ANALISA HARGA SATUAN

1 Memasang 1 buah Kloset Duduk / Monoblok a h i


Bahan
Kloset Duduk / MonoblOH 1.00 bh 1,460,810.00 b
Perlengkapan 30% Dari bahan 438,243.00 c
Tenaga
Perkerja 3.30 OH 85,000.00 d
Tukang Batu 1.10 OH 95,000.00 e
Kepala Tukang 0.00 OH 108,000.00 f
Mandor 0.16 OH 115,000.00 g

2 Memasang 1 buah Wastafel a j k


Bahan
Wastafel lengkap accessories 1.00 bh 701,190.00 b
Perlengkapan 12% Harga Wastafel 84,142.80 c
Semen Portland 6.00 Kg 1,176.00 d
Pasir Pasang 0.01 m3 172,880.00 e
Tenaga
Perkerja 1.00 OH 85,000.00 f
Tukang Batu 1.45 OH 95,000.00 g
Kepala Tukang 0.15 OH 108,000.00 h
Mandor 0.10 OH 115,000.00 i

3 Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m3 a h i


Bahan
Bak Mandi Fiber 1.00 bh 391,490.00 b
Perlengkapan 18% Harga Bak 70,468.20 c
Tenaga
Perkerja 1.80 OH 85,000.00 d
Tukang Batu 2.70 OH 95,000.00 e
Kepala Tukang 0.54 OH 108,000.00 f
Mandor 0.11 OH 115,000.00 g

4 Memasang 1 bh Kran Ø ¾" atau ½" a h i


Bahan
Kran Air (Sanei) 1.00 bh 31,500.00 b
Seal tape 0.03 bh 4,670.00 c
Tenaga
Perkerja 0.01 OH 85,000.00 d
Tukang Batu 0.10 OH 95,000.00 e
Kepala Tukang 0.01 OH 108,000.00 f
Mandor 0.01 OH 115,000.00 g

5 Memasang 1 bh Shower Ø ¾" atau ½" a h i


Bahan
Shower Ø ¾" atau ½" 1.00 bh 730,000.00 b
Seal tape 0.03 bh 4,670.00 c
Tenaga
Perkerja 0.01 OH 85,000.00 d
Tukang Batu 0.10 OH 95,000.00 e
Kepala Tukang 0.01 OH 108,000.00 f
Mandor 0.01 OH 115,000.00 g