Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

A B C D B E F G

13950

3450 1350 1350 3450 3150 1050

150 3300 150 1200 150 1200 150 3300 150 3000 150750 300

900 1800 1200 900 150 900 1200 1800 1500 1800 1800

W W W W W
02 03 03 02 02

150

150

150
1 1

1200
KITCHEN

1650

1650
BATH BATH DW

2250

2250

2400
FLOOR:
PORCELAIN TILES 01
FFL +0.00
BEDROOM BEDROOM
CL -0.05

4050

3900

1800
FLOOR: FLOOR:

150750

150750
W PORCELAIN TILES D D PORCELAIN TILES
02 FFL +0.00 02 02 OPENING

1500 150
FFL +0.00
CL -0.05 CL -0.05
TER.
2
800 1150
3 2 1

1650
UP
STORE

2400
1500
1950 900
D
1800 150 1200 900
D 750 1800
W 150 900 150 1950
01 01 02

150 1200 150

150
3 3 A
A

900
1350

BATH

OPENING

1500

1650
900
W DW
03 CORRIDOR
D 02 DINING

600
3150

150
02
4 FLOOR:

3000
1800
PORCELAIN TILES
900

D
1050 750150 01 2700 FFL +0.00
W
02 4A
4050 CL -0.05

1800

1496
W
02
OP
EN
1650
BEDROOM
3450

3300

1800

IN
17

150
W G
5
15000

15000
FLOOR: 50

1950
03 PORCELAIN TILES

3900
FFL +0.00
CL -0.05

2495
1350
150

HALL
6 FLOOR:

4354
4200
1800
PORCELAIN TILES W
FFL +0.00 01
1950

1800

900

W
03 BATH W.I.C CORRI. CL -0.05

900
D

OPENING

1500
D 01
02
150

1350
1650

1500 750 750

300

150
2455
W
7A
W
01 01

1500
MASTER BEDROOM DD
FLOOR: 01 TERRACE
4050
3900

2400
1800

2700
W PORCELAIN TILES FLOOR:
02 FFL +0.00 PORCELAIN TILES
CL -0.05 FFL +0.15
D
02 CL -0.20

1800

600300
1200

V.WC 3 8

600
2
150

9 W
UP
1 9
W
02 04

1575 1800 2025 600 1050 1500 2250 1500 600 1050

500 5300 150 1500 150 6150 150 900 150

4800 1650 6300 1050

14450

A C D1 B F G
GROUND FLOOR PLAN
A B C D B E F G
13950

3450 1350 1350 3450 3150 1050


ROOF
- CORRUGATED LONG SPAN ROOFING SHEETS
- 50X75MM TREATED H.W PURLINS AT 1.0M C/CS
- 50X50 CEILING HANGERS AT 1200MM C/CS
- ACOUSTIC CEILING RUNNERS AT 600 C/CS
- PLASTERBOARD CEILING

1 1

2400
4050
2

1650
3 3 A
A
1350

1650
4
4A

1496
3450

5
15000

15000
6

4354
1950

7
7A
4050

2700
8

600
9 9

4800 1650 6300 1050

13950

A C D1 B F G
ROOF FRAME PLAN
A B C D B E F G
13950

3450 1350 1350 3450 3150 1050

ROOF
- CORRUGATED LONG SPAN ROOFING SHEETS
- 50X75MM TREATED H.W PURLINS AT 1.0M C/CS
- 50X50 CEILING HANGERS AT 1200MM C/CS
- ACOUSTIC CEILING RUNNERS AT 600 C/CS
- PLASTERBOARD CEILING

1 1

2400
4050
2

1650
3 3 A
A
1350

1650
4
4A

1496
3450

SLOPE 5
15000

15000
6

4354
1950

7
7A
4050

2700
8

600
9 9

4800 1650 6300 1050

13950

A C D1 B F G
ROOF PLAN
ROOF
- CORRUGATED LONG SPAN ROOFING SHEETS
- 50X75MM TREATED H.W PURLINS AT 1.0M C/CS
- 50X50 CEILING HANGERS AT 1200MM C/CS
- ACOUSTIC CEILING RUNNERS AT 600 C/CS
- PLASTERBOARD CEILING

A C E G
13952

4799 4801 4197

ROOF +
5250

1400 100
1500

1500

375450
150X300 RC BEAM 150X300 RC BEAM

1050

225
5250

5250
3000
1200
BATH CORRIDOR DINNING

2100
150 900
GL + 600 FINISH FLOOR: FINISH FLOOR:
PORCELAIN TILES PORCELAIN TILES

600
TL -00

450
HARDCORE FILLING HARDCORE FILLING

EARTH EARTH EARTH

SECTION A-A

ROOF
- CORRUGATED LONG SPAN ROOFING SHEETS
- 50X75MM TREATED H.W PURLINS AT 1.0M C/CS
- 50X50 CEILING HANGERS AT 1200MM C/CS
- ACOUSTIC CEILING RUNNERS AT 600 C/CS
- PLASTERBOARD CEILING

9 8 7A 4A 3 1
15000

600 2700 5850 1650 4050

ROOF +
5250

1400 100
1630

600 450
150X300 RC BEAM 150X300 RC BEAM

5250
3020

1200
TERRACE HALL CORRI. BEDROOM

150 900
GL + 600 FINISH FLOOR: FINISH FLOOR:
PORCELAIN TILES PORCELAIN TILES

TL -00

450
HARDCORE FILLING HARDCORE FILLING

EARTH EARTH EARTH

SECTION B-B
A C D1 F G

FRONT ELEVATION

1 3 4 6 7 9

LEFT ELEVATION
G F E D C B A

BACK ELEVATION

9 8 7A 5 4A 3 2 1

RIGHT ELEVATION
WINDOWS AND DOOR SCHEDULE

1500 1800
900 600

1200

600
600
1500
WINDOWS

SCHEDULE MARK W 01 ( EXTERNAL) W 02 ( EXTERNAL & INTERNAL) W 03 ( EXTERNAL ) W 03 ( EXTERNAL )


ALUMINIUM DOUBLE GLAZED ALUMINIUM DOUBLE GLAZED ALUMINIUM DOUBLE GLAZED ALUMINIUM DOUBLE GLAZED
TYPICAL SLIDING WINDOW WITH FIXED GLASS SLIDING WINDOW SLIDING WINDOW SLIDING WINDOW

QUANTITY 3 No. 9 No. 5 No. 1 No.

DESCRIPTION - POWDER COATED ALUMINIUM FRAME - POWDER COATED ALUMINIUM FRAME - POWDER COATED ALUMINIUM FRAME - POWDER COATED ALUMINIUM FRAME
GREY COLOURED GREY COLOURED GREY COLOURED GREY COLOURED
- FRAME WITH, 4+4 LAMINATED - FRAME WITH, 4+4 LAMINATED - FRAME WITH, 4+4 LAMINATED - FRAME WITH, 4+4 LAMINATED
CLEAR GLASS CLEAR GLASS CLEAR GLASS CLEAR GLASS
- LOW EMISSION ( EXTERIOR WINDOW) . - LOW EMISSION ( EXTERIOR WINDOW) . - LOW EMISSION ( EXTERIOR WINDOW) . - LOW EMISSION ( EXTERIOR WINDOW) .

HALL BEDROOM,KITCHEN &


LOCATION BATH V.W/C
DINNING

1500 900 750 2250 1500

900
1200
2098

2100
2098

2098

2100
DOORS

SCHEDULE MARK DD 01 ( EXTERNAL ) D 01 ( INTERNAL ) D 02 ( INTERNAL ) DW1 ( EXTERNAL ) DW 02 ( INTERNAL )


SOLD CORE WOODEN FLUSH SWING SOLD CORE WOODEN FLUSH SWING
SOLD CORE WOODEN FLUSH SWING SOLD CORE WOODEN FLUSH SWING SOLD CORE WOODEN FLUSH SWING HINGED DOOR ASSEMBLED WITH HINGED DOOR ASSEMBLED WITH
TYPICAL HINGED DOOR HINGED DOOR
HINGED DOOR ALUMINIUM GLAZED WINDOW ALUMINIUM GLAZED WINDOW
QUANTITY 1 NO 4 NO 5 NO 1 NO 1 NO

DESCRIPTION - FRAME WITH ARCHITRAVE, - FRAME WITH ARCHITRAVE, - FRAME WITH ARCHITRAVE, - FRAME WITH ARCHITRAVE,
- FRAME WITH ARCHITRAVE,
STAINLESS STEEL BUF.O HINGES STAINLESS STEEL BUF.O HINGES STAINLESS STEEL BUF.O HINGES STAINLESS STEEL BUF.O HINGES STAINLESS STEEL BUF.O HINGES
HANDLES WITH PC CYLINDER (3 KEYS) HANDLES WITH PC CYLINDER (3 KEYS) HANDLES WITH PC CYLINDER (3 KEYS) HANDLES WITH PC CYLINDER (3 KEYS) HANDLES WITH PC CYLINDER (3 KEYS)
- DOOR STOPPERS - DOOR STOPPERS - DOOR STOPPERS - DOOR STOPPERS - DOOR STOPPERS

LOCATION BATH & V.W/C KITCHEN CORRIDOR


TERRACE BEDROOM
A B C D B E F G
13950

4800 4800 3150 1050

F1 F1 F1 F1
C1

150

150
1 1
C1 C1 C1
F2
150 4650 150 4650 150 3000 150
C2

4050

3900

3900
2

F1 C1 F1 C1 F1 C1 F1 F1

150 1200 150

150
3 C1
3 A
A C1
1350

1500

1650
F1 F1 150 3000 150
F1
4

150
C1 C1 C1 4A
F1

1496
F1 F1
C2
3450

3300
5
15000

15000
C2 C1
F1 F1 F1

5700
150

6 C1
C1

4354
C1
1950

1800

F1 F1
150

7 F1 F1
C1
C1

150
C1
C1
7A
150 4650 150 1500 150 6150 150
4050

3900

2550

2700
F1
150
F2 F2

F1 F1 8

600
150

9 C1 C2 C2 9
C1 C1

4800 1650 6300 1050

13950

A C D1 B F G
FOUNDATION PLAN

You might also like