Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 26

BQ OF BELT PRESS SYSTEM

A. Platform & Building


No. Part/Materials QTY OUM Price Remarks
Pekerjaan Pondasi
1 Bowplank 1 lot 9,037,793
2 Galian 7.69 m3 1,269,675 tapak
3 Lean concreate 0.41 m3 2,040,069 tapak SQ 900
4 Cor K300 (ready mix) 2.43 m3 5,910,324 tapak SQ 900 dan SQ 300
5 Besi beton 10 mm x 12 meter (ulir) 38 batang 7,056,747 tapak SQ 900 dan SQ 300
6 Besi beton 8 mm x 12 meter (ulir) 6 batang 1,592,481 tapak SQ 300
7 Anchor bolt dia. 25 mm 20 PCS tapak SQ 300
8 Bekisting /mal 1 lot 12,754,280

Pekerjaan Lantai (Ground Floor)


1 Lean concreate 4.20 m3 8,568,290 lantai 6 x 14 meter thk 50 mm
2 Cor K300 (ready mix) 12.60 m3 30,646,124 lantai 6 x 14 meter thk 150 mm
3 BRC A10 2.2m x 6m x 6mm 13 lembar 36,353,570 lantai 6 x 14 meter (2 layers)
4 Bekisting /mal 1 lot 6,124,388

Pekerjaan Struktur
1 H beam 200 x 200 x 50 kg/m 10 batang 10 column
2 MS Plate thk. 25 mm x 300mm x 300 mm 10 pcs base plate for 10 column
3 SS gutter thk. 1 mm 12 meter rain gutter
4 SS Flat Bar 50x9 Thk. x @1m (Gutter support) 14 pcs rain gutter
5 Bolt & nut M12 28 pcs rain gutter
6 Channel 152 x 76 x 17.88 kg/m x 6 m (hot dipped galv.) 2 batang rain gutter
7 Pipa PVC 4"x 6 meter 4 batang 1,333,063
8 Elbow PVC 4", 90 derajat 6 pcs 720,000
9 Elbow PVC 4", 45 derajat 6 pcs 720,000

Pekerjaan Lantai (Platform floor)


1 H Beam 150 x 150 x 31.5 kg/m 4 batang
2 Channel 300 x 90 x 43.8 kg/m 4 batang
3 Channel 150 x 75 x 18.6 kg/m 9 batang
4 Cor K300 (ready mix) 10.00 m3 24,322,320 Lantai 10 x 6 meter thk 100 mm
5 BRC A8 2.2m x 6m x 6mm 9 lembar 19,700,540 Lantai 10 x 6 meter (2 layers)
6 Toe plate thk. 6 mm 60 m2 Lantai 10 x 6 meter
7 Bondek struktural steel decking 1 mm thk 60 m2
7 Bekisting /mal 1 lot 119,109,895

Pekerjaan Atap
1 H Beam 200 x 200 x 50 kg/m 6 batang Roof beam
2 H Beam 100 x 50 x 9.3 kg/m 5 batang Roof beam
3 GI lipped channel 100 x 50 x 20 x 4.06 kg/m x 6 m 14 batang Roof beam
4 MS Plate thk. 12 mm x 1200 x 2400 mm 1 lembar Roof beam
5 High tensile bolt & nut dia. 19 mm 20 pcs
6 H beam 152 x 152 x 15 kg/m 1 batang
7 MS Plate thk. 10 mm x 1200 x 2400 mm 1 lembar
8 MS Plate thk. 16 mm x 1200 x 2400 mm 1 lembar
9 High tensile bolt & nut dia. 12 mm 112 pcs
10 High tensile bolt & nut dia. 22 mm 56 pcs
11 Fiberglass cladding sheet 60 m2
12 Fiberglass roofing sheet 64 m2
13 Sagroods dia. 12 mm C/W bolt & nut 8 set
14 Bracing mat. MS angle bar 65 x 65 x 6 thk 8 batang
Total

B. Solid Bin
No. Part/Materials QTY OUM Price Remarks
Pekerjaan Pondasi
1 Bowplank 1 lot 8,251,898
2 Galian 0.56 m3 92,813 5 tapak
4 Cor K300 (ready mix) 0.56 m3 1,368,131 5 tapak
5 Bolt & nut M24 x 450 long 20 batang 5 tapak
6 Angle bar 25 x 25 x 3 thk x 6000 mm 2 batang 5 tapak
7 MS Plate thk. 20 mm x 1200 x 2400 mm 1 batang base plate 5 tapak
8 Non shrink grout 0.0153 batang base plate 5 tapak
9 Bekisting /mal 1 lot 4,666,200
Pekerjaan Lantai
1 Galian 15.19 m3 2,506,350 7 x 7.75 m x 280 mm thk. (include wall)
2 Lean batu gunung 12.478 m3 29,438,322 concreate 7 x 7.75 m x 230 mm thk.
3 Lean concreate 2.71 m3 5,533,687 7 x 7.75 m x 50 mm thk.
4 Cor K300 (ready mix) 10.85 m3 26,389,718 7 x 7.75 m x 200 mm thk.
5 BRC A8 2.2m x 6m x 6mm 8 lembar 17,812,571 for 2 layers
6 Besi beton 12 mm x 12 meter (ulir) 7 batang 1,725,188 Hump at entrance
7 Bekisting/Mal 1 lot 5,258,715

Pekerjaan Struktur
1 H Beam 200 x 200 x 50 kg/m 5 batang 5 Column
2 Cor K300 (ready mix) 2.75 m3 6,688,638 5 Column
3 Besi beton 20 mm x 12 meter (ulir) 8 batang 7,104,152 5 Column
4 Besi beton 10 mm x 12 meter (ulir) 10 batang 1,835,570 5 Column
5 SS gutter thk. 1 mm 12 meter rain gutter
6 SS Flat Bar 50x9 Thk. x 6000 mm 6 batang rain gutter
7 Bolt & nut M12 12 pcs rain gutter
8 Channel 152 x 76 x 17.88 kg/m x 6 m (hot dipped galv.) 1 batang rain gutter
9 Pipa PVC 4" x 6 meter 2 batang 666,531
10 Elbow PVC 4", 90 derajat 3 pcs 360,000
11 Elbow PVC 4", 45 derajat 3 pcs 360,000

Pekerjaan Atap
1 H Beam 200 x 200 x 50 kg/m x 6 meter 4.00 batang
2 H Beam 175 x 175 x 40.2 kg/m x 6 meter 5 batang
3 Rectangular Hollow Section 150 x 75 x 19.33 Kg/m x 6 meter 3 batang
4 Square Hollow Section 50 x 50 x 7.56 kg/m x 6 meter 3 batang
5 Fiberglass roofing sheet 90 m2
6 Channel 100 x 50 x 20 x 4.06 kg/m x 6 meter 12 batang
7 MS plate thk. 16 mm x 200 mm x 1100 mm 2 pcs base plate trusses
8 Bolt & nut dia. 22 mm 20 pcs
9 MS Plate bar 12 thk x 200 x 200 mm 24 pcs stiffener
10 Double plate 5 set as drawing

Pekerjaan retening wall 7000 x 2000 x 300 mm thk


1 Galian 3.92 m3 646,800 Apron 2000 mm
2 Lean batu gunung 3.22 m3 7,596,986 Apron 2000 mm x 230 mm thk
3 Lean concreate 0.70 m3 1,428,048 Apron 2000 mm x 50 mm thk.
4 Cor K300 (ready mix) 7.89 m3 19,196,391 RC wall & apron
5 Besi beton 16 mm x 12 meter (ulir) 13 batang 6,150,400 RC wall & apron
6 Besi beton 12 mm x 12 meter (ulir) 49 batang 12,936,696 RC wall & apron
7 BRC A8 2.2m x 6m x 6mm 3 lembar 6,501,178 apron (2 layers)
8 Bekisting / Mal 1 Lot 21,775,600

Pekerjaan retening wall 2 x 6000 x 2000 x 200 mm thk


1 Galian 6.72 m3 1,108,800 2 x Apron 2000 mm
2 Lean batu gunung 5.52 m3 13,023,405 2 x Apron 2000 mm x 230 mm thk
3 Lean concreate 1.20 m3 2,448,083 2 x Apron 2000 mm x 50 mm thk.
4 Cor K300 (ready mix) 10.89 m3 26,487,007 2 x RC wall & apron
5 Besi beton 16 mm x 12 meter (ulir) 22.5 batang 10,592,355 2 x RC wall & apron
6 Besi beton 12 mm x 12 meter (ulir) 72 batang 19,096,501 2 x RC wall & apron
7 BRC A8 2.2m x 6m x 6mm 4 lembar 8,668,238 apron (2 layers)
8 Bekisting / Mal 1 Lot 34,296,570

Pekerjaan Drainase 300


1 Galian 1.62 m3 267,300 300 x 300 x 4000 mm
2 Cor K300 (ready mix) 0.84 m3 2,046,723 300 x 300 x 4000 mm
3 Lean concreate 0.12 m3 244,808 300 x 300 x 4000 mm
4 BRC A8 2.2m x 6m x 6mm 1 lembar 2,167,059 300 x 300 x 4000 mm (2 layers)
5 Bekisting /Mal 1 lot 169,052,538

Pekerjaan sum pit 900 x 900 x 600 mm C/W HDG Channel Cover
1 Galian 2.98 m3 490,978 900 x 900 x 600 mm
2 Cor K300 (ready mix) 2.86 m3 6,963,784 900 x 900 x 600 mm
3 Lean concreate 0.1125 m3 229,508 900 x 900 x 600 mm
4 Besi beton 10 mm x 12 meter (ulir) 6 kg 1,101,342 T10-150
5 Bekisting / Mal 1 batang 7,115,955
6 High alumina Cem. Plast. 20 mm thk 2.97 m2
7 HDG Channel cover (900 x 900 mm) as drawing 1 set HDG Channel Face Down

Pekerjaan sum pit 600 x 450 x 375 mm C/W HDG Grating Cover
1 Galian 0.41 m3 66,825 sum pit 600 x 450 x 375 mm
2 Cor K300 (ready mix) 0.22 m3 533,571 sum pit 600 x 450 x 375 mm
3 Lean concreate 0.03 m3 68,852 sum pit 600 x 450 x 375 mm
4 Besi beton 10 mm x 12 meter (ulir) 6 batang 1,055,453 T10-150
5 Bekisting / Mal 1 Lot 4,977,280
6 High alumina Cem. Plast. 20 mm thk 1.1475 m2
7 HDG grating cover detail 600 x 450 mm (as drawing) 1 set
Total

C. Pekerjaan Drainase 300


No. Part/Materials QTY Top up Price Remarks
1 Galian 23.306 m3 3,845,531 Parit 300 x 400 x 82500 mm
2 Cor K300 (ready mix) 9.4 m3 22,975,472 Parit 300 x 400 x 82500 mm
3 Lean concreate 2.1 m3 4,207,642 Parit 300 x 400 x 82500 mm
4 BRC A8 2.2m x 6m x 6mm 14 lembar 29,797,066 1 layer
5 Bekisting /Mal 1 lot 169,052,538

Pekerjaan sum pit 1500 mm x 1500 mm


1 Galian 3.89 m3 641,520 Sum 1500 SQ
2 Cor K300 (ready mix) 2.07 m3 5,034,720 Sum 1500 SQ
3 Lean concreate 0.16 m3 330,491 Sum 1500 SQ
4 BRC A6 2.2m x 6m x 6mm 2 lembar 2,336,571 2 layers
5 Bekisting / Mal 1 Lot 7,115,955

Pekerjaan sum pit 1000 mm x 1000 mm


1 Galian 2.30 m3 379,335 2 sum 1000 SQ
2 Cor K300 (ready mix) 1.57 m3 3,812,524 2 sum 1000 SQ
3 Lean concreate 0.121 m3 246,848 2 sum 1000 SQ
4 BRC A6 2.2m x 6m x 6mm 2 lembar 2,234,981 2 layers
5 Bekisting / Mal 1 Lot 4,977,280
Total

D. Platform, Straircase, Walkway, and Handrailing


No. Part/Materials QTY Top up Price Remarks
Pekerjaan Platform Level 4650 m
1 Ornamental pipe dia. 32 mm x 6 meter 4 batang Handrail platform
2 Black pipe dia. 32 mm x 6 meter 5 batang Handrail platform
3 Black pipe dia. 25 mm x 6 meter 4 batang Handrail platform
4 Ornamental elbow 90 derajat dia. 32 mm 8 pcs Handrail platform
6 Steam elbow 90 derajat dia. 25 mm 8 pcs Handrail platform
7 C channel 125 x 65 x 13.4 kg/m x 6 meter 9 batang support platform
8 Angle bar thk. 6 mm x 45 mm x 45 mm x 6000 mm 2 batang support platform
9 Checquered plate thk. 4.5 mm x 1200 mm x 2400 mm 3 lembar Handrail platform
10 Checquered plate thk. 6 mm x 1200 mm x 2400 mm 1 lembar tangga
11 MS flat bar thk. 8 x 125 x 6000 mm 1 batang base plate tangga
12 Bolt & Nut 18 mm x 1" c/w washer (Chemichal Bolt) 4 pcs base plate tangga
13 MS flat bar thk. 6 mm x 100 mm x 6 meter 4 batang Kicker plate
14 MS flat bar thk. 6 mm x 75 mm x 6 meter 4 batang Handrail platform
15 Bolt & Nut 1/2" x 1" c/w washer (Chemichal Bolt) 50 pcs Handrail platform

Pekerjaan Inclined Ladder Level 3550 m


1 Ornamental pipe dia. 32 mm x 6 meter 4 batang Handrail of ladder
2 Black pipe dia. 32 mm x 6 meter 4 batang Handrail of ladder
3 Black pipe dia. 25 mm x 6 meter 4 batang Handrail of ladder
4 Ornamental elbow 90 derajat dia. 32 mm 8 pcs Handrail of ladder
5 Steam elbow 90 derajat dia. 25 mm 8 pcs Handrail of ladder
6 C Channel 150 x 75 x 18.6 kg/m x 6 meter 4 batang ladder
7 MS flat bar thk. 10 mm x 200 mm x 6000 mm 1 batang base plate of ladder
8 Checquered plate thk. 6 mm x 1200 mm x 2400 mm 2 lembar ladder
9 Bolt & Nut 18 mm x 1" c/w washer 10 pcs ladder
13 MS flat bar thk. 6 mm x 100 mm x 6 meter 4 batang Kicker plate
Total

E. Belt Press HFS Concreate Tank


No. Part/Materials QTY OUM Remarks
Mechanical Material
1 SS Pipe DN100 1 batang Drain
2 Black Pipe DN100 4 batang Drain
3 MS elbow 90 deg DN 100 3 pcs
4 Butterfly Valve DN 100 C/W Bolt & Nut 14 pcs Drain
5 SS Flange DN100 13 pcs Drain
6 MS Flange DN100 17 pcs Drain
7 Ornamental Chrome pipe dia. 25 mm x 6000 mm 3 batang Handrail
8 Black pipe dia. 32 mm x 6 meter 3 batang Handrail
9 Black pipe dia. 25 mm x 6 meter 3 batang Handrail
10 Ornamental elbow 90 derajat dia. 32 mm 4 pcs Handrail
11 Steam elbow 90 derajat dia. 25 mm 4 pcs Handrail
Expended Metal code no. 1000, thk. 4.5 mm x 1200 mm x 2400 mm standar
12 2 lembar Platform
width 6 mm
13 C-Channel thk. 6.5 mm x 150 mm x 75 mm x 6000 mm 4 batang Platform
14 Angle bar thk. 4 mm x 50 x 50 x 6000 mm 2 batang Tulang tengah platform
15 MS flat bar thk. 6 mm x 100 mm x 6 meter 4 batang Kicker plate

Civil Material
1 Cor K300 (ready mix) 22.0 m3 53,509,105
2 Besi beton 6 mm x 12 meter (ulir) 15 batang 1,763,636
3 BRC A6 2.2m x 6m x 6mm 33 lembar 2 layers
4 Bekesting / Mal 1 Lot
5 Timbunan 21.62 m3 14,073,269

Inclined Ladder
1 Ornamental pipe dia. 32 mm x 6 meter 2 batang Handrail of ladder
2 Black pipe dia. 32 mm x 6 meter 2 batang Handrail of ladder
3 Black pipe dia. 25 mm x 6 meter 2 batang Handrail of ladder
4 Ornamental elbow 90 derajat dia. 32 mm 4 pcs Handrail of ladder
5 Steam elbow 90 derajat dia. 25 mm 4 pcs Handrail of ladder
6 C Channel 150 x 75 x 18.6 kg/m x 6 meter 1 batang ladder
7 Bolt & Nut 18 mm x 1" c/w washer 10 pcs ladder
8 MS flat bar thk. 6 mm x 100 mm x 6 meter 2 batang Kicker plate
9 Checquered plate thk. 6 mm x 1200 mm x 2400 mm 1 lembar tangga
10 MS flat bar thk. 6 mm x 75 mm x 6 meter 1 batang Handrail platform
11 Bolt & Nut 1/2" x 1" c/w washer (Chemichal Bolt) 8 pcs Handrail platform
Total

F. Piping & Fittings


No. Part/Materials QTY OUM Remarks
Clean water tank piping
1 SS pipe 2 inch x 6 meter sch 10 2 batang
2 SS elbow 90 deg size 2 inch 2 pcs
3 SS flange JIS 10K size 2 inch 4 pcs
4 Butterfly valve CI body size 2 inch C/W bolt & nut 1 pcs

Buffer tank piping


1 Butterfly valve CI body size 4 inch C/W bolt & nut 2 pcs
2 SS flange JIS 10K size 4 inch 4 pcs
3 SS pipe 4 inch x 6 meter sch 10 1 batang
4 SS elbow 90 deg size 4 inch 1 pcs

Belt press piping


1 Velocity breaker (as drawing) 1 set Velocity Braker of HFS
2 Ball valve CI size 6 inch JIS 10K C/W bolt & nut 1 pcs Velocity Braker of HFS
3 PVC pipe 6 inch x 6 meter 2 batang
4 PVC flange 6 inch 7 pcs
5 PVC elbow 90 deg size 6 inch 1 pcs
6 PVC Tee size 6 inch 2 pcs
7 SS pipe 6 inch x 6 meter sch 10 1 batang
8 SS flange JIS 10K size 6 inch 1 pcs

Cyclone piping
1 Butterfly valve CI body size 4 inch C/W bolt & nut 3 pcs
2 SS flange JIS 10K size 4 inch 6 pcs
3 SS pipe 4 inch x 6 meter sch 10 1 batang
4 Black pipe 4 inch x 6 meter sch 20 1 batang

Feed Tank piping


1 SS flange size 4 inch JIS 10K 2 pcs Feed tank
2 SS pipe size 4 inch x 6 meter sch 10 3 batang Feed tank
3 SS elbow 90 deg size 4 inch 6 pcs Feed tank
4 Butterfly valve CI body size 4 inch C/W bolt & nut 1 pcs Feed tank

Pit piping
1 HDPE pipe 4 inch x 6 meter PN12 5 batang
2 HDPE stud end 4 inch 4 pcs
3 Butterfly valve CI body size 4 inch C/W bolt & nut 2 pcs
4 MS Flange 4 inch JIS 10K 4 pcs
5 HDPE elbow 4 inch 90 deg 4 pcs
Total

G. Others
No. Descriptions QTY OUM Remarks
1 Upah Kerja 1 lot building & mechanical work
2 Consumable Material 1 lot
3 Mobilisasi dan Demobilisasi 1 lot
4 Pemasangan mesin belt press, tangki, pump, conveyor & piping 1 lot
5 Finishing & commissioning 1 lot
Total

H. Painting
No. Descriptions QTY OUM Remarks
1 Nippon zink phospate primer-Grey Green 50 liter Primer/base coat for all Mechanical
2 Cat tembok Nippon MIO-silver 20 liter Building steel structure

Handrail & platform (bottom), machinery


3 Cat Nippon 9000 Gloss Finish - Slate (1325) 20 liter
support structure, screw conveyor

4 Cat Nippon 9000 Gloss Finish - Papier grey (1139) 20 liter Platform (top) & kicker plate
5 Thinner 50 liter
Total

Note :
- Cat primer/base coat = 1 layer
- Cat finishing/top coat = 2 layer
ANALISA HARGA SATUAN PEKERJAAN

A. 2.2.1.9 (K3) Pembersihan 1 m2 lapangan dan perataan


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 125,000
Mandor L.04 OH 0.050 312,500
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

E PROFIT 10%
F TOTAL HARGA (D+E)

A. 2.2.1.4 Pengukuran dan pemasangan 1 m' Bouwplank

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

A TENAGA
Pekerja L.01 OH 0.100 125,000
Tukang kayu L.02 OH 0.100 187,500
Kepala tukang L.03 OH 0.010 250,000
Mandor L.04 OH 0.005 312,500
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 m3 0.012 7,500,000
Paku 2" - 3" Kg 0.020 40,000
Kayu papan 3/20 m3 0.007 7,500,000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E PROFIT 10%
F TOTAL HARGA (D+E)

A. 2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.108 125,000
Mandor L.04 OH 0.037 312,500
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

E PROFIT 10%
F TOTAL HARGA (D+E)

A. 2.3.1.9 Pengurugan kembali 1 m3 galian tanah


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.500 125,000
Mandor L.04 OH 0.050 312,500
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

E PROFIT 10%
F TOTAL HARGA (D+E)

A. 3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.500 125,000
Tukang batu L.02 OH 0.750 187,500
Kepala tukang L.03 OH 0.075 250,000
Mandor L.04 OH 0.075 312,500
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 1,062,500
Semen portland Kg 136.000 2,250
Pasir pasang m3 0.544 750,000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

A. 4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K100)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.200 125,000
Tukang batu L.02 OH 0.200 187,500
Kepala tukang L.03 OH 0.020 250,000
Mandor L.04 OH 0.060 312,500
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 230 2,125
Pasir beton Kg 893 536
Kerikil (maks 30 mm) Kg 1027 590
Air Liter 200 350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

E PROFIT 10%
F TOTAL HARGA (D+E)

A. 4.1.1.5 Membuat 1 m3 beton mutu f'c = 14,5 MPa, slump (120 ± 20) mm (K175)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 125,000
Tukang batu L.02 OH 0.275 187,500
Kepala tukang L.03 OH 0.028 250,000
Mandor L.04 OH 0.083 312,500
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 326.000 2,125
Pasir beton Kg 760.000 536
Kerikil (maks 30 mm) Kg 1029.000 590
Air Liter 215.000 350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

E PROFIT 10%
F TOTAL HARGA (D+E)

A. 4.1.1.7 Membuat 1 m3 beton mutu f'c = 19,3 MPa, (K225)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 125,000
Tukang batu L.02 OH 0.275 187,500
Kepala tukang L.03 OH 0.028 250,000
Mandor L.04 OH 0.083 312,500
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 371.000 2,125
Pasir beton Kg 698.000 536
Kerikil (maks 30 mm) Kg 1047.000 590
Air Liter 215.000 350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

E PROFIT 10%
F TOTAL HARGA (D+E)

A. 4.1.1.10 Membuat 1 m3 beton mutu f'c = 26,4 MPa, (K300)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 125,000
Tukang batu L.02 OH 0.275 187,500
Kepala tukang L.03 OH 0.028 250,000
Mandor L.04 OH 0.083 312,500
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 413 2,125
Pasir beton Kg 681 536
Kerikil (maks 30 mm) Kg 1021 590
Air Liter 215 350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

E PROFIT 10%
F TOTAL HARGA (D+E)

A. 4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.520 125,000
Tukang kayu L.02 OH 0.260 187,500
Kepala tukang L.03 OH 0.026 250,000
Mandor L.04 OH 0.026 312,500
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040 7,500,000
Paku 5 cm - 10 cm Kg 0.300 35,000
Minyak bekisting Liter 0.100 30,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)

E PROFIT 10%
F TOTAL HARGA (D+E)

A. 4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 125,000
Tukang kayu L.02 OH 0.330 187,500
Kepala tukang L.03 OH 0.033 250,000
Mandor L.04 OH 0.033 312,500
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040 7,500,000
Paku 5 cm - 10 cm Kg 0.400 35,000
Minyak bekisting Liter 0.200 30,000
Balok Kayu kelas II m3 0.015 8,500,000
Playwood 9mm lbr 0.350 95,000
Dolken kayu Galam 4m btg 6 35,000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

E PROFIT 10%
F TOTAL HARGA (D+E)

A. 4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 125,000
Tukang kayu L.02 OH 0.330 187,500
Kepala tukang L.03 OH 0.033 250,000
Mandor L.04 OH 0.033 312,500
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040 4,902,000
Paku 5 cm - 12 cm Kg 0.400 18,000
Minyak bekisting Liter 0.200 23,000
Balok kayu kelas II m3 0.015 9,804,000
Plywood tebal 9 mm Lembar 0.350 236,000
Dolken kayu f 8-10/400 cm Batang 2.000 20,000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

E PROFIT 10%
F TOTAL HARGA (D+E)

A. 4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.070 125,000
Tukang besi L.02 OH 0.070 187,500
Kepala tukang L.03 OH 0.007 250,000
Mandor L.04 OH 0.004 312,500
JUMLAH TENAGA KERJA
B BAHAN
Besi beton (polos/ulir) Kg 10.500 18,750
Kawat beton Kg 0.150 25,000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
Jumlah (A+B+C) untuk 1KG

E PROFIT 10%
F TOTAL HARGA (D+E)

A. 7394 : 2008 ; 6,19 Pemasangan 1 kg jaring kawat baja (wiremesh)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.025 125,000
Tukang besi L.02 OH 0.025 187,500
Kepala tukang L.03 OH 0.002 250,000
Mandor L.04 OH 0.001 312,500
JUMLAH TENAGA KERJA
B BAHAN
Jaring kawat baja dilas Kg 1.020 21,577
Kawat beton Kg 0.050 25,000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

E PROFIT 10%
F TOTAL HARGA (D+E)

A. 4.4.1.3 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.600 125,000
Tukang batu L.02 OH 0.200 187,500
Kepala tukang L.03 OH 0.020 250,000
Mandor L.04 OH 0.030 312,500
JUMLAH TENAGA KERJA
B BAHAN
Bata merah Bh 140.000 1,125
Semen portland Kg 26.550 2,125
Pasir pasang m 3
0.093 750,000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

E PROFIT 10%
F TOTAL HARGA (D+E)

A. 4.4.2.4 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 125,000
Tukang batu L.02 OH 0.150 187,500
Kepala tukang L.03 OH 0.015 250,000
Mandor L.04 OH 0.015 312,500
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 6.240 2,125
Pasir pasang m3 0.024 750,000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

E PROFIT 10%
F TOTAL HARGA (D+E)

A. 4.4.2.27 Pemasangan 1 m2 acian


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 125,000
Tukang batu L.02 OH 0.100 187,500
Kepala tukang L.03 OH 0.010 250,000
Mandor L.04 OH 0.010 312,500
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 3.250 2,125
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

E PROFIT 10%
F TOTAL HARGA (D+E)

T.5,20021 Pemasangan 1 m' Pipa PVC AW 4"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.081 125,000
Tukang batu L.02 OH 0.135 187,500
Kepala tukang L.03 OH 0.135 250,000
Mandor L.04 OH 0.004 312,500
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4' m' 1.200 150,000
Perlengkapan harga pipa 0.350 150,000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

E PROFIT 10%
F TOTAL HARGA (D+E)
AAN

Jumlah Harga (Rp)

Rp 12,500
Rp 15,625
Rp 28,125

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp 28,125

Rp 2,813
Rp 30,938

Jumlah Harga (Rp)

Rp 12,500
Rp 18,750
Rp 2,500
Rp 1,563
Rp 35,313

Rp 90,000
Rp 800
Rp 52,500
Rp 143,300

Rp -
Rp -
Rp -
Rp 178,613
Rp 17,861
Rp 196,474

Jumlah Harga (Rp)

Rp 138,469
Rp 11,531
Rp 150,000

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp 150,000

Rp 15,000
Rp 165,000

Jumlah Harga (Rp)

Rp 62,500
Rp 15,625
Rp 78,125

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp 78,125

Rp 7,813
Rp 85,938
Jumlah Harga (Rp)

Rp 187,500
Rp 140,625
Rp 18,750
Rp 23,438
Rp 370,313

Rp 1,275,000
Rp 306,000
Rp 408,000
Rp 1,989,000

Rp -
Rp -
Rp -
Rp 2,359,313

, w/c = 0,87 (K100)

Jumlah Harga (Rp)

Rp 150,000
Rp 37,500
Rp 5,000
Rp 18,750
Rp 211,250

Rp 488,750
Rp 478,393
Rp 606,215
Rp 70,000
Rp 1,643,358

Rp -
Rp -
Rp -
Rp 1,854,608

Rp 185,461
Rp 2,040,069
Jumlah Harga (Rp)

Rp 206,250
Rp 51,563
Rp 7,000
Rp 25,938
Rp 290,750

Rp 692,750
Rp 407,143
Rp 607,396
Rp 75,250
Rp 1,782,539

Rp -
Rp -
Rp -
Rp 2,073,289

Rp 207,329
Rp 2,280,618

Jumlah Harga (Rp)

Rp 206,250
Rp 51,563
Rp 7,000
Rp 25,938
Rp 290,750

Rp 788,375 106,250
Rp 373,929 750,000
Rp 618,021 1,062,500
Rp 75,250
Rp 1,855,574

Rp -
Rp -
Rp -
Rp 2,146,324

Rp 214,632
Rp 2,360,957

Jumlah Harga (Rp)

Rp 206,250
Rp 51,563
Rp 7,000
Rp 25,938
Rp 290,750

Rp 877,625
Rp 364,821
Rp 602,674
Rp 75,250
Rp 1,920,370

Rp -
Rp -
Rp -
Rp 2,211,120

Rp 221,112
Rp 2,432,232

Jumlah Harga (Rp)

Rp 65,000
Rp 48,750
Rp 6,500
Rp 8,125
Rp 128,375

Rp 300,000
Rp 10,500
Rp 3,000
Rp 313,500

Rp -
Rp -
Rp -
Rp 441,875

Rp 44,188
Rp 486,063

Jumlah Harga (Rp)

Rp 82,500
Rp 61,875
Rp 8,250
Rp 10,313
Rp 162,938

Rp 300,000
Rp 14,000
Rp 6,000
Rp 127,500
Rp 33,250
Rp 210,000
Rp 690,750

Rp -
Rp -
Rp -
Rp 853,688

Rp 85,369
Rp 939,056

Jumlah Harga (Rp)

Rp 82,500
Rp 61,875
Rp 8,250
Rp 10,313
Rp 162,938

Rp 196,080
Rp 7,200
Rp 4,600
Rp 147,060
Rp 82,600
Rp 40,000
Rp 477,540

Rp -
Rp -
Rp -
Rp 640,478

Rp 64,048
Rp 704,525

Jumlah Harga (Rp)

Rp 8,750
Rp 13,125
Rp 1,750
Rp 1,250
Rp 24,875

Rp 196,875
Rp 3,750
Rp 200,625

Rp -
Rp -
Rp -
Rp 225,500
Rp 22,550

Rp 2,255
Rp 24,805

Jumlah Harga (Rp)

Rp 3,125
Rp 4,688
Rp 500
Rp 313
Rp 8,625
Rp 22,008
Rp 1,250
Rp 23,258

Rp -
Rp -
Rp -
Rp 31,883

Rp 3,188
Rp 35,071

mpuran 1SP : 4PP

Jumlah Harga (Rp)

Rp 75,000
Rp 37,500
Rp 5,000
Rp 9,375
Rp 126,875

Rp 157,500
Rp 56,419
Rp 69,750
Rp 283,669

Rp -
Rp -
Rp -
Rp 410,544

Rp 41,054
Rp 451,598

Jumlah Harga (Rp)

Rp 37,500
Rp 28,125
Rp 3,750
Rp 4,688
Rp 74,063
Rp 13,260
Rp 18,000
Rp 31,260

Rp -
Rp -
Rp -
Rp 105,323

Rp 10,532
Rp 115,855

Jumlah Harga (Rp)

Rp 25,000
Rp 18,750
Rp 2,500
Rp 3,125
Rp 49,375

Rp 6,906
Rp 6,906

Rp -
Rp -
Rp -
Rp 56,281

Rp 5,628
Rp 61,909

Jumlah Harga (Rp)

Rp 10,125
Rp 25,313
Rp 33,750
Rp 1,281
Rp 70,469

Rp 180,000
Rp 52,500
Rp 232,500

Rp -
Rp -
Rp -
Rp 302,969

Rp 30,297
Rp 333,266
.