Project: ETAP Page: 1

Location: 20.0.0C Date: 04-10-2024


Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: ARGOS_RD Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard


3-Phase, LG, LL, & LLG Fault Currents

Swing V-Control Load Total


Number of Buses: 1 0 6 7

Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 2 0 0 4 0 0 6

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 1 0 0 0 1

System Frequency: 60.00

Unit System: English

Project Filename: ARGOS_RD

Output Filename: C:\ETAP 2000\ARGOS_RD\Untitled.SI2S


Project: ETAP Page: 2
Location: 20.0.0C Date: 04-10-2024
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: ARGOS_RD Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent
Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable / Busway Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C
Transmission Line Resistance: Yes Individual

Cable / Busway Resistance: Yes Individual


Project: ETAP Page: 3
Location: 20.0.0C Date: 04-10-2024
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: ARGOS_RD Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.
Barra 69KV SWNG 69.000 69.000 1 100.00 0.00
Barraje _+F1 Load 0.480 0.477 1 100.00 -120.00
Prim trafo 5,6mva Load 69.000 69.000 1 100.00 0.00
Punto Conexión Load 0.480 0.477 1 100.00 -120.00
Sec trafo 5,6mva Load 4.400 4.400 1 100.00 -150.00
Trafo_Prim Load 4.400 4.400 1 100.00 -150.00
Trafo_Sec Load 0.480 0.477 1 100.00 -120.00

7 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: ETAP Page: 4
Location: 20.0.0C Date: 04-10-2024
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: ARGOS_RD Config.: Normal

Line/Cable/Busway Input Data

ohms or siemens per 1000 ft per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length
ID Library Size Adj. (ft) % Tol. #/Phase T ( C) R1 X1 Y1 R0 X0 Y0
Alim1_Premolienda 0,6MCUN3 500 196.9 0.0 8 75 0.0294000 0.0348960 0.0926100 0.0858600
Alim2_Premolienda 0,6MCUN3 500 656.2 0.0 4 75 0.0294000 0.0348960 0.0926100 0.0858600
Alim_prim_Trafo_MT 0,6MALN3 4/0 213.3 0.0 1 75 0.1049600 0.0381000 0.3306240 0.0937320
Linea trans_argos 559 24606.3 0.0 1 75 0.0432576 0.1893939

Line / Cable / Busway resistances are listed at the specified temperatures.


Project: ETAP Page: 5
Location: 20.0.0C Date: 04-10-2024
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: ARGOS_RD Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 5.600 69.000 4.400 7.15 8.50 0 0 0 0 0 7.15 Dyn 150.00


trafo proyectado 2.000 4.160 0.480 6.34 6.00 0 0 0 0 -6.000 6.34 Dyn -30.00

2-Winding Transformer Grounding Input Data

Grounding
Transformer Rating Conn. Primary Secondary
ID MVA Prim. kV Sec. kV Type Type kV Amp ohm Type kV Amp ohm
T1 5.600 69.000 4.400 D/Y Solid
trafo proyectado 2.000 4.160 0.480 D/Y Solid
Project: ETAP Page: 6
Location: 20.0.0C Date: 04-10-2024
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: ARGOS_RD Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y
T1 2W XFMR Prim trafo 5,6mva Sec trafo 5,6mva 14.95 127.10 127.97
trafo proyectado 2W XFMR Trafo_Prim Trafo_Sec 44.79 268.72 272.43
Alim1_Premolienda Cable Trafo_Sec Punto Conexión 31.76 37.70 49.30
Alim2_Premolienda Cable Punto Conexión Barraje _+F1 211.76 251.35 328.66
Alim_prim_Trafo_MT Cable Sec trafo 5,6mva Trafo_Prim 11.56 4.20 12.30
Linea trans_argos Line Barra 69KV Prim trafo 5,6mva 2.24 2.24
Project: ETAP Page: 7
Location: 20.0.0C Date: 04-10-2024
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: ARGOS_RD Config.: Normal

Power Grid Input Data

% Impedance
Rating 100 MVA Base
Grounding
Power Grid ID Connected Bus ID MVASC kV R X" R/X" Type
RED ARGOS DOMINICANA Barra 69KV 350.000 69.000 13.87551 24.97592 0.56 Wye - Solid

Total Connected Power Grids ( = 1 ): 350.000 MVA


Project: ETAP Page: 8
Location: 20.0.0C Date: 04-10-2024
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: ARGOS_RD Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: Barraje _+F1


Nominal kV = 0.480
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Barraje _+F1 Total 0.00 16.176 0.00 107.03 122.97 13.549 13.549 3.32E+002 7.17E+002 8.12E+002 9.80E+002

Punto Conexión Barraje _+F1 43.69 16.176 58.05 101.19 106.07 13.549 13.549 3.32E+002 7.17E+002 8.12E+002 9.80E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.176 13.549 14.009 16.166
Peak Current (kA), Method C : 28.910 24.216 25.037 28.893
Breaking Current (kA, rms, symm) : 13.549 14.009 16.166
Steady State Current (kA, rms) : 16.176 13.549 14.009 16.166

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer.
Project: ETAP Page: 9
Location: 20.0.0C Date: 04-10-2024
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: ARGOS_RD Config.: Normal

Fault at bus: Punto Conexión


Nominal kV = 0.480
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Punto Conexión Total 0.00 26.587 0.00 97.92 105.30 28.428 28.428 1.21E+002 4.65E+002 1.45E+002 3.61E+002

Trafo_Sec Punto Conexión 10.77 26.587 18.27 98.98 99.44 28.428 28.428 1.21E+002 4.65E+002 1.45E+002 3.61E+002
Barraje _+F1 Punto Conexión 0.00 0.000 0.00 97.92 105.30 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 26.587 28.428 23.025 28.599
Peak Current (kA), Method C : 55.284 59.113 47.878 59.469
Breaking Current (kA, rms, symm) : 28.428 23.025 28.599
Steady State Current (kA, rms) : 26.587 28.428 23.025 28.599

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer.
Project: ETAP Page: 10
Location: 20.0.0C Date: 04-10-2024
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: ARGOS_RD Config.: Normal

Fault at bus: Trafo_Prim


Nominal kV = 4.400
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Trafo_Prim Total 0.00 8.761 0.00 105.25 110.67 9.100 9.100 4.40E+001 1.59E+002 5.14E+001 1.37E+002

Sec trafo 5,6mva Trafo_Prim 8.21 8.761 14.43 108.35 104.77 9.100 9.100 4.40E+001 1.59E+002 5.14E+001 1.37E+002
Trafo_Sec Trafo_Prim 0.00 0.000 60.42 109.37 63.53 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.761 9.100 7.587 9.162
Peak Current (kA), Method C : 17.923 18.617 15.522 18.744
Breaking Current (kA, rms, symm) : 9.100 7.587 9.162
Steady State Current (kA, rms) : 8.761 9.100 7.587 9.162

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer.
Project: ETAP Page: 11
Location: 20.0.0C Date: 04-10-2024
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: ARGOS_RD Config.: Normal

Fault at bus: Trafo_Sec


Nominal kV = 0.480
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Trafo_Sec Total 0.00 29.263 0.00 99.39 97.29 33.461 33.461 8.88E+001 4.27E+002 4.48E+001 2.69E+002

Punto Conexión Trafo_Sec 0.00 0.000 0.00 99.39 97.29 0.000 0.000
Trafo_Prim Trafo_Sec 65.90 29.263 82.69 85.18 105.61 33.461 33.461 * 8.88E+001 4.27E+002 4.48E+001 2.69E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 29.263 33.461 25.342 32.334
Peak Current (kA), Method C : 63.959 73.136 55.390 70.671
Breaking Current (kA, rms, symm) : 33.461 25.342 32.334
Steady State Current (kA, rms) : 29.263 33.461 25.342 32.334

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer.
Project: ETAP Page: 12
Location: 20.0.0C Date: 04-10-2024
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: ARGOS_RD Config.: Normal

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik
Barraje _+F1 0.480 16.176 28.910 16.176 13.549 24.216 13.549 13.549 14.009 25.037 14.009 14.009 16.166 28.893 16.166 16.166
Punto Conexión 0.480 26.587 55.284 26.587 28.428 59.113 28.428 28.428 23.025 47.878 23.025 23.025 28.599 59.469 28.599 28.599
Trafo_Prim 4.400 8.761 17.923 8.761 9.100 18.617 9.100 9.100 7.587 15.522 7.587 7.587 9.162 18.744 9.162 9.162
Trafo_Sec 0.480 29.263 63.959 29.263 33.461 73.136 33.461 33.461 25.342 55.390 25.342 25.342 32.334 70.671 32.334 32.334

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: ETAP Page: 13
Location: 20.0.0C Date: 04-10-2024
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: ARGOS_RD Config.: Normal

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Barraje _+F1 0.480 0.00757 0.01632 0.01799 0.00757 0.01632 0.01799 0.01849 0.02232 0.02898 0.00000 0.00000 0.00000
Punto Conexión 0.480 0.00275 0.01059 0.01094 0.00275 0.01059 0.01094 0.00330 0.00823 0.00887 0.00000 0.00000 0.00000
Trafo_Prim 4.400 0.08521 0.30737 0.31896 0.08521 0.30737 0.31896 0.09945 0.26605 0.28403 0.00000 0.00000 0.00000
Trafo_Sec 0.480 0.00202 0.00974 0.00994 0.00202 0.00974 0.00994 0.00102 0.00612 0.00620 0.00000 0.00000 0.00000