Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ad

Road
N

Wall
halt Ro
N

Road
A

Asphalt
400 thick

i Main
sp
Pipe Culvert

Wide A
A
W E
W E No of Pipe : 3
Dia :600mm

ide
ad
Pipe Top: 871.054

30.0m

7.0m W
Pipe Bottom: 870.234

Mag
S Nala Bottom: 869.854
Size = 11.8 x 6.8
400 thick wall
S 450 thk wall W1
W2
W1 B9
B10
5
C1 .454
7 4
F F 8
W4

6
C1 .354
3 Lake inside Bajaj Land
87

B1
Key plan to be changed
Check the Hatch THIS UNIT

ad
halt Ro
300 thick wall

ide Asp
300 thk wall W5
E E
400 thick wall

7.0m W
300 thick wall

Wall

d Drain
B2
600 thick slab

Covere
B3
6000 thick wall W1

B8

Fence
FINISHING SPECIFICATION SCHEDULE:-

Ullal
7
C1 .454
KEY PLAN: 8 7 2

D D
NOTE:
1. ALL DIMENSIONS ARE IN MM & LEVELS ARE IN METERS.
2. REFER SEPARATE DRAWINGS FOR CIVIL, ELECTRICAL DETAILS.
3. STAIRCASE DETAILS SHALL BE AS PER CIVIL DRAWING.
4. FORCED VENTILATION WILL BE PROVIDED AS PER VENDOR DETAILS
AND ALSO VENTILATION CALCULATION WILL BE SUBMITTED.
Cable trench on HOLD 5. MECHANICAL EQUIPMENT AND FOUNDATION DETAILS ARE UNDER HOLD.
6. ROOF DRAIN SHALL BE SHOWN IN CIVIL GA DRAWING.
7. PRECAST SLAB DESIGN AND DIMENSIONS WILL BE FINALIZED IN
CIVIL GA DRAWING.
W6 8. CO-ORDINATES SHALL BE FOLLOWED AS PER MECHANICAL GA
DRAWING AND SAME WILL BE UPDATED IN PLANT LAYOUT LATER.

W6
LEGEND:
WL - WATER LEVEL
RL - REDUCED LEVEL
TL - TOP LEVEL
W6 IL - INVERT LEVEL
BOP- BOTTOM OF PIPE
FGL- FINISHED GROUND LEVEL
update the plan as per the comments given on plan @875.00level TOW- TOP OF WEIR
PBS- PUSH BUTTON STATION
BOO- BOTTOM OF OPENING

A
EGL- EXISTING GROUND LEVEL
BL- BOTTEM LEVEL
FFL- FINISH FLOOR LEVEL
875.00 BOB- BOTTOM OF BEAM

3 BWSSP III/27/RRN/ISPS/HER/PR/DG/2004 HYDRAULIC FLOW DIAGRAM


SCHEDULE OF COLUMN:-
2 BWSSP III/27/RRN/ISPS/HER/PR/DG/2006 PIPING & INSTRUMENT DIAGRAM
COLUMN SIZE
1 BWSSP III/27/RRN/ISPS/HER/PR/DC/2005 PLANT LAYOUT
Modify as per recent comments
COLUMN NAME NO. OF COLUMN
L (mm) B (mm)
SL. DRAWING No. DRAWING TITLE
C1 2 400 400
No.
C2 4 400 400
REFERENCE DRAWINGS
C3 2 300 300

Check the Hatch ONTB / BWSSB


DRAWING / DOCUMENT REVIEW STATUS
Date of Receipt: …………………
A. Approved, manufacture / construction may commence.
B. Acceptable subject to changes indicated, resubmit for approval but
C C manufacture / construction may commence.
C. Amend as per the comments indicated and resubmit for approval.
D. Comments noted in letter/memo attached to forwarding transmittal
Remove this detail Nr …………… dated ……….. Amend as comments indicated
resubmit for approval.
E. Amend as comments indicated resubmit for record.
F. Comments noted in letter/memo attached to forwarding
transmittal Nr Amend as comments indicated resubmit for
G. Drawing of this category is for information and hence not required to
be approved.
H. Return without review.
Approval of drawings / documents does not absolve Contractor /
Vendor from any responsibilities for their accuracy or for the design,
Please check the levels and dimensions performance and safety of the Plant / Works or any obligations under
A

the contract and Indian Statutory Laws nor does it limit the Employer’s
right under the contract.

For ONTB For BWSSB


Verified by Checked by Reviewed by Approved by

please follow as per our mechanical PD-1 details

DTL EE(PROJECTS)-1 ACE(PROJECTS)-1 CE(PROJECTS)


Date: Date: Date: Date:

CLIENT:
BANGALORE WATER SUPPLY
AND SEWERAGE BOARD (BWSSB)

TITLE : 0.5 MLD ISPS AT HEROHALLI


MECHANICAL GA DRAWING OF RECEIVING CHAMBER
AND COARSE SCREEN , WET WELL AND PUMPING
STATION & FLOWMETER CHAMBER
(SHEET-01 OF 05)
CONTRACTOR: PROJECT: CONSULTANTS:
KBR-AIPPL-JV Sewerage Facilities to 110 Villages: Design, Engineering, Construction
Oriental Consultants Global Co. Ltd., DOC.NO : BWSSP III/27/RRN/ISPS/HER/ME/DG/3201
(M/s KBR Infratech Limited and M/s Ayyappa and Commissioning of Sewage Treatment Plants and Intermediate OC GLOBAL
02 31.01.2024 Revised as per Client Comments
SR SW KNV KBR R

Infra Projects Private Ltd.) Sewage Pumping Stations with Operation & Maintenance thereof for NJS NJS Engineers India Pvt. Ltd.,
SIZE SCALE DATE REV.
Revised due to change in incoming No.1, 1st Floor, 8th Cross Seven Years [Works - A] and
01 31.01.2024 SR SW KNV AIP A1 1:50 19.11.2022
Sewer Levels & Client Comments Tatanagar, Balaji Layout, 02
Procurement and Construction of Main Sewers including Manholes in TATA Consulting Engineers Ltd.,
00 19.11.2022 SR SW KNV Submitted for approval RMV Extenstion, 2nd Stage, This drawing is the property of KBR-AIPPL-JV and must not be passed on to any person
Bengaluru- 560 094. Dasarahalli and R R Nagar Zones (V Valley Catchment) [Works – B] or body not authorised by us to receive it nor be copied or otherwise made use either in
REV DATE PREPARED BY CHECKED BY VALIDATED BY DESCRIPTION
In Association With Black & Veatch
(Contract Package – BWSSP (III) /JICA/CP-27) full or in part by such person or body without our prior permission in writing.

You might also like