Professional Documents
Culture Documents
Haranggaol 230531
Haranggaol 230531
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
a l
Jalan Asp
ARCHITECT
CIVIL/STRUCTURAL ENGINEER
PARKIR BUS
GARIS
A B C
BRONJONG Jal
an
As
pa
DECK
PARKIR MOBIL
l LANDSCAPE CONSULTANT
PEDESTRIAN
88
QUANTITY SURVEYOR
5.
00
880.000
0
PEDESTRIAAN
CONSTRUCTION MANAGEMENT
JALAN
PARKIR MOTOR
RUANG SATPAM R.GANTI PRIA R.GANTI WANITA
NOTE
88
0.0
17
16
18 19 20 21 22 23 24 25 26 27 28 29
00
TOILET WANITA 15 HOUSE KEEPING
UP SELASAR
14 13 12 11 10 9 8 7 6 5 4 3 2 1
FRONT OFFICE
D RAMP
ROOM BOY CORRIDOR
D
ROOM BOY
CORRIDOR
880.00
UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR
0
UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR
KITCHEN
UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR
TRAVEL PARIWISATA DANAU TOBA TERAS
PARKIR
TERAS
R. SATPAM
RAMP LOBBY
87
TOKO UKIRAN
5
TERAS
.0
00
BUSINESS CENTER
. 000 0 00
AREA COFFEE SHOP
KIDS POOL
87 5 R. FITNESS
KAMAR MANDI KAMAR MANDI KAMAR MANDI
5.
87
OPEN AREA
875
POOL BAR
POOL
0
DECK BAWAH
Bronjong
Bronjong
Bronjong 1. THIS DRAWING AND DESIGN IS THE COPYRIGHT OF THE DESIGNER. NO PORTION
MAY BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE DESIGNER.
Bronjong 2. ALL DIMENSIONS TO BE VERIFIED ON SITE BY THE CONTRACTORS.
ANY DISCREPANCIES TO BE REPORTED TO THE DESIGNERS IMMEDIATELY.
Bronjong 3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE DESIGNERS
SPECIFICATION AND CONDITION OF CONTRACT.
4. DRAWING NOT SHOWING THE LATEST REVISION ARE TO BE CANCELED.
5. ALL INFORMATION ON THE DRAWING RELATING TO EXISTING BOUNDARIES AND
LEVELS ARE AS PROVIDED BY THE OWNER.
THE DESIGNER WILL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES OR ERRORS
DUE TO INCORRECT INFORMATION CONTAINED THERE IN.
DISCIPLINE
PHASE
PRA RENCANA
DRAWING TYPE
APPROVED
-
A CHECK BY DRAWN BY
B C Eds
REVISION BY
Eds
PRINT BY
Eds
DATE DRAWING NO. SHEET NO.
AR-01-01
PROJECT
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
CIVIL/STRUCTURAL ENGINEER
A B C
LANDSCAPE CONSULTANT
QUANTITY SURVEYOR
CONSTRUCTION MANAGEMENT
NOTE
17 18 19 20 21 22 23 24 25 26 27 28 29
DW DAK BETON
BACK STAGE 16
TOILET WANITA TOILET PRIA
15
UP
14 13 12 11 10 9 8 7 5 4 3 2 1
JANITOR
CORRIDOR
D D
FUNCTION ROOM
CORRIDOR
BALKON
CORRIDOR
UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR
UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR
UNIT KAMAR
TERAS
UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR
TERAS
BUSINESS CENTER
PHASE
PRA RENCANA
DRAWING TYPE
APPROVED
-
A CHECK BY DRAWN BY
B C Eds
REVISION BY
Eds
PRINT BY
Eds
DATE DRAWING NO. SHEET NO.
AR-01-02
PROJECT
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
CIVIL/STRUCTURAL ENGINEER
A B C
LANDSCAPE CONSULTANT
QUANTITY SURVEYOR
CONSTRUCTION MANAGEMENT
NOTE
D D
PHASE
PRA RENCANA
DRAWING TYPE
APPROVED
-
A CHECK BY DRAWN BY
B C Eds
REVISION BY
Eds
PRINT BY
Eds
DATE DRAWING NO. SHEET NO.
AR-01-03
PROJECT
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
CIVIL/STRUCTURAL ENGINEER
LANTAI ATAP
LANTAI ATAP
LANTAI 2
QUANTITY SURVEYOR
LANTAI 1 LANTAI 1
CONSTRUCTION MANAGEMENT
LANTAI ATAP
LANTAI 2
LANTAI ATAP
LANTAI ATAP
LANTAI 1 LANTAI 1
DRAWING NAME SCALE
TAMPAK 1 : 300
APPROVED
-
CHECK BY DRAWN BY
Eds Eds
REVISION BY PRINT BY
Eds
DATE DRAWING NO. SHEET NO.
AR-01-04
PROJECT
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
17 18 19 20 21 22 23 24 25 26 27 28 29
16 CIVIL/STRUCTURAL ENGINEER
GM
LANDSCAPE CONSULTANT
TOILET PRIA RAMP
RAMP
RECEPTIONIST
QUANTITY SURVEYOR
CONSTRUCTION MANAGEMENT
RAMP
NOTE
RAMP
KITCHEN
R. SATPAM
RAMP LOBBY
TOKO UKIRAN
PHASE
PRA RENCANA
DRAWING TYPE
DECK BAWAH
DRAWING NAME SCALE
APPROVED
-
CHECK BY DRAWN BY
Eds Eds
DENAH LANTAI 1 (Z1) REVISION BY PRINT BY
Eds
DATE DRAWING NO. SHEET NO.
AR-Z1-01
PROJECT
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
CIVIL/STRUCTURAL ENGINEER
LANDSCAPE CONSULTANT
CONSTRUCTION MANAGEMENT
ROOM BOY
NOTE
UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR
TERAS
PHASE
PRA RENCANA
DRAWING TYPE
DECK BAWAH
APPROVED
-
CHECK BY DRAWN BY
Eds Eds
DENAH LANTAI 1 (Z2) REVISION BY PRINT BY
Eds
DATE DRAWING NO. SHEET NO.
AR-Z2-01
PROJECT
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
CIVIL/STRUCTURAL ENGINEER
ROOM BOY
LANDSCAPE CONSULTANT
QUANTITY SURVEYOR
CORRIDOR
CONSTRUCTION MANAGEMENT
NOTE
UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR
TERAS
KIDS POOL
POOL BAR
POOL
PHASE
PRA RENCANA
DRAWING TYPE
APPROVED
-
CHECK BY DRAWN BY
Eds Eds
DENAH LANTAI 1 (Z3) REVISION BY PRINT BY
Eds
DATE DRAWING NO. SHEET NO.
AR-Z3-01
PROJECT
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
CIVIL/STRUCTURAL ENGINEER
CORRIDOR
UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR
LANDSCAPE CONSULTANT
QUANTITY SURVEYOR
CONSTRUCTION MANAGEMENT
TERAS
NOTE
DECK BAWAH
PHASE
PRA RENCANA
DRAWING TYPE
APPROVED
-
CHECK BY DRAWN BY
Eds Eds
DENAH LANTAI 1 (Z4) REVISION BY PRINT BY
Eds
DATE DRAWING NO. SHEET NO.
AR-Z4-01
PROJECT
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
17 18 19 20 21 22 23 24 25 26 27 28 29
DW
16 CIVIL/STRUCTURAL ENGINEER
BACK STAGE
TOILET WANITA TOILET PRIA
15
UP
14 13 12 11 10 9 8 7 5 4 3 2 1
JANITOR
DAK BETON
LANDSCAPE CONSULTANT
QUANTITY SURVEYOR
FUNCTION ROOM
CONSTRUCTION MANAGEMENT
NOTE
BALKON
FUNCTION ROOM
PHASE
PRA RENCANA
DRAWING TYPE
APPROVED
-
CHECK BY DRAWN BY
Eds Eds
REVISION BY PRINT BY
DENAH LANTAI 2 (Z1) Eds
DATE DRAWING NO. SHEET NO.
AR-Z1-02
PROJECT
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
CIVIL/STRUCTURAL ENGINEER
LANDSCAPE CONSULTANT
CONSTRUCTION MANAGEMENT
ROOM BOY
NOTE
UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR
TERAS
PHASE
PRA RENCANA
DRAWING TYPE
APPROVED
-
CHECK BY DRAWN BY
Eds Eds
REVISION BY PRINT BY
DENAH LANTAI 2 (Z2) Eds
DATE DRAWING NO. SHEET NO.
AR-Z2-02
PROJECT
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
CIVIL/STRUCTURAL ENGINEER
ROOM BOY
LANDSCAPE CONSULTANT
QUANTITY SURVEYOR
CORRIDOR
CONSTRUCTION MANAGEMENT
NOTE
UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR
TERAS
PHASE
PRA RENCANA
DRAWING TYPE
APPROVED
-
CHECK BY DRAWN BY
Eds Eds
DENAH LANTAI 2 (Z3) REVISION BY PRINT BY
Eds
DATE DRAWING NO. SHEET NO.
AR-Z3-02
PROJECT
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
CIVIL/STRUCTURAL ENGINEER
CORRIDOR
UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR UNIT KAMAR LANDSCAPE CONSULTANT
QUANTITY SURVEYOR
CONSTRUCTION MANAGEMENT
TERAS
NOTE
PHASE
PRA RENCANA
DRAWING TYPE
APPROVED
-
CHECK BY DRAWN BY
Eds Eds
DENAH LANTAI 2 (Z4) REVISION BY PRINT BY
Eds
DATE DRAWING NO. SHEET NO.
AR-Z4-02
PROJECT
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
CIVIL/STRUCTURAL ENGINEER
LANDSCAPE CONSULTANT
QUANTITY SURVEYOR
CONSTRUCTION MANAGEMENT
NOTE
FUNCTION TOILET
NO. DATE NOTE/REVISIONS INDICATED THUS
LOBBY TOILET
AREA COFFEE SHOP
PHASE
PRA RENCANA
DRAWING TYPE
POTONGAN A- A 1 : 125
-
POTONGAN BANGUNAN UTAMA
APPROVED
-
CHECK BY DRAWN BY
Eds Eds
REVISION BY PRINT BY
Eds
DATE DRAWING NO. SHEET NO.
AR-B1-06
PROJECT
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
CIVIL/STRUCTURAL ENGINEER
LANDSCAPE CONSULTANT
QUANTITY SURVEYOR
CONSTRUCTION MANAGEMENT
NOTE
DROP OFF
PHASE
PRA RENCANA
DRAWING TYPE
POTONGAN A- A 1 : 125
-
POTONGAN BANGUNAN UTAMA
APPROVED
-
CHECK BY DRAWN BY
Eds Eds
REVISION BY PRINT BY
Eds
DATE DRAWING NO. SHEET NO.
AR-B1-06
PROJECT
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
1500
1500
LANDSCAPE CONSULTANT
QUANTITY SURVEYOR
400
600
600
CONSTRUCTION MANAGEMENT
1000
800
800
NOTE
950
950
1100
500
500
1000
7000
7000
1000
2000
300
2000
1000
500
500
NO. DATE NOTE/REVISIONS INDICATED THUS
1350
1500
1500
2000
1. THIS DRAWING AND DESIGN IS THE COPYRIGHT OF THE DESIGNER. NO PORTION
MAY BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE DESIGNER.
2. ALL DIMENSIONS TO BE VERIFIED ON SITE BY THE CONTRACTORS.
ANY DISCREPANCIES TO BE REPORTED TO THE DESIGNERS IMMEDIATELY.
3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE DESIGNERS
SPECIFICATION AND CONDITION OF CONTRACT.
4. DRAWING NOT SHOWING THE LATEST REVISION ARE TO BE CANCELED.
5. ALL INFORMATION ON THE DRAWING RELATING TO EXISTING BOUNDARIES AND
500
500
LEVELS ARE AS PROVIDED BY THE OWNER.
THE DESIGNER WILL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES OR ERRORS
DUE TO INCORRECT INFORMATION CONTAINED THERE IN.
DISCIPLINE
PRA RENCANA
DRAWING TYPE
APPROVED
-
CHECK BY DRAWN BY
Eds
REVISION BY PRINT BY
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
CIVIL/STRUCTURAL ENGINEER
LANDSCAPE CONSULTANT
QUANTITY SURVEYOR
CONSTRUCTION MANAGEMENT
NOTE
PHASE
PRA RENCANA
DRAWING TYPE
APPROVED
-
CHECK BY DRAWN BY
Eds
REVISION BY PRINT BY
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
CIVIL/STRUCTURAL ENGINEER
3500
LANDSCAPE CONSULTANT
1200
QUANTITY SURVEYOR
RAILING
CONSTRUCTION MANAGEMENT
NOTE
575
1500
500 2000 500
850
925
950 800 600
1. THIS DRAWING AND DESIGN IS THE COPYRIGHT OF THE DESIGNER. NO PORTION
MAY BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE DESIGNER.
3500
3500
2. ALL DIMENSIONS TO BE VERIFIED ON SITE BY THE CONTRACTORS.
ANY DISCREPANCIES TO BE REPORTED TO THE DESIGNERS IMMEDIATELY.
3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE DESIGNERS
SPECIFICATION AND CONDITION OF CONTRACT.
4. DRAWING NOT SHOWING THE LATEST REVISION ARE TO BE CANCELED.
1250
5. ALL INFORMATION ON THE DRAWING RELATING TO EXISTING BOUNDARIES AND
LEVELS ARE AS PROVIDED BY THE OWNER.
1750
2000
DISCIPLINE
750
PHASE
250
PRA RENCANA
DRAWING TYPE
1825 4850 4000
10675
DRAWING NAME SCALE
AR-B1-06
PROJECT
TUHULAN RESORT
HARANGGAOL DANAU TOBA
OWNER
ARCHITECT
CIVIL/STRUCTURAL ENGINEER
LANDSCAPE CONSULTANT
QUANTITY SURVEYOR
LANTAI ATAP
CONSTRUCTION MANAGEMENT
NOTE
LANTAI 2
LANTAI 1
DANAU
1' 4'
PHASE
PRA RENCANA
DRAWING TYPE
APPROVED
-
CHECK BY DRAWN BY
Eds Eds
REVISION BY PRINT BY
Eds
DATE DRAWING NO. SHEET NO.
AR-B1-06