Reg No: 4 2 0 1

A.K.T MEMORIAL COLLEGE OF ENGINEERING &TECHNOLOGY


NEELAMANGALAM, KALLAKURICHI-606 202
(Affiliated to Anna University Chennai, Approved by AICTE New Delhi, an ISO 9001::2015 Certified Institution)
B.E, IAT-2, March’21
Eight Semester, (Regulation 2017)
Mechanical Engineering
IE-8693 PRODUCTION PLANNING AND CONTROL

Time: 90 Mins Maximum Marks: 50 marks


Part-A (6x2=12 Marks)
(Answer All the questions)
1. What are therbligs? Give any five therbligs with symbol. (CO2)
2. List various work measurement techniques. (CO2)
3. Define value Engineering. (CO2)
4. Difference between PMTS & Work sampling. (CO3)
5. What is value analysis? (CO3)
6. Mention the various allowance considered during time study. (CO3)

Part-B (2×13=26 Marks)


7. (a) a) Explain the following (CO2)
i. Memo motion study. (03)
ii. Micro motion study. (03)
iii. Cyclegraph. (03)
iv. Chronocyclegraph. (04)
(OR)
(b) Explain the basic procedure and steps involved in method study. (13) (CO2)
8. (a) Explain in details about Value Analysis. (13) (CO3)
(OR)
(b) Explain analysis of process capabilities in a multi-product system. (13) (CO3)

Part-C (1×12=12 Marks)


9. (a) Explain analysis of process capabilities in a multi-product system. (12) (CO3)
(OR)
(b) A product is sold at a rate of 400 pieces a day and is manufactured at a rate of 2000 pieces
a day. The setup costs of the machine are Rs.5000 and the storage costs found to be Rs.0.015
per unit per day. Labour charges are Rs.120, materials Rs.80, and overheads Rs160 per piece.
If the interest charges are 13% find the minimum-cost batch size and the costs of the
production run. Assume 300 working days in a year (12) (CO3)
***ALL THE BEST***

SUBJECT INCHARGE HOD PRINCIPAL


COURSE
DETAILS
OUTCOME

CO2 Describe the functions of work study, Method study & Work measurement
Techniques of various production system.

CO3 Extending the original product information& Value analysis to know Process
planning and routing-Pre requisite information needed for process planning
Reg No: 4 2 0 1
A.K.T MEMORIAL COLLEGE OF ENGINEERING &TECHNOLOGY
NEELAMANGALAM, KALLAKURICHI-606 202
(Affiliated to Anna University Chennai, Approved by AICTE New Delhi, an ISO 9001::2015 Certified Institution)
B.E, IAT-2, March’21
Eight Semester, (Regulation 2017)
Mechanical Engineering
IE-8693 PRODUCTION PLANNING AND CONTROL

Time: 90 Mins Maximum Marks: 50 marks


Part-A (6x2=12 Marks)
(Answer All the questions)
1. What are therbligs? Give any five therbligs with symbol. (CO2)
2. List various work measurement techniques. (CO2)
3. Define value Engineering. (CO2)
4. Difference between PMTS & Work sampling. (CO3)
5. What is value analysis? (CO3)
6. Mention the various allowance considered during time study. (CO3)

Part-B (2×13=26 Marks)


7. (a) a) Explain the following (CO2)
v. Memo motion study. (03)
vi. Micro motion study. (03)
vii. Cyclegraph. (03)
viii. Chronocyclegraph. (04)
(OR)
(b) Explain the basic procedure and steps involved in method study. (13) (CO2)
8. (a) Explain in details about Value Analysis. (13) (CO3)
(OR)
(b) Explain analysis of process capabilities in a multi-product system. (13) (CO3)

Part-C (1×12=12 Marks)


9. (a) Explain analysis of process capabilities in a multi-product system. (12) (CO3)
(OR)
(b) A product is sold at a rate of 400 pieces a day and is manufactured at a rate of 2000 pieces
a day. The setup costs of the machine are Rs.5000 and the storage costs found to be Rs.0.015
per unit per day. Labour charges are Rs.120, materials Rs.80, and overheads Rs160 per piece.
If the interest charges are 13% find the minimum-cost batch size and the costs of the
production run. Assume 300 working days in a year (12) (CO3)
***ALL THE BEST***

SUBJECT INCHARGE HOD PRINCIPAL


COURSE
DETAILS
OUTCOME

CO2 Describe the functions of work study, Method study & Work measurement
Techniques of various production system.

CO3 Extending the original product information& Value analysis to know Process
planning and routing-Pre requisite information needed for process planning