RAIL VIKAS NIGAM LIMITED

KNOWLEDGE ENHANCEMENT
MAJOR ISSUES DURING PILE FOUNDATION CONSTRUCTION AND
REMEDIES
Contribution: Karthick.PM Date: 20-08-2022

 There are several issues that may be encountered during pile foundation
construction. These problems will cause deficiency in the capacity of the pile
unless they tackled properly. These pile construction problems and with their
causes and required measure to prevent them are discussed in the following
sections.

MAJOR ISSUES DURING PILE FOUNDATION CONSTRUCTION

Probable Piling problems are classified as follows:

1. Pile formation problems


2. Concrete faults
3. Reinforcement installation issues
4. Working load faults

1. PILE FORMATION PROBLEMS

1.1 Concrete or Permanent Steel Casing Deterioration


 Concrete or permanent steel casing may be damaged due to driving piles
forcefully over obstruction or driven mandrel is out of plumb. Another problem
that concrete or permanent steel casing may suffer from is their initial defection.
This problem can be prevented by supervising casing installation and inspect the
work before concrete placement. Finally, if this problem occurs, the pile should
be withdrawn and reinstall it properly.

DRIVEN OF SHELL AND MANDREL

1.2 Collapse of Pile Sides


 If casing is not provided, pile sides would collapse in soft and loose soil. This
problem can be observed and solved supervisor. The solution is to install casing.

1.3 Excessive Water in Pile


 Groundwater flow into the construction site is the cause of excessive water in
pile. Utilization of steel casing or bentonite would eliminate this problem.

1.4 Lateral Movement and Uplift of Adjacent Pile While Pile Casings are Driven
 It is caused by displacement and heave around pile installation location. Such
movements can be observed through checking plan position and level of
neighboring piles. Engineer shall decide on the technique used to solve lateral
movement and uplift of adjacent piles.

1.5 Settlement of Adjacent Structures or Adjacent Ground


 Adjacent settlement is caused by vibrations in sandy soil during driving piles.
Sinking holes of bored piles in soft clay of water bearing sand is another cause
of adjacent settlement of buildings. Such problem can be noticed by checking
level of buildings or ground before and during pile construction. Lastly adjacent
ground or structural settlement may be declined or minimized by keeping head
of water in the casing during boring piles. Added to that, site engineer may select
suitable solution for the problem.
2. CONCRETE FAULTS

 Pile construction problems due to concrete faults involve:

2.1 Inadequate Concrete Strength


 Insufficient strength is due to poor mix design or concreting operation.
Commonly, cylinder or cubic concrete samples are taken from each mix and
tested to find out concrete strength. This issue is solved through proper mix
design with appropriate workability and practice good quality control during
concreting.

2.2 Voids in Concrete Pile


 Voids may be formed due to improper compaction of concrete in piles with no
casing or with casings that is not pulled up after construction is completed. In
this case, the construction shall be monitored properly to ensure sufficient
compaction of concrete using suitable techniques. Moreover, if casings are
withdrawn, then the withdrawal of casing may lead to create voids in concrete.
Voids can be prevented in this case by cleaning casings and guarantee that
sufficient concrete volume is poured.

3. REINFORCEMENT INSTALLATION ISSUES

 Steel bars are likely to move laterally or being dragged down during compaction.
There are number of reasons that led to reinforcement disposition for example
improper placement of spacers, careless techniques, and defective anchorage of
steels in some pile types. It is required to check steel cage during fabrication in
accordance with specifications and monitor installation process to prevent such
issue. Lastly, pile steel cages shall be supported firmly at the bottom and spacers
need to be provided in accordance with applicable codes.

4. WORKING LOAD FAULTS

 Piles may suffer damages due to testing loads or permanent working loads. In the
following sections, working load faults will be classified based on the type of
construction methods used.

 Driven pile working load faults


 Working load faults in bored piles
 Working load faults in mechanically augured piles

4.1 Driven Pile Working Load Faults


 There are number of factors that make the driven pile to suffer deterioration and
damages under working loads. For example, improper concrete placement
method that used for concrete in the core of driven shaft, lifting of pile due to
ground heave, inadequate concrete in bulb for bulb ended; bored; and driven pile,
wrong space employed, and insufficient driven resistance. These detrimental
factors may be eliminated by checking volume of concrete placed, hammer drop
and blows per miter, designated spacer type, and clear method of construction.

4.2 Working Load Faults in Bored Piles


 Factors that lead to bored pile damages under working load include weakening
of ground around the pile due to wrong pile boring technique, insufficient
concrete cover due to steel cage displacement, poor execution of concrete
placement, and inadequate depth with respect to the soil or rock properties
encountered. To ensure that sufficient depth is provided, it is required to check
the consistency of spoil. Additionally, it is required to practice great cautions
during boring and concrete placement to prevent undesired consequences of
these operations.

4.3 Working Load Faults in Mechanically Augured Piles


Factors that may lead to mechanically augured pile failure under working load include:

 Inadequate diameter to under reamed base. This could be prevented through


continuous noticing of major drilling and under reamed machines are working as
checked above the ground.
 In adequate depth with regard to encountered soil properties. it is recommended
to monitor spoil during boring.
 Using improper technique for concrete placement
 Insufficient concrete cover
 Ground around shaft or beneath base weakened due to improper boring
technique.

*****************