Job

JSA # Description Revision Revision Date Task Description

JSA014263M P&A RLU XXX Rig up Rig up extended decks on the


extended decks on the crane crane beam.
beam.
Job Safety Analysis
Required PPE Required Tools

- Coverall - Torque wrench


- Impact gloves - Clamps
- Hard hats - Lin adapters
- Safety shoes
- Safety glasses
- Safety Harness and Lanyard
In Case of Eme
Required Equipment Required Procedures Company
Responder:

- Extension deck tool box - Rig up extension deck procedure. - WSR


- Extension deck with valid lifting
certificate
In Case of Emergency Contact the Following
Company Contractor Contractor Emergency Emergency
Ph#: Responder: Ph#: Responder: Responder
Ph#:

- Superintendent - HSE Manager


- Operation
manager
Discussion & Document
Discuss and document potential scenarios and
conditions that will trigger Stop Work Authority

- Not follow the procedure.


- Use non-certified lifting equipment / tools.
- Poor conditions of lifting slings.
- Inappropriate PPE used.
- Not follow Tenet of operation.
scussion & Document
Discuss and document performance influencing factors Step
that could potentially impact the safe completion of the #
task

- Not follow the procedure (e.g. not properly set up the crane 1
beam, not properly install and torque the clamps and Lin
adpater, not follow calculated load distribution as per
equipment layout).
- Inappropriate PPE used.
- Bad weather.

2
Job Safety Task
Task Steps Hazard # Hazard (Other)
(Listed in Sequential Order)

Prior work execution. Other (Specify) General

Rig up extended deck on the crane beam. Gravity (Falls) N/A

EMAS RLU Critical Task List :

Activity # 1 : Install lindapter with proper torque


value on Extended Deck clamp on TC crane
beam.
Motion N/A

Other (Specify) Communication

Sound N/A
Job Safety Task Steps (Listed in Sequential Order)
Hazard Information
(Complete the following for each task step)

- Unsafe working area (e.g. Insufficient working


space, obstructed objects, insufficient lighting,
Harzadous zone).
- Personnel (e.g health condition not being ready
to work, improper PPE being used).
- Improper equipment conditions.

- Dropped objects.
- Working at height.
- Excessive weight on the canteliver area (e.g.
improper load arrangement sequence and load
distribution).
- Slips, Trips and falls around working area.
- Pinch Points.
- Equipment damaged.
- Muscle strain / back pain injury.
- Line of fire.

- Miscommunication.
- Radios lost signal.

- Explosure to loud noise from using air gun.


ted in Sequential Order)
Controls / Mitigations Person
Responsible
for Control
Implementation

- Review JSAs, excercise Stop Work Responsibility and perform Hazard HSE officer
hunt prior to start the job.
- Review if the tasks are related to the critical task lists.
- Any tasks diviated from the plan , SWA has to be conducted.
- PPE must be worn at all time particuarly the impact gloves.
- Prepare certified and functioning equipment prior execution.
- Confirm that there is no hydrocarbon / Mecury and ensure that gas
detection system is in place and functioning.
- If the hazardous gas / Mecury is shown, the safeguards such as the
crew's competency for hazmat traning needs to be in place.
- Ensure that the crane has been inspected prior to start of any shift.
- Check the weather condition prior to perform any task.

- Perform JSAs, V&V, crane checklist, lifting plan (including drop zone Task supervisor
diagram) and SWC for lifting & rigging and drop inspection prior to work.
- Review lifting plan, load chart and position the crane to have the highest
possible lifting capacity.
- Inspect working at height rescue equipment and ensure that the
equipment is ready to be used in case of emergency.
- Conduct SWC for working at height prior to work.
- Review the rescue plan and get documented on the location.
- Barricade working and lifting area.
- Inspect all handtools and lifting equipment before use.
- Use certifiled and correct lifting device with identification of SWL.
- Inspect and eliminate any loosen parts on lifting equipment/ loads.
- Beware of overhead loads, don’t stand under loads.
- Hands off load use adequate No's of taglines and push-pull sticks.
- Require scaffolding if the torquing area is extended out of the platform.
- Ensure that the scaffolds are certified and in date.
- Use a safety harness and tie with an appropriate securing point.
- Secure handtools with landyard.
- Use 2 person to lift and secure the clamps due to their weight.
- Spot equipment within the crane loading area prior to spot on the
canteliver area to avoid excessive weight.
- A crane operator needs to monitor the weight capacity on crane load cell
display particularly when performing heavy lift.
- Keep walkway and area along lifting path clear. Task supervisor
- Prepare loading area on platform.
- Remove any objects causing trip hazar and highlight any trip hazards that
cannot be removed.
- No hands on loads.
- Use 4 taglines and push/pull tool to control the direction.
- Watch your step.
- Look for potential pinch points and highlight them.
- Discuss and identify line of fire.
- Stay on proper position and ensure proper technique of body positioning
(e.g. applying torque).
- Ensure all doors and access ways are secured.
- Ensure that the proper torque has been applied with torque mark.
- Applying torque requires to have 2 person (e.g. torquing clamps).
-Weekly inspection of clamps MUST BE carried out to ensure the torque of
Hex Bolt and Hex Nut on each Clamp is still within the range.
- Gradually release sling tension before taken off.
- Slings must be aligned prior to lifting.

- Use radio with three ways communication. Task supervisor


- Check radios communication.
- Specify tasks in order.
- Confirm everybody understands the tasks.
- A banksman stays at the visible location for crane operator.
- A banksman gives orders in clear and correct signals to crane operator.
- Only banksman gives the signals except for any emergency cases.
- Clarify lifting direction to the crane oprator and captain.
- Prepare back up radios and batteries.
- Ensure a good commucation especially when the crane operaor cannot
cleary see the banksman's signal. If the communication lost, the crane
operatior has to stop the lifting operation until the communication resumes.

- Use ear plugs or hearing protection device especially when tightening / Task supervisor
untightening nuts.
Person Critical
Responsible Step
for Control
Verification

WSR Y

WSR Y
WSR Y

WSR Y

WSR Y
Potential Keyword Risk Ranking Critical
Biological L Y
Chemical M N
Electrical H
Gravity (Falls)
Mechanical
Motion
Pressure
Radiation
Sound
Temperature
Other (Specify)