Road
N
Wall
halt Ro
N
Road
A
Asphalt
400 thick
i Main
sp
Pipe Culvert
Wide A
A
W E
W E No of Pipe : 3
Dia :600mm
ide
ad
Pipe Top: 871.054
30.0m
7.0m W
Pipe Bottom: 870.234
Mag
S Nala Bottom: 869.854
Size = 11.8 x 6.8
400 thick wall
S 450 thk wall W1
W2
W1 B9
B10
5
C1 .454
7 4
F F 8
W4
6
C1 .354
3 Lake inside Bajaj Land
87
B1
Key plan to be changed
Check the Hatch THIS UNIT
ad
halt Ro
300 thick wall
ide Asp
300 thk wall W5
E E
400 thick wall
7.0m W
300 thick wall
Wall
d Drain
B2
600 thick slab
Covere
B3
6000 thick wall W1
B8
Fence
FINISHING SPECIFICATION SCHEDULE:-
Ullal
7
C1 .454
KEY PLAN: 8 7 2
D D
NOTE:
1. ALL DIMENSIONS ARE IN MM & LEVELS ARE IN METERS.
2. REFER SEPARATE DRAWINGS FOR CIVIL, ELECTRICAL DETAILS.
3. STAIRCASE DETAILS SHALL BE AS PER CIVIL DRAWING.
4. FORCED VENTILATION WILL BE PROVIDED AS PER VENDOR DETAILS
AND ALSO VENTILATION CALCULATION WILL BE SUBMITTED.
Cable trench on HOLD 5. MECHANICAL EQUIPMENT AND FOUNDATION DETAILS ARE UNDER HOLD.
6. ROOF DRAIN SHALL BE SHOWN IN CIVIL GA DRAWING.
7. PRECAST SLAB DESIGN AND DIMENSIONS WILL BE FINALIZED IN
CIVIL GA DRAWING.
W6 8. CO-ORDINATES SHALL BE FOLLOWED AS PER MECHANICAL GA
DRAWING AND SAME WILL BE UPDATED IN PLANT LAYOUT LATER.
W6
LEGEND:
WL - WATER LEVEL
RL - REDUCED LEVEL
TL - TOP LEVEL
W6 IL - INVERT LEVEL
BOP- BOTTOM OF PIPE
FGL- FINISHED GROUND LEVEL
update the plan as per the comments given on plan @875.00level TOW- TOP OF WEIR
PBS- PUSH BUTTON STATION
BOO- BOTTOM OF OPENING
A
EGL- EXISTING GROUND LEVEL
BL- BOTTEM LEVEL
FFL- FINISH FLOOR LEVEL
875.00 BOB- BOTTOM OF BEAM
the contract and Indian Statutory Laws nor does it limit the Employer’s
right under the contract.
CLIENT:
BANGALORE WATER SUPPLY
AND SEWERAGE BOARD (BWSSB)
Infra Projects Private Ltd.) Sewage Pumping Stations with Operation & Maintenance thereof for NJS NJS Engineers India Pvt. Ltd.,
SIZE SCALE DATE REV.
Revised due to change in incoming No.1, 1st Floor, 8th Cross Seven Years [Works - A] and
01 31.01.2024 SR SW KNV AIP A1 1:50 19.11.2022
Sewer Levels & Client Comments Tatanagar, Balaji Layout, 02
Procurement and Construction of Main Sewers including Manholes in TATA Consulting Engineers Ltd.,
00 19.11.2022 SR SW KNV Submitted for approval RMV Extenstion, 2nd Stage, This drawing is the property of KBR-AIPPL-JV and must not be passed on to any person
Bengaluru- 560 094. Dasarahalli and R R Nagar Zones (V Valley Catchment) [Works – B] or body not authorised by us to receive it nor be copied or otherwise made use either in
REV DATE PREPARED BY CHECKED BY VALIDATED BY DESCRIPTION
In Association With Black & Veatch
(Contract Package – BWSSP (III) /JICA/CP-27) full or in part by such person or body without our prior permission in writing.