SEI MANGKEI SPECIAL ECONOMIC ZONE INVESTMENT PROJECT

Overview

Location Simalungun Regency


Infrastructure : IDR 5,1 Trillion
Investment Value
Investor/Tenant : IDR 129 Trillion
Total Area / Land Status 1933,80 Ha/ Land Management Rights (HPL)
Mode of Offer Financing and Direct Investment
PROJECT’S Project Owner PT. Kawasan Industri Nusantara
IMAGE/ Palm Oil & Downstream Industries
LOCATION Main Industries Rubber & Downstream Industries
IMAGE
1) Infrastructure availability.
2) Government provisions and support.
3) Land used : 241,14 Ha / 12.57% from total
area (updated July 2020).
Project Description 4) Investment realization : IDR 5,920 Billion
Project Status
• Sei Mangkei is an industrial area located at the raw materials center which (consist of IDR 793 Billion on infrastructure and
based on agribusiness, such as palm oil and rubber. IDR 5,127 Billion on Direct Investment)
5) Direct investment is allowed to construct and
• SEZ Sei Mangkei is divided to 3 zones : own buildings or other structures on the land
 Industrial Zone : Palm Oil Downstream Industry Zone (oleochemical, (max. 30 years and extendable for another 20
refinery, biodiesel), Rubber Downstream Industry Zone, Production years).
Supporting Facilities, Various Industry Zone (electronic, electricity), Small Contact Person:
& Medium Industries.
Name : Muhammad Fadillah
 Logistic Zone : Dry Port, Tank Farm, Warehousing, Packaging. Mobile : +62811-6322-330
Email : marketing@seimangkeisez.co.id
 Tourism Zone : Hotel, Golf Course, Commercial Area, MICE (Meeting,
Incentives, Convention & Exhibition). © 2018 by Indonesia Investment Coordinating Board. All rights reserved
1
SEI MANGKEI PROFILE

Developer : Total Area : Main Activities: Estimated Investment


PT Perkebunan 1.933,8 Ha  Palm Oil Processing Industry (until 2031):
Nusantara III (Persero/ (HPL No, 1/2014)  Rubber Processing Industry Infrastructure : IDR 5,1 Trillion
State Owned Investor : IDR 129 Trillion
Company))

Location : Determination : Direct Labor Projection: Impact on the Economy:


Simalungun Government Regulation 83.304 people Increased Output of IDR 92,1
Regency, North No. 29 year of 2012 Trillion to the National Economy
Sumatera Officialy Opened:
Januari 27, 2015
SEI MANGKEI SPECIAL ECONOMIC ZONE
Accessibility

Highway
Connection
Kualanamu-Tebing Tinggi
Accesibility to Sei Mangkei has Medan-Kualanamu ± 38 Minutes
± 17 Minutes
become easier, with and efficient and
adequate highway from Medan and
Highway of Medan-
Belawan to Sei Mangkei. Kualanamu-Tebing Tinggi
(63,5 Km)
Highway of Belawan-
Medan-Tanjung Morawa
(34,4 Km)

SEZ Sei Mangkei

Aerocity
3
SEI MANGKEI SPECIAL ECONOMIC ZONE
Zoning Area

Land Usage Rate

12,57% of the total area 4


HIGHWAY CONNECTION

/
AEROCITY
Kualanamu-Tebing Tinggi
Medan-Kualanamu ± 38 Minutes
± 17 Minutes

Highway of Medan-
Kualanamu-Tebing Tinggi
(63,5 Km)
Highway of Belawan-
Medan-Tanjung Morawa
(34,4 Km)

SEZ Sei Mangkei

Aerocity
SEI MANGKEI SPECIAL ECONOMIC ZONE INVESTMENT PROJECT
Accessibility

STRATEGIC ACCESS to Thailand, Asia,


Belawan Seaport
KEK SEIMANGKEI (146 Km) Eropa, dll

Kualanamu
Internasional Airport
(106 Km)
Kuala Tanjung Seaport
(40 Km)
Medan City
(125 Km) to Malaysia

to Singapura,
Jakarta and Pasifik

10
6
UTILIZATION AND FACILITY
SEZ SEI MANGKEI
Inside SEZ Sei Mangkei :
* MMSCFD = Million Metric Standard Cubic Feet per Day
 
  Outside SEZ Sei Mangkei
Roads WTP 250 m3/hour WWTP 250 m3/hour


  
Kualanamu
Electricity International Airport
150 KV / 60 MVA Railway
  

  

Gas Pipeline
75 MMSCFD Highway :
SEZ Sei Mangkei
1. Medan – T. Tinggi Kuala Tanjung Seaport :
2. T. Tinggi – Kisaran  400.000 TEUs
3. T. Tinggi – P. Siantar Container
 3.5 Million Tons Bulk
 
 
Telecomunication Dry Port Tank Farm
Network 2300 TEUs and 2 x 3000 Ton CPKO
& IT (Fiber Optic) 5 x 5000 Ton CPO
Railway Station