring, compacting, curing and with all requirement activities, cement M 39.80 0
used in PCC should be of best quality. If should be tested
Casting Reinforced Cement Concrete (RCC), M250 kg/cm2 (1:1:2) with shuttering, steel and curing at least
5 M3 3.20 0
14days during hot weather condition and 7days during cold weather condition.
6 installation of water stoper inside the expansion joints where needed m 27.00 0
Stone masonry construction of the check dam, and canal, with cement- sand mortar M400:1:3, the stone must
7 be mountain stone and solid, clean and free of dust. And according to site engineer guidance. With at least M3 683.30 0
35% mortar all activities as per drawings
Pointing for both side of Check dam and walls and canal with mortar 1:3 (cement -sand), with all
8 M2 469.30 0
requirement activities. The pointing should be outer
9 Signboard ( Digital ) Pcs 1.00 0
10 Large size tent Pcs 1.00 0
Operating the 3" water pump for draining the water to downstream as per need of the villagers, while
11 Day 20.00 0
operating NCA and ADA engineers should be informed and the days will be counted to supplier
12 3 inch HDPE pipe for water pump M 50.00 0
13 6 inch Gate valve best quality (bronz) No 1.00 0
14 GI pipe IIL-EEL 6" to be connected with Gate Valve M 8.00 0
15 Supply and installation of metalic control gate according to drawing No 4.00 0
16 Glass wool (10cm) thick best quality which will be selected by Engineer m2 50.00 0
17 Anti-Freeze Isomat #1 quality Adium 150 liter 60.00 0
18 First Aid Kit kit 1.00 0
Inside of reservior existing rock cutting and removing with seapage control of the existing reservoir by stone
19 LS 1.00 0
boulder, plastic, gravel, bitument , PCC and inside plaster for wall.
Excavation, hard cutting and soft cutting in rock hill and soil hill by lentgh of 650m and 3width site visit is
20 LS 1.00
must, to see the amound of cutting

Sub-Total Cost for Check Dam (Afs.) 0


Climate Resilient Water Infrastructure Improvement Project (CR-WIP)
Stone Masonry Check dam, Parts of Irrigation Canal, Small size Intake and Gabion
protection wall Projects Implementation Work Plan
DURATION Date:2023-2024
First Month Second Month Third Month Fourth Month Fifth Month Sixth Month Seventh Month
Activities Description of Activiteis
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

1.00 Site preparation


2.00 Foundation Excavation

3.00 PCC-M150 -1:2:4

4.00 Gabion

5.00 Stone Masonry M300 (1:4)

6.00 Pointing

7.00 Shuttering

8.00 Curring

9.00 RCC

10.00 Steel bar

11.00 Back filling

12.00 Road Cuttin and preparation

13.00