KEY PLAN

300MM

ROW WIDTH-18M
C/L OF POND
5M

5M
Kannayagudem

POND BANK

POND BANK
POND ROW

POND ROW
PARADIP
TPEG-21 HYDERABAD
TPEG-22

13M

13M
Kandad
nouram

17M BANK Yadavo


lu

OFC CABLE NOTES :

1. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE


MENTIONED.

2. THE VALUE OF R (RADIUS OF BEND) IS 40D


(D= OD OF PIPE).
16" O.D. x 0.375" WT API5LX70
3. THICKNESS OF CONC. COATING IS 50mm.

4. 40mm HDPE PIPE IS STRAPPED WITH MAINLINE PIPE WITH


SS STRIPS OF 3 4" WIDTH (4 STRIPS PER PIPE).

5. CAST-IN-SITU CONCRETING (1:1.5:3) OF THICKNESS 50mm


IS DONE AT WELD JOINTS FOR SECURING / TYING THE
HDPE CONDUIT WITH MAINLINE PIPE.

6. DEPTH OF MAINLINE COVER BEYOND TRANSITION PUP IS


GRADULALY BROUGHT TO NOMINAL COVER OF 1.20M.

C/L OF POND
CH=733.206
OVER- 8 SAG- 8 OVER- 8
SAG- 8

CL A
CL S.NO. REFERENCE DRAWING DWG. NO.

1. ALIGNMENT SHEET L&T-PHPL-SP06B-ALN-09

A
12m(Thik-9.53) 12m(Thik-9.53) 12M CWC 12m(Thik-9.53) 12m(Thik-9.53)
Total crossing Length-60M

00

IN SIGN IN SIGN
NO DATE REVISION BY CHKD. APPD.
CHKD. BY IOCL APPD. BY IOCL

INDIAN OIL CORPORATION LIMITED


OWNER
PIPELINES DIVISION

PARADIP - HYDERABAD PIPELINE


PROJECT VISAKHAPATNAM TO HYDERABAD SECTION

M/S. L&T HYDROCARBON ENGINEERING LTD.


CONTRACTOR

TITLE SUBMERGED CROSSING AT CH.733.206 KM

SCALE DRAWING NO. SHEET NO. REV.


AS
1 : 100 L&T-PHPL-STD-HW-00-00 1 OF 1 BUILT