Shower Room Plan
RWRDD-PROGRAMMING
CITY ENGINEER'S OFFICE BUILDING, PICHON ST., DAVAO CITY
PLANS
1
and
4
STRUCTURAL REPAIRS
REPLACEMENT OF HINGES
REPLACEMENT DOOR LOCKS
REPAIR OF TUBULAR BARS
ADDITIONAL TOWEL RACK
REPAINTING OF PURLINS
ELECTRICAL REPAIRS
REPLACING AND ADDING OF LIGHTS BULBS
REPLACEMENT AND REPAIR OF LIGHT SWITCH
ADDITIONAL ELECTRICAL WIRES
PLUMMING REPAIRS
REPLACEMENT OF SHOWER HEADS
REPLACEMENT OF SHOWER BULBS
REPLACEMENT OF WATER FAUCET
REPAIR OF WATER PIPES
DECLOGGING OF FLOOR DRAINS
AS FOUND VIEW
2.14 2.14
1.00
SCALE: NTS.
11.30
0.96
0.53
0.20 1.91
1.92
3
and
4
10.00 10.00
1.00 1.00
WATER METER
1.00 1.00
0.19 0.19
0.76 0.76
1.00
CIRCUIT BREAKER
2.13
SWITCH SWITCH SWITCH SWITCH SWITCH
0.19
0.76
1.00
ELECTRICAL PLAN LAYOUT
SCALE: NTS.
0.30
STRUCTURAL PLAN LAYOUT
SCALE: NTS.
2.14
1.07
1.00
By The Authority of the City Mayor Per
4
Executive Order No. 28, Series of 2022.
Dated July 01, 2022
and
4