‘JOTUN WELDER QUALIFICATION REGISTER
IDRTRACTOR FE GREGAN SURGES ANDI ERGERING
ROWECT Naw ——~ JOTUN EW WATER BASED FICTORY PROJECT
na] warner nave ELBERT woqrno. | weuowe [ wauone TALE T asuera. | ena-rwo. | ena. | Pmer
TP warm | wp Lem cow [oe | mse [onmoon| oe [6 | me
weorois | cuw | | eae [anna] ee | «| oe
eleesee wear ouw | ee | exo [wnrrwn| ee | 6 | nm
ee ‘wearyois | GtAw co ‘eeao | Asia Test aa 6 PPE 1122023
a 6 Wan yA # i
pet Detemagr 202% aad fe‘Document No: FM-223
Revision 1
Revised On 25 Apr. 2008,
=P
WELDER PERFORMANCE QUALIFICATION TEST (WPQT)
JOTUN NEW WATER BASED FACTORY PROJECT
Record No. : WPOT/O14
Date of Test : 1 Des 23
[current Type and Polarity (A, DCEP, OCEN)
[company Name I Talye Snar Raya Teknik [Welder Gentfication Ne
[wos wo. ‘GEME/WPS/ASME Sec. /8/B7001 [specication of Base Metal = ASIZTP30NL
[Weider Name TAM MOT [rine Zi mm
‘Testing Variable and Qualification Limit
‘Welding Variables ‘Actual Values Range Qvaiies
[Welding Process GTAW cTAW
lvpe (Manual, Semi Automatic) MANUAL MANUAL
Pine Diameter Zieh ‘UNLIMITED
lease meta Number to P-Number PRO STOP No.8 Po. 6t0PNo-8
Filer Metal or Electrode Specifications (SFA) ASS
rite Metal or Electrode Classifiations ER308 ER 308
Filer Metal Ftumbers 6 é
[Consumable Insert (GTAW or PAW) "ARGON "ARGON
Deposit Thickness for Each Process
Process 1: GTAW 277mm SSA mm
Process 2: SMAW WA NA
postions 6 6
|vertica Progression (Uphill or Downhill) UP PHL
Use of sacking Gas (GTAW, PAW, GMAW) WA WA
RESuTS
[non Destructive Test (NOT)?
[Msual Examination of Compl. Weld: ACCEPTED
Jpenetrant Test {ACCEPTED
|penetran Test Report No, Pr/003
Joestructive Test
[reansverse Face a
longitudinal Bends
side Bends
rite Weld Fracture Test,
IMacro Examination
We Certify That the Statements in This Record are Correct and That the Test Coupons Were Prepared, Welded, and Tested in Accordance
‘With the Requrements of Section IX ofthe ASME Boller and Pressure Vessel Code.
Prepared by
Reviewed by ‘Approved by
Name: CERI Tavyan; [rane
sen ( sen
\
Ein =ie: pate
ser
pateDocument No :FM-223
Revision 0
Revised On 26 Apr 2008,
WELDER PERFORMANCE QUALIFICATION TEST (WPQTT)
{JOTUN NEW WATER BASED FACTORY PROJECT
Record No, : WPQT/013
Date of Test :1.Des 23,
[Company Name: {PT Tayo Sina Raya Tek [Welder entiation No-
[WPS no. TGEME/WPS/ASWE Sec. B/R/R/O0I_| Speciation of base Metal" ASIZTPSI6L
[welder Name IMAM MUTT [rianess Ziimm
‘Testing Variable and Qualification Limit
Welding Variables ‘Actual Values Range Qualified
[Welding Process TAW GrAW
[pe (Manual, Sern Automatic) MANUAL MANUAL
Pine Diameter I2inch ‘UNLIMITED
lnase Meta P.Number to P-Number PNo. BtoP No.8 Po. 8toP Noe
rier metal or Electrode Specification (SFA) ASS ASS
Filer Metal o Eletrode Clasications ER 308 R308
Filer Metal Numbers 6 6
[consumable inser (GTAW or PAW) "ARGON “ARGON
epost Thickness for Each Process
Process 1 :GTAW 211mm 422mm
Process 2: SMAW NA WA
Positions 6 6
|vertical Progression (Uphill or Downhil) UP UPHILL
Use of Backing Gas (GTAW, PAW, GMAW) WA WA
[curcent Type and Polarity (A, DCEP, OCEN) Desr csr
RESULTS
Non Destracve Test (NOT)
[visual examination of Compl. Weld: ACCEPTED
Penetrant Test ACCEPTED
Penetrant Test Report No, Pr/003
Destructive Test
[Transverse Face and Root Bends: NIA
Longitudinal Bends NA
side bends NA
Fier Weld Fracture Tet :NA
Macro Examination ENA
We Ceriy That the Statements in This Record are Correct and That the Test Coupons Were Prepared, Welded, and Tested in Accordance
‘With the Requrements of Section X ofthe ASME Boller and Pressure Vessel Code.
Prepared Reviewed by ‘Aoproved by
Name: OER TAvYADI [Name [Name
[sien ( sien sien
loste a ory, oe oseDocimert No FFB
fevson 03
RevsedOn $26 Ap. 2008
ap WELDER PERFORMANCE QUALIFICATION TeST (wear) | Record No. : WPQT/o15
as JOTUN NEW WATER BASED FACTORY PROJECT Date of Test :1 Des 23
[conpanvnane Tay Sar aya Takk [Welder dercaton No“ W007
Ps no. MET WIPSTRSME Se TATRTOO [Speco of ane Meta =A RTP SOAL
Welder Name TRIPURNOMO Finer Tm
“esting Variable and Qualification tit
Welding Variables Actual Values Range ated
eine roc craw aw
Hv (Mans Sem tomate MANUAL MANUAL
ve ameter Teh UNUMITED
Mata P-umber to Number 7 rettorhos Pro stornos |
iter Meta or ectrode Speciation (SFA) AS9
rite Meta or EectrodeCaseetons R308
iter Meta mbes 6 é
consumable ser (GTAW or PAW) ARGON TRGON
epost kes for Ech Process
process 3: AW 277mm Ss4mm
JProcess2:sMAW Na
rotons 6
era Progression Up er Down) Tr
seo aking Gas (TAW, PAW, GMAW) WA
curen Type ane Potty (AC, OCE, OCEN) Dos
Reus
Non Destructive Test (NOT) =
Visual Examination of Compl Weld: ACCEPTED
Penetrant Test = ROCEPTED
lPenetrant Test Report No. =PT/003
Destructive Test
[Transverse Face and Root Bends: N/A
Longitudinal Bends :W/A
[side Bends N/A
ret Weld Fracture Tet :NA
Macro Examination Nia
‘We Certify That the Statements in This Record are Correct and That the Test Coupons Were Prepared, Welded, and Tested in Accordance
‘With the Requrements of Section IXof the ASME Boller and Pressure Vessel Code.
Prepared by Reviewed by ‘Approved by
[Name Tanyaor [rane Ei Name‘Document No: FM-223
Revision 1
Revised On 25 Apr. 2008
ap
WELDER PERFORMANCE QUALIFICATION TEST (WPQT)
Record No. : WPQT/016
ee JOTUN NEW WATER BASED FACTORY PROJECT Date of Test :1 Des 23
[company name Taiyo Snar Raya Teknik [Welder entiation No. WOOT
[wes no. GEME/WPS[ASME Sec. W/8/R/001 [specication of Sase etal =ASI2TPSI6L
[Weider Name TTRIPURNOMO [Thiness 2mm
‘Testing Variable and Qualification Limit
‘Welding Variables ‘Actual Values Range Qualified
[Welding Process GTA GTAW
[Type (Manual, Semi Automatic) ‘MANUAL MANUAL
Pipe Diameter Tech UUNUMATED
ase Metal Number to P.Number Po. 8t0PNo-8 Po. 610 PNo-8
Fer Metal or Electrode Specifications (SFA) ASS) Aso
Fier metal o Electrode Casificatons R308 ER308
iter metal F-Numbers 6 6
[consumable insert (GTAW or PAW) "ARGON ARGON
Deposit Thickness for Each Process
Process 1: GTAW 422mm
Process 2: sMAW NA
positons ry
|vertical Progression (Uphill or Downhil) PHIL
Use of tacking Gas (GTAW, PAW, GMAW) NA
current Type and Polarity (AC, DCEP, DCEN) bcs?
RESUS
Non Destractve Test (NOT):
[visual examination of Compl. Weld: ACCEPTED
Penetant Test ACCEPTED
Penetrant Test Report No. Pr/003
Destructive Test
[Transverse Face and Root Bends: NIA
Longitudinal Bends NIA
side tends Nia
Fier Weld Fracture Tet NA
IMacra Examination Nia
We Certify That the Statements in This Record are Correct and That the Test Coupons Were Prepared, Welded, and Tested In Accordance
[With the Requrements of Section IX ofthe ASME Boller and Pressure Vessel Code.
Prepared by Reviewed by ‘Approved by
Name OED ‘oor (ame Name
[sen sien sien
bate “1-12 200 Joate loate‘Document No: FRET
fRevsion 01
LIQUID PENETRANT TEST REPORT | fevisedon +13 pr. 2012
avo sna
Pret name Jotun New Water ase Fcton Poet, De Orngecion a Deenber2023
Prec ade procs No cc
Report No Pron rope Code ASME VA
Prepared Ege tore Hyer Ten
ape arr [ater Resa
aT Ps Woae pecans
tached LJoter
[Famer v Fexrescr Sear
[rarer mera [soe Ra Wa Ere
peo Materal ——TETFSAU a 60 6G) [omer
[emer Trai SPOTS
— agra SPOTCHECK SHLSP2 lene ‘ambient
loevaoee Mara SPOTCHE CK KO lowtrnet 5 amt
a Toate IV JB Dever
| ]Aaueous Developer |Owell Time dev 10° Mt
[_|Non Aqueous Developer
FST TERT
weer Tea
no. | orem | see “pee Oxctnaty feats
7 [wares [em | won c= Tope
2] arene an | wa co nO DERE
3 [wears [soem [ a Sa a Vau
[evar [ie ne Perera re veal
i Ts Raa OR — FF Ba
favo Cheha eons
Dep Tyanvao.
om oa
= Ay - 2024