DHARMARATHNA CONSTRUCTION

Station Road, Angulana, Ratmalana


Tel: 0761634784

May 06, 2024


Lanka Transformers (PVT) LTD,
Galvanize Plant,
Makola Road,
Sapugaskanda.

Dear Sir,

QUOTATION FOR CONSTRUCTION OF BOULDERING WALL WITH FENCE FOR LTL


(PVT) LTD AT SAPUGASKANDA
STAGE - 01 (28M LENGTH)

Description Qty Unit Rate Amount

Cleaning of site with removing existing


1. Item Allow Amount
fence items. 18,500.00

2. Earth excavation for foundation. 40.6 m3 3,500.00


142,100.00

3. Gr. 15 concrete for screed. 28 m2 1,250.00


35,000.00

Gr. 25 concrete base for RR wall with


4. 6.3 m3 42,000.00
column foundation. 264,600.00

5. RR masonry in 1:5 ct mortar. 59.5 m3 24,000.00 1,428,000.00

Provide 90 mm dia weep holes. (up to


6. 12 NOS 450.00
ground level) 5,400.00

7. Gr. 25 concrete for tie beams. 1.56 m3 42,000.00


65,520.00

8. Gr. 25 concrete for column shaft. 3.2 m3 42,500.00


136,000.00

9. Form works for above concrete works. 57 m2 2,500.00


142,500.00

Reinforcements 10 mm T/S and 6 mm


10. 6.58 Kg 495.00
m/s stirrups for columns and tie beams. 325,710.00

Supplying, bending and fixing 40 mm x


11. 10 NOS 1,250.00
40 mm L iron for barbed wire fencing. 12,500.00

1
Chain link fencing fixed to concrete
12. columns with fixing 25 mm dia GI 84 m2 1,750.00 147,000.00
pipes along the top of fence.
Supplying and fixing barbed wires top
13. 28 L.m 850.00 23,800.00
of the chain link fence.
Applying weather shield paints for
14. 70 m2 1,250.00 87,500.00
concrete columns and tie beams.

15. Dewatering. Item Allow Amount 75,000.00

Extra excavation with shoring works


16. and ABC filling including well 28 Lm 20,000.00 560,000.00
compacting.

TOTAL AMOUNT 3,469,130.00

Supplying spreading and well


compacting earth above the boundary
17. 1 m3 5,500.00
wall if necessary. (earth filling works
measured separately)

TERMS & CONDITIONS -

 We have given a very competitive and realistic quotation according to prevailing market price, and
if our quotation is accepted please pay 50% advance on confirmation and 30% progress payment
And balance after completion of the job.

 This quotation is valid for a period of 10 days from 06/05/2024. Any additional works shall be
charge separately .

We trust this quotation meet with approvals and look forward a favourable reply assuring you of our best
attention at all times .

Best Regards,

........................
Signature