Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MATCHLINE SEE DWG. NO.

CI-TP-01-04-001

ADDITIONAL NOTE:
AL MARYAH ISLAND
01. CONTRACTOR SHALL CONSIDER END CAP AT INTERFACE LOCATION BETWEEN
REGIONAL AND LOCAL INFRASTRUCTURE.
02. ALL PLOT CONNECTIONS INSIDE THE PLOT WILL BE UNDER LOCAL ROAD CONTRACT.
001 002 003 004 005 006 Bus
Stop

Bus
Stop

Bus
Stop

Stop
Bus

Stop
Bus

Bus
Stop
Stop
Bus

Stop
Bus

Stop
Bus
007 008 009 010 011 012
Stop
Bus

Stop
Bus

Stop
Bus

Bus
Stop

Bus
Stop

Stop
Bus
18W
Bus
Stop

Stop
Bus
18 W

Bus
Stop
JN-11 ROAD CC-1 013 014 015 016 017 018

Stop
Bus

Stop
Bus
Stop
Bus

Stop
Bus
Stop
Bus

9W
AL REEM ISLAND

19
18
17
16
20

15
14
21

13
12
22

11
10
9

23

8
7
24
6

5
4

25

3
2
1

18W
KEY PLAN
NOTES
9W
1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE

4
W
STATED.
2. ALL COORDINATES ARE IN WGS 84 UTM ZONE IN 40N.
ALL ELEVATIONS ARE REFERED TO NEW ABUDHABI
9W DATUM (NADD).
3. ALL DUCTS CROSSING UNDER THE CARRIAGE/
DRIVEWAY SHALL BE CONCRETE ENCASED.
L.O.C

RT4-P19
LEGEND
EXISTING:
TELECOM NETWORK
TELECOM NETWORK TO BE REMOVED
PROPOSED:
9 WAY D54 100 mm PVC

RT4-C5
MAIN DUCT
6 WAY D54 100 mm PVC
MAIN DUCT
4 WAY D54 100 mm PVC
MAIN DUCT
2 WAY D54 100 mm PVC

MATCHLINE SEE DWG. NO. CI-TP-01-04-008


MAIN DUCT
2 WAY D54 100 mm PVC
9W

LEAD - IN DUCT
TELECOM NETWORK
UNDER LOCAL PACKAGE
TELECOM 9WAY DUCT
BY OTHERS
DUCT CONCRETE
9W

ENCASEMENT PROTECTION
MRT4
JOINT BOX / MANHOLE
JRC 14
JOINT BOX / MANHOLE
JRC 12
POP
TELECOM POP
INSIDE THE BUILDING
GREEN FIELD GSM
(10m x 10m) PLOT

RT4-C4
BUILDING ROOF TOP GSM
MUSHTARAK
SCOPE UNDER REGIONAL ROADS

L.O.C CHLORINATION PLOT


18 W

PROJECT BOUNDARY

CONSTRUCTION DOCUMENT

18 W TIE-IN CONNECTION TO
EXISTING NETWORK

R
RT4-P9

T4
-P
MANHOLE 9W

9A
REV. DATE DESCRIPTION APPR'D
9W

Client
18 W

6WAY
9W
9W 9W

Consultant

Project / Contract
CONSTRUCTION OF ESSENTIAL INFRASTRUCTURE

9W
9W

WORKS FOR PACKAGE II (A) (REGIONAL


18 W

JN-12 ROAD BB INFRASTRUCTURE) AND PACKAGE II (B)


(SEA BRIDGE) REEM ISLAND, ABU DHABI
9W

Drawing Title

TELECOM NETWORK LAYOUT


SHEET 07 OF 18
L.O.C

18 W
CONTRACT No: JOB No:
9W L.O.C
9W

DRAWN DESIGNED CHECKED APPROVED


9W

TAT JC MWA IS
W
RT4-P74
9

9W 9W TIE-IN CONNECTION TO
DATE APRIL 2021 ACTUAL SIZE A1
9 Drawing Scale. 1:500 @ A1, 1:1000 @ A3
9W W 9W EXISTING NETWORK 0 5 10 20 30 40 50m

STUB - DUCTS
Drawing No.
MATCHLINE SEE DWG. NO. CI-TP-01-04-013 CI-TP-01-04-007 C0
\\Xeuae03fs01\UAEAUH_TRP\PROJECTS\000000 Reem Island Pkg-IIA\04 Users\CADD\PDF\IFC DRAWINGS REGIONAL_(07-FEB-2022)\CAD\PART-6 UTILITIES\27-TELECOME NETWORK LAYOUT\CI-TP-01-04-001 TO 018.dwg
Last Saved By: P0090252 Last Saved Date: 2/6/2022 7:38 PM Printed Date: 2/6/2022 7:48 PM Printed By: Varghese, Sinu [NN-AE]