CM-Cálculos y Verificaciones

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

Pu total= 37.

02 ton

P= 18.51 ton
σ= 40 ton/m2 4kgf/cm2
Azap= 0.51416667 m2

L= 10.4 m
B= 0.05 m

P= 3.085 ton
σ= 40 ton/m2 4kgf/cm2
AzapEsq= 0.08569444 m2
L 0.29273613 m

AzpCentro= 0.17138889 m2
L 0.41399141 m
Cimiento corrido CU1 CU2 CU3 CU4 CU5
Mx (t-m) -0.68
My
V

Zapatas
Mx 0.85
My 1.6
V

1 capa 2 capas

h= 60 cm h= 60
dv= 5/8 in dv= 5/8
dv= 1.59 cm dv= 1.59
Av 1.98 cm2 Av 1.98

sepmáx= 18.3178024 cm sepmáx= 27.4767036


sep real 17.5 cm sep real 25

a 1.99494722 cm a 1.39646305
Mr 381399.934 kgf-cm/sep Mr 383637.684
Mr 21794.282 kgf-cm/cm Mr 15345.5074
Mr 21.79 ton-m/m Mr 15.35
cm
in
cm
cm2

cm
cm

cm
kgf-cm/sep
kgf-cm/cm
ton-m/m
h 60 cm
d 52 cm
fc 280 kgf/cm

Vr1/b 391.991956 kgf/cm

Vr2/b 783.983911 kgf/cm


Vr2/b 783.983911 kgf/cm