Professional Documents
Culture Documents
Shorte!: Name of Work: Brpzeposation of Bor Beading Gchedule
Shorte!: Name of Work: Brpzeposation of Bor Beading Gchedule
Fo oting 0.622248
Long e L 13 20.54
F)12 bar
O.62 936
12-8
shorte! 10 10 1.28
ba To tal- 269.23
on
SSBTS COET, BAMBHORIJALGAON.
DEPARTMENT OF CIVIL ENGINEERING
Column
Main 1290 S1.60 |4-58 81G2
Ca,24 bar
16 4
,840,
141213 Main o89 45.92
12:90 S160
1415 12
bar
100232 1232o 0.294-94
Linko8
100.G46 154" 60 0.59 60.29
Links
rotal: '235.4
ro tol weightj=3s9. 24 kg
$SBTS COET, BAMBHORI JALGAON.
DEPARTMENT OF CIVIL ENGINEERING
| Ba main 26 4444822296
Z58 35.22
ba 158 35-22,
rop bar 16 2 14-44822-29 6
4734
Cutas| 16 G.488 40946 158
bar
2-2086.646 4-S8 o46
2
bar
1524 6.096 o-89 S.42G
Over
12
Conh'noug
BUp port
EXtra 122 2:2464:492 D.89 3-994
Over end
aupport
+o1352 94:64 O39 |36.90
Stiupa Total444.G52
Be
16 3 4448| 33444 2-38 S2-84
main ba Full ba
16 3 44-448|33444 4-58 S284
Top bar Full ba
|Exbra 4524 G.o96 o.89 S.42
Dver end 12 4
Bupport
8 68 ,252 94936 o.39 B58G
shipg trotal 14695g
B3 46 h4.o98 |33.2941·S8 S260
main bor Ful| ba E
46 14-09833294 1·58 s2-6
Top bar Full ban
4
pn
SSBTS COET, BAMBHORIJALGAON.
DEPARTMENT OFCIVIL ENGINEERING
Bar Bending Schedule
Name Of Work
prepoalion
Rcc b Qo
oF bax banding Gehedule For
S
No
Location as
per
Name of
bar
JCO
Shape of bar
dimension
in cm
Dia in
mm
Nos. Length in
M
Total Length WT/ M
Kg/m
Total
Weight
Kg
Exba
over end 42 15246.096 o.89 S425
|bupport
681-35294.9936| o.935-63
Stwp trotal: 46.45
4 B4
main ba Full baL 16 11: 098 32.2941-S8S26o
Top ba Full ba i098 33-294 4s8 52:6d
Extra
12 4 1924 6096 o.89 G42
|support
664352 89.23 O.39 34-80
Total 145-42
5) Bs
main bor Full ba 16 44. 098|33-294156 52:6
Qrta 12 1.8363-642 o89 326
bar
|12 2 45363042. o.89 2:43
bar
|Curta
bar
42 2 4.246 8.432 o89so
Top bar Foll ba 16 44-098 |3329458S2:6
EXtra.
overto 12 2 22464:492. 089 399
-ntinou
bupport
|Stirps 8 66429285.242 o.39 2
3223
Total 31gg2
SSBTS COE1, BAMBHORIJALGAON.
DEPARTMENTOF CIVIL ENGINEERING
Bar Bending Schedule
Name ot Work:Preparahon of bar bending Gchedule. CBe9)
For Rcc benm
Total
S Total Length WT/ M
Location as Name of Shape of bar Dia in Nos. Length in Weight
No per bar dimension mm M M Kg/m
Kg
in cm
6) B6 G264
Main bar Ful ba 16 11·148 33.44 1S8
o-89 9g.46
lQurta
bar
12 2 548810946
O.89 g88
Curtas 3.308&.616
12
bar
4114823.44 S8 G284
Top bar Foll bo 18
Extra o89 241
12 15243048
Etnoug
pport
2246 4492 o89 399
Extra 12
lover end
Bupport 65 43526.88 o39 3424
Stiorups
Total 16229
B 2 6.89843.496158 21-49
moin bam Full bat L 6
6.89843.96 1S8 21:49
Top bar Full bar 46 2
|main ba Fl ba 16 2 4.7829.964
1G"14
Top bar Ful bar 16 |47829.s64
1·332 So. 024o29 19.5
Stps 8 34 trotal = 49.42.
52 35-69
mein 3246991-53 o.39
Coiing
Room]
bar
Dis+ baL
L8 14 6.B04104.16 o.39 44-79
CLiving 43 2439 104.84 o.39 4o 8
Room bar
bo P8 146.304 10416 0.39 43-g
30260448.12 o.39 3046
rmain
bar 48 44 24 g.63 0-39 31-05
St.
Bedroo moin . 30 3S44104:22 o.39 41-81
bor
344X2:+ man bat 48 44249.63 o39 4-05
e8 67:9 39 68:29
b a 828 2.425
masn 44 4125 G010 o:39 go49
[kitchenoin banee
6) LBedrooasn 8 232 424 624 o-39 2g.
bar 4.24|8-35 O39 30SS
41X2 masn boeo8 19
Bedroor) main &28 2:424 6-24 039 29.44
bar
main 19 |424 48:35 O39 KOS5
bor
O-39 10:29
8) |main b a t a 8 44 .849426.23
bam B 24
main e 2254249 O39 966
|1.099 13.46
CTofet] main bot C 8 44- 2424 1486
O39 36
1X1 Drst.
Digt ba L J 6 4460 o39G49
o39 s.44
main boc 8 |12 1439
a oie+) DrG+sknes L 8 |4244486 Lo:39 g.49
Total 933gc
SSBTS COET, BAMBHORI JALGAON.
DEPARTMENT OFCIVIL ENGINEERING
Bar Bending Schedule
Name Of Work:
paapoaaliod of boa bending Gchodale.
Fo chajja and staivcage
S Location as Name of Shape of bar Dla in Nos. Length in Total
No per bar
Total Length WT/ M
dimension mm M M Kg/m Weight
in cm Ke
10 14 O.6134
Staircase ba 11-9
|Dist. 24g 2209 0-39 872
|bar
432530 24S61 48·46
Total: S8.55
kg
chojja main 10 14 1-412g 12.245 D.64 7-54
bar
disbibuth 10 4. 46 O"61 H.453
bar Total-4·99
O.4301.446 O.61 089
Lintel Top ba 10