TECHNICAL REPORT # 12827


- Date : 2024-05-06
- Customer : 10. Adif ‫أديف‬
- Project : 2002 -
- PO :
- Site : HHR station @ KAEC
- Reported By : Nader Kamal Fayez
- Subject : Inspection of fire alarm program

Report:

We inspected the fire alarm software of SECTRON panel in the car park B and found:
- The MGC software can connect All the panels via netwok with no problem.
- The network of SECTRON panels consist of 19 network panels.
- We succeded in changing the ESD dongole number to be 5032 same as the old ESD number of panels.
- The data couldn't be taken from the network panel as it is giving failure during progress of transfering.

The solution:
- The only way to solve the fire panels is to write a new program again from scratch then send to all panels.
- We will use the point list shown in the panel and take it point by point then make the new program.
- The new program will be delivered to the customer.
--------------------------
END

Attached picture ( 1 )

All nodes are connecting by MGC software easily

2024-05-06

Attached picture ( 2 )

Failure during taking data from panels

2024-05-06

https://fluid.emco-db.com/sc_all_prnt1.php?id=12827 1/2
5/8/24, 1:56 PM Fluid

Attached picture ( 3 )

ESD Dongole number in panels

2024-05-08

https://fluid.emco-db.com/sc_all_prnt1.php?id=12827 2/2

You might also like