Short-Circuit Analysis
Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 2 0 0 4 0 0 6
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Transformer Impedance: Yes Individual
Apply Individual
Temperature Correction Adjustments /Global Degree C
Transmission Line Resistance: Yes Individual
7 Buses Total
ohms or siemens per 1000 ft per Conductor (Cable) or per Phase (Line/Busway)
Line/Cable/Busway Length
ID Library Size Adj. (ft) % Tol. #/Phase T ( C) R1 X1 Y1 R0 X0 Y0
Alim1_Premolienda 0,6MCUN3 500 196.9 0.0 8 75 0.0294000 0.0348960 0.0926100 0.0858600
Alim2_Premolienda 0,6MCUN3 500 656.2 0.0 4 75 0.0294000 0.0348960 0.0926100 0.0858600
Alim_prim_Trafo_MT 0,6MALN3 4/0 213.3 0.0 1 75 0.1049600 0.0381000 0.3306240 0.0937320
Linea trans_argos 559 24606.3 0.0 1 75 0.0432576 0.1893939
Grounding
Transformer Rating Conn. Primary Secondary
ID MVA Prim. kV Sec. kV Type Type kV Amp ohm Type kV Amp ohm
T1 5.600 69.000 4.400 D/Y Solid
trafo proyectado 2.000 4.160 0.480 D/Y Solid
Project: ETAP Page: 6
Location: 20.0.0C Date: 04-10-2024
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: ARGOS_RD Config.: Normal
Branch Connections
% Impedance
Rating 100 MVA Base
Grounding
Power Grid ID Connected Bus ID MVASC kV R X" R/X" Type
RED ARGOS DOMINICANA Barra 69KV 350.000 69.000 13.87551 24.97592 0.56 Wye - Solid
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Barraje _+F1 Total 0.00 16.176 0.00 107.03 122.97 13.549 13.549 3.32E+002 7.17E+002 8.12E+002 9.80E+002
Punto Conexión Barraje _+F1 43.69 16.176 58.05 101.19 106.07 13.549 13.549 3.32E+002 7.17E+002 8.12E+002 9.80E+002
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Punto Conexión Total 0.00 26.587 0.00 97.92 105.30 28.428 28.428 1.21E+002 4.65E+002 1.45E+002 3.61E+002
Trafo_Sec Punto Conexión 10.77 26.587 18.27 98.98 99.44 28.428 28.428 1.21E+002 4.65E+002 1.45E+002 3.61E+002
Barraje _+F1 Punto Conexión 0.00 0.000 0.00 97.92 105.30 0.000 0.000
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Trafo_Prim Total 0.00 8.761 0.00 105.25 110.67 9.100 9.100 4.40E+001 1.59E+002 5.14E+001 1.37E+002
Sec trafo 5,6mva Trafo_Prim 8.21 8.761 14.43 108.35 104.77 9.100 9.100 4.40E+001 1.59E+002 5.14E+001 1.37E+002
Trafo_Sec Trafo_Prim 0.00 0.000 60.42 109.37 63.53 0.000 0.000
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Trafo_Sec Total 0.00 29.263 0.00 99.39 97.29 33.461 33.461 8.88E+001 4.27E+002 4.48E+001 2.69E+002
Punto Conexión Trafo_Sec 0.00 0.000 0.00 99.39 97.29 0.000 0.000
Trafo_Prim Trafo_Sec 65.90 29.263 82.69 85.18 105.61 33.461 33.461 * 8.88E+001 4.27E+002 4.48E+001 2.69E+002
All fault currents are in rms kA. Current ip is calculated using Method C.
* LLG fault current is the larger of the two faulted line currents.
Project: ETAP Page: 13
Location: 20.0.0C Date: 04-10-2024
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: ARGOS_RD Config.: Normal
Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Barraje _+F1 0.480 0.00757 0.01632 0.01799 0.00757 0.01632 0.01799 0.01849 0.02232 0.02898 0.00000 0.00000 0.00000
Punto Conexión 0.480 0.00275 0.01059 0.01094 0.00275 0.01059 0.01094 0.00330 0.00823 0.00887 0.00000 0.00000 0.00000
Trafo_Prim 4.400 0.08521 0.30737 0.31896 0.08521 0.30737 0.31896 0.09945 0.26605 0.28403 0.00000 0.00000 0.00000
Trafo_Sec 0.480 0.00202 0.00974 0.00994 0.00202 0.00974 0.00994 0.00102 0.00612 0.00620 0.00000 0.00000 0.00000