BQ of Belt Press-Civil 01032023
BQ of Belt Press-Civil 01032023
Pekerjaan Struktur
1 H beam 200 x 200 x 50 kg/m 10 batang 10 column
2 MS Plate thk. 25 mm x 300mm x 300 mm 10 pcs base plate for 10 column
3 SS gutter thk. 1 mm 12 meter rain gutter
4 SS Flat Bar 50x9 Thk. x @1m (Gutter support) 14 pcs rain gutter
5 Bolt & nut M12 28 pcs rain gutter
6 Channel 152 x 76 x 17.88 kg/m x 6 m (hot dipped galv.) 2 batang rain gutter
7 Pipa PVC 4"x 6 meter 4 batang 1,333,063
8 Elbow PVC 4", 90 derajat 6 pcs 720,000
9 Elbow PVC 4", 45 derajat 6 pcs 720,000
Pekerjaan Atap
1 H Beam 200 x 200 x 50 kg/m 6 batang Roof beam
2 H Beam 100 x 50 x 9.3 kg/m 5 batang Roof beam
3 GI lipped channel 100 x 50 x 20 x 4.06 kg/m x 6 m 14 batang Roof beam
4 MS Plate thk. 12 mm x 1200 x 2400 mm 1 lembar Roof beam
5 High tensile bolt & nut dia. 19 mm 20 pcs
6 H beam 152 x 152 x 15 kg/m 1 batang
7 MS Plate thk. 10 mm x 1200 x 2400 mm 1 lembar
8 MS Plate thk. 16 mm x 1200 x 2400 mm 1 lembar
9 High tensile bolt & nut dia. 12 mm 112 pcs
10 High tensile bolt & nut dia. 22 mm 56 pcs
11 Fiberglass cladding sheet 60 m2
12 Fiberglass roofing sheet 64 m2
13 Sagroods dia. 12 mm C/W bolt & nut 8 set
14 Bracing mat. MS angle bar 65 x 65 x 6 thk 8 batang
Total
B. Solid Bin
No. Part/Materials QTY OUM Price Remarks
Pekerjaan Pondasi
1 Bowplank 1 lot 8,251,898
2 Galian 0.56 m3 92,813 5 tapak
4 Cor K300 (ready mix) 0.56 m3 1,368,131 5 tapak
5 Bolt & nut M24 x 450 long 20 batang 5 tapak
6 Angle bar 25 x 25 x 3 thk x 6000 mm 2 batang 5 tapak
7 MS Plate thk. 20 mm x 1200 x 2400 mm 1 batang base plate 5 tapak
8 Non shrink grout 0.0153 batang base plate 5 tapak
9 Bekisting /mal 1 lot 4,666,200
Pekerjaan Lantai
1 Galian 15.19 m3 2,506,350 7 x 7.75 m x 280 mm thk. (include wall)
2 Lean batu gunung 12.478 m3 29,438,322 concreate 7 x 7.75 m x 230 mm thk.
3 Lean concreate 2.71 m3 5,533,687 7 x 7.75 m x 50 mm thk.
4 Cor K300 (ready mix) 10.85 m3 26,389,718 7 x 7.75 m x 200 mm thk.
5 BRC A8 2.2m x 6m x 6mm 8 lembar 17,812,571 for 2 layers
6 Besi beton 12 mm x 12 meter (ulir) 7 batang 1,725,188 Hump at entrance
7 Bekisting/Mal 1 lot 5,258,715
Pekerjaan Struktur
1 H Beam 200 x 200 x 50 kg/m 5 batang 5 Column
2 Cor K300 (ready mix) 2.75 m3 6,688,638 5 Column
3 Besi beton 20 mm x 12 meter (ulir) 8 batang 7,104,152 5 Column
4 Besi beton 10 mm x 12 meter (ulir) 10 batang 1,835,570 5 Column
5 SS gutter thk. 1 mm 12 meter rain gutter
6 SS Flat Bar 50x9 Thk. x 6000 mm 6 batang rain gutter
7 Bolt & nut M12 12 pcs rain gutter
8 Channel 152 x 76 x 17.88 kg/m x 6 m (hot dipped galv.) 1 batang rain gutter
9 Pipa PVC 4" x 6 meter 2 batang 666,531
10 Elbow PVC 4", 90 derajat 3 pcs 360,000
11 Elbow PVC 4", 45 derajat 3 pcs 360,000
Pekerjaan Atap
1 H Beam 200 x 200 x 50 kg/m x 6 meter 4.00 batang
2 H Beam 175 x 175 x 40.2 kg/m x 6 meter 5 batang
3 Rectangular Hollow Section 150 x 75 x 19.33 Kg/m x 6 meter 3 batang
4 Square Hollow Section 50 x 50 x 7.56 kg/m x 6 meter 3 batang
5 Fiberglass roofing sheet 90 m2
6 Channel 100 x 50 x 20 x 4.06 kg/m x 6 meter 12 batang
7 MS plate thk. 16 mm x 200 mm x 1100 mm 2 pcs base plate trusses
8 Bolt & nut dia. 22 mm 20 pcs
9 MS Plate bar 12 thk x 200 x 200 mm 24 pcs stiffener
10 Double plate 5 set as drawing
Pekerjaan sum pit 900 x 900 x 600 mm C/W HDG Channel Cover
1 Galian 2.98 m3 490,978 900 x 900 x 600 mm
2 Cor K300 (ready mix) 2.86 m3 6,963,784 900 x 900 x 600 mm
3 Lean concreate 0.1125 m3 229,508 900 x 900 x 600 mm
4 Besi beton 10 mm x 12 meter (ulir) 6 kg 1,101,342 T10-150
5 Bekisting / Mal 1 batang 7,115,955
6 High alumina Cem. Plast. 20 mm thk 2.97 m2
7 HDG Channel cover (900 x 900 mm) as drawing 1 set HDG Channel Face Down
Pekerjaan sum pit 600 x 450 x 375 mm C/W HDG Grating Cover
1 Galian 0.41 m3 66,825 sum pit 600 x 450 x 375 mm
2 Cor K300 (ready mix) 0.22 m3 533,571 sum pit 600 x 450 x 375 mm
3 Lean concreate 0.03 m3 68,852 sum pit 600 x 450 x 375 mm
4 Besi beton 10 mm x 12 meter (ulir) 6 batang 1,055,453 T10-150
5 Bekisting / Mal 1 Lot 4,977,280
6 High alumina Cem. Plast. 20 mm thk 1.1475 m2
7 HDG grating cover detail 600 x 450 mm (as drawing) 1 set
Total
Civil Material
1 Cor K300 (ready mix) 22.0 m3 53,509,105
2 Besi beton 6 mm x 12 meter (ulir) 15 batang 1,763,636
3 BRC A6 2.2m x 6m x 6mm 33 lembar 2 layers
4 Bekesting / Mal 1 Lot
5 Timbunan 21.62 m3 14,073,269
Inclined Ladder
1 Ornamental pipe dia. 32 mm x 6 meter 2 batang Handrail of ladder
2 Black pipe dia. 32 mm x 6 meter 2 batang Handrail of ladder
3 Black pipe dia. 25 mm x 6 meter 2 batang Handrail of ladder
4 Ornamental elbow 90 derajat dia. 32 mm 4 pcs Handrail of ladder
5 Steam elbow 90 derajat dia. 25 mm 4 pcs Handrail of ladder
6 C Channel 150 x 75 x 18.6 kg/m x 6 meter 1 batang ladder
7 Bolt & Nut 18 mm x 1" c/w washer 10 pcs ladder
8 MS flat bar thk. 6 mm x 100 mm x 6 meter 2 batang Kicker plate
9 Checquered plate thk. 6 mm x 1200 mm x 2400 mm 1 lembar tangga
10 MS flat bar thk. 6 mm x 75 mm x 6 meter 1 batang Handrail platform
11 Bolt & Nut 1/2" x 1" c/w washer (Chemichal Bolt) 8 pcs Handrail platform
Total
Cyclone piping
1 Butterfly valve CI body size 4 inch C/W bolt & nut 3 pcs
2 SS flange JIS 10K size 4 inch 6 pcs
3 SS pipe 4 inch x 6 meter sch 10 1 batang
4 Black pipe 4 inch x 6 meter sch 20 1 batang
Pit piping
1 HDPE pipe 4 inch x 6 meter PN12 5 batang
2 HDPE stud end 4 inch 4 pcs
3 Butterfly valve CI body size 4 inch C/W bolt & nut 2 pcs
4 MS Flange 4 inch JIS 10K 4 pcs
5 HDPE elbow 4 inch 90 deg 4 pcs
Total
G. Others
No. Descriptions QTY OUM Remarks
1 Upah Kerja 1 lot building & mechanical work
2 Consumable Material 1 lot
3 Mobilisasi dan Demobilisasi 1 lot
4 Pemasangan mesin belt press, tangki, pump, conveyor & piping 1 lot
5 Finishing & commissioning 1 lot
Total
H. Painting
No. Descriptions QTY OUM Remarks
1 Nippon zink phospate primer-Grey Green 50 liter Primer/base coat for all Mechanical
2 Cat tembok Nippon MIO-silver 20 liter Building steel structure
4 Cat Nippon 9000 Gloss Finish - Papier grey (1139) 20 liter Platform (top) & kicker plate
5 Thinner 50 liter
Total
Note :
- Cat primer/base coat = 1 layer
- Cat finishing/top coat = 2 layer
ANALISA HARGA SATUAN PEKERJAAN
E PROFIT 10%
F TOTAL HARGA (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 125,000
Tukang kayu L.02 OH 0.100 187,500
Kepala tukang L.03 OH 0.010 250,000
Mandor L.04 OH 0.005 312,500
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 m3 0.012 7,500,000
Paku 2" - 3" Kg 0.020 40,000
Kayu papan 3/20 m3 0.007 7,500,000
JUMLAH HARGA BAHAN
C PERALATAN
E PROFIT 10%
F TOTAL HARGA (D+E)
E PROFIT 10%
F TOTAL HARGA (D+E)
A. 4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K100)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.200 125,000
Tukang batu L.02 OH 0.200 187,500
Kepala tukang L.03 OH 0.020 250,000
Mandor L.04 OH 0.060 312,500
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 230 2,125
Pasir beton Kg 893 536
Kerikil (maks 30 mm) Kg 1027 590
Air Liter 200 350
JUMLAH HARGA BAHAN
C PERALATAN
E PROFIT 10%
F TOTAL HARGA (D+E)
A. 4.1.1.5 Membuat 1 m3 beton mutu f'c = 14,5 MPa, slump (120 ± 20) mm (K175)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 125,000
Tukang batu L.02 OH 0.275 187,500
Kepala tukang L.03 OH 0.028 250,000
Mandor L.04 OH 0.083 312,500
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 326.000 2,125
Pasir beton Kg 760.000 536
Kerikil (maks 30 mm) Kg 1029.000 590
Air Liter 215.000 350
JUMLAH HARGA BAHAN
C PERALATAN
E PROFIT 10%
F TOTAL HARGA (D+E)
E PROFIT 10%
F TOTAL HARGA (D+E)
E PROFIT 10%
F TOTAL HARGA (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.520 125,000
Tukang kayu L.02 OH 0.260 187,500
Kepala tukang L.03 OH 0.026 250,000
Mandor L.04 OH 0.026 312,500
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040 7,500,000
Paku 5 cm - 10 cm Kg 0.300 35,000
Minyak bekisting Liter 0.100 30,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E PROFIT 10%
F TOTAL HARGA (D+E)
E PROFIT 10%
F TOTAL HARGA (D+E)
E PROFIT 10%
F TOTAL HARGA (D+E)
E PROFIT 10%
F TOTAL HARGA (D+E)
E PROFIT 10%
F TOTAL HARGA (D+E)
A. 4.4.1.3 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.600 125,000
Tukang batu L.02 OH 0.200 187,500
Kepala tukang L.03 OH 0.020 250,000
Mandor L.04 OH 0.030 312,500
JUMLAH TENAGA KERJA
B BAHAN
Bata merah Bh 140.000 1,125
Semen portland Kg 26.550 2,125
Pasir pasang m 3
0.093 750,000
JUMLAH HARGA BAHAN
C PERALATAN
E PROFIT 10%
F TOTAL HARGA (D+E)
E PROFIT 10%
F TOTAL HARGA (D+E)
E PROFIT 10%
F TOTAL HARGA (D+E)
E PROFIT 10%
F TOTAL HARGA (D+E)
AAN
Rp 12,500
Rp 15,625
Rp 28,125
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 28,125
Rp 2,813
Rp 30,938
Rp 12,500
Rp 18,750
Rp 2,500
Rp 1,563
Rp 35,313
Rp 90,000
Rp 800
Rp 52,500
Rp 143,300
Rp -
Rp -
Rp -
Rp 178,613
Rp 17,861
Rp 196,474
Rp 138,469
Rp 11,531
Rp 150,000
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 150,000
Rp 15,000
Rp 165,000
Rp 62,500
Rp 15,625
Rp 78,125
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 78,125
Rp 7,813
Rp 85,938
Jumlah Harga (Rp)
Rp 187,500
Rp 140,625
Rp 18,750
Rp 23,438
Rp 370,313
Rp 1,275,000
Rp 306,000
Rp 408,000
Rp 1,989,000
Rp -
Rp -
Rp -
Rp 2,359,313
Rp 150,000
Rp 37,500
Rp 5,000
Rp 18,750
Rp 211,250
Rp 488,750
Rp 478,393
Rp 606,215
Rp 70,000
Rp 1,643,358
Rp -
Rp -
Rp -
Rp 1,854,608
Rp 185,461
Rp 2,040,069
Jumlah Harga (Rp)
Rp 206,250
Rp 51,563
Rp 7,000
Rp 25,938
Rp 290,750
Rp 692,750
Rp 407,143
Rp 607,396
Rp 75,250
Rp 1,782,539
Rp -
Rp -
Rp -
Rp 2,073,289
Rp 207,329
Rp 2,280,618
Rp 206,250
Rp 51,563
Rp 7,000
Rp 25,938
Rp 290,750
Rp 788,375 106,250
Rp 373,929 750,000
Rp 618,021 1,062,500
Rp 75,250
Rp 1,855,574
Rp -
Rp -
Rp -
Rp 2,146,324
Rp 214,632
Rp 2,360,957
Rp 206,250
Rp 51,563
Rp 7,000
Rp 25,938
Rp 290,750
Rp 877,625
Rp 364,821
Rp 602,674
Rp 75,250
Rp 1,920,370
Rp -
Rp -
Rp -
Rp 2,211,120
Rp 221,112
Rp 2,432,232
Rp 65,000
Rp 48,750
Rp 6,500
Rp 8,125
Rp 128,375
Rp 300,000
Rp 10,500
Rp 3,000
Rp 313,500
Rp -
Rp -
Rp -
Rp 441,875
Rp 44,188
Rp 486,063
Rp 82,500
Rp 61,875
Rp 8,250
Rp 10,313
Rp 162,938
Rp 300,000
Rp 14,000
Rp 6,000
Rp 127,500
Rp 33,250
Rp 210,000
Rp 690,750
Rp -
Rp -
Rp -
Rp 853,688
Rp 85,369
Rp 939,056
Rp 82,500
Rp 61,875
Rp 8,250
Rp 10,313
Rp 162,938
Rp 196,080
Rp 7,200
Rp 4,600
Rp 147,060
Rp 82,600
Rp 40,000
Rp 477,540
Rp -
Rp -
Rp -
Rp 640,478
Rp 64,048
Rp 704,525
Rp 8,750
Rp 13,125
Rp 1,750
Rp 1,250
Rp 24,875
Rp 196,875
Rp 3,750
Rp 200,625
Rp -
Rp -
Rp -
Rp 225,500
Rp 22,550
Rp 2,255
Rp 24,805
Rp 3,125
Rp 4,688
Rp 500
Rp 313
Rp 8,625
Rp 22,008
Rp 1,250
Rp 23,258
Rp -
Rp -
Rp -
Rp 31,883
Rp 3,188
Rp 35,071
Rp 75,000
Rp 37,500
Rp 5,000
Rp 9,375
Rp 126,875
Rp 157,500
Rp 56,419
Rp 69,750
Rp 283,669
Rp -
Rp -
Rp -
Rp 410,544
Rp 41,054
Rp 451,598
Rp 37,500
Rp 28,125
Rp 3,750
Rp 4,688
Rp 74,063
Rp 13,260
Rp 18,000
Rp 31,260
Rp -
Rp -
Rp -
Rp 105,323
Rp 10,532
Rp 115,855
Rp 25,000
Rp 18,750
Rp 2,500
Rp 3,125
Rp 49,375
Rp 6,906
Rp 6,906
Rp -
Rp -
Rp -
Rp 56,281
Rp 5,628
Rp 61,909
Rp 10,125
Rp 25,313
Rp 33,750
Rp 1,281
Rp 70,469
Rp 180,000
Rp 52,500
Rp 232,500
Rp -
Rp -
Rp -
Rp 302,969
Rp 30,297
Rp 333,266
.