SPECIFICATIONS
TECHNICAL
SPECIFICATIONS
I. DEMOLITION WORKS
I.a. Removal of Existing Dry Wall
II. EARTHWORKS
II.a. Gravel Base
III. CONCRETE WORKS
IV. REINFORCEMENT BARS
V. MASONRY WORKS
V.a. CHB Filler
V.b. CHB Plastering
VI. ROOFING WORKS
VII. DOORS AND WINDOWS
VII.a. Doors
VII.b. Windows
VIII. CARPENTRY WORKS
VIII.a. Ceiling
IX. TILE WORKS
X.PLUMBING WORKS
XI. PAINTING WORKS
XII. GENERAL REQUIREMENTS
XII.a. Project Billboard
XII.b. Brass Marker
XIII. PPE's AND INFORMATIVE SIGNAGES
Reflective Vest
Hard Hat
Informative Signages
1. GENERAL REQUIREMENTS
The location of the Site is as shown on the Drawings. The Contractor shall
be deemed to have inspected the Site before tendering and to consider
all the conditions there, such as means of access, facilities for transport,
storage and movement of plants and materials, and any other
contingencies liable to affect his tender price, as no claim for extra
payment in this connection will be entertained.
The Contractor shall be liable for and shall indemnify the Procuring Entity
against any damage, expense, liability, loss, claim or proceedings
whatsoever whether arising at common law or by statute in respect of
personnel injury to or death of any person whomsoever or to any property
arising out of or in the course of or by reason of the visit to the Site.
1.4 PERMITS
The Contractor shall comply with the minimum requirements set under
the Department of Labor and Employment (DOLE), Department Order
(D.O.) No. 13 Series of 1998 – Guidelines Governing Occupational Safety
and Health in the Construction Industry.
The Contractor shall provide and maintain at least twenty (20) units of
barricades at any time in the construction. These will serve as warning
signs to ensure the safety of the motorists and pedestrians during day
and night in the implementation.
If applicable only, ensure that our ongoing implementation will not hinder
and cause any traffic jam.
NOT APPLICABLE
a. All materials furnished, and all work performed under the Contract
shall be subject to the inspection by the CNSPMC Chairperson or his
representative, an Auditor and a representative from the
Engineering and Construction Department in charge of the Design
and Specification. Such inspection includes mill, plant, shop, or field
inspection as required. The inspectorate team shall be permitted to
access all parts of the work, including plants where materials or
equipment are manufactured or fabricated; and they shall be
furnished with such materials, information and assistance by the
Contractor and suppliers as required to make a complete and
detailed inspection.
c. The cost of carrying out the required inspections and tests such as
factory tests for materials and equipment to be delivered under the
Contract and test for all materials and equipment after installation
should be at the Contractor’s expense under their normal
contractual obligations. Whenever the place of plant and materials
inspection is outside Municipality where an accommodation of the
inspectorate team is necessary, the Contractor shall bear all the
expenses to be incurred in the conduct of the inspection. As part of
the Contractor’s contractual obligation the following coverage of
travel expenses shall be provided for the inspectors:
1. Hotel Accommodations
All delays and stoppages in the progress of the Work arising from disputes
as to the quantity of materials, the insufficient supply of materials, plants,
etc. and all damage or injury caused to the work of the Contract, or to the
adjoining or adjacent works, buildings, streets, land, etc., in consequence
of such delays and stoppages shall be solely and entirely at the risk and
cost of the Contractor.
2.1 EARTHWORKS
2.1.1 SCOPE
1. Clearing and grubbing of the project area and its environs as indicated in the
plans or as directed by the MLGU Engineer shall be implemented in accordance
with the following:
Work under this item shall consist of the removal wholly or in part
and its appropriate disposal of existing or abandoned structures,
and other permanent structures located within the project site or
that may pose hazard, obstruct the work or as shown on the plans
and/or directed by the MLGU Engineer. This includes the
corresponding back filling of holes and pits as a result of the work
under this item. Other issues that need to be addressed are as
follows:
B. SITE CLEARING
The Contractor shall remove and dispose off trees and bushes within
the site of the Works as and wherever directed by the CNSPMC
Chairperson. However, all trees and bushes within 2 meters of either
side of all structures in the Contract shall be removed and disposed
off. Site clearing shall include clearing, grubbing, demolishing,
breaking up and removing all trees, shrubs, vegetation, stumps, and
structures such as walls, fences and other obstruction within the Site
except those which have been designated to be retained. Materials
suitable for disposal shall be disposed in municipal’s designated
dumpsites. The costs for the transportation of the same to dumpsites
shall be borne by the Contractor and should be considered in their bid
proposal. It is the responsibility of the Contractor to visit the site and
orient himself of the possible dumping areas.
C. LAY - OUT
D. STRUCTURAL EXCAVATION
Work under this item shall include the required excavation for the
foundation of column footing foundation, wall footing and septic
tanks and other structures that requires excavation of foundation as
indicated in the approved plans. This includes the backfilling of
completed structures and the disposal of the excess or surplus
excavated materials in conformity with the approved plans. N
f. In areas where the foundation hit a rock section, the rock section
shall be leveled off so that it will not create a lever that will endanger
the structural quality of the structure when in place.
g. Any excess of backfilling materials that will reduce the thickness of the
concrete slab of the pavement shall be scrubbed and removed.
After earthworks have been completed, the whole building area including
an area five meters from the perimeter of the building shall be treated with
an anti-termite solution to ensure that the wood structures installed and fix
will not be damaged due to termite infestations.
This Item shall refer to a pavement made of Portland Cement Concrete, with or
without reinforcement, constructed on the prepared base in accordance with this
Specification and in conformity with lines, grades, thickness and typical cross-
Gravel bedding, sand and gravel for concrete must be free from dirt and must be
washed in accordance with the minimum standard. And spacing and sizes of the
reinforcing steel bars, concrete hollow blocks must be referred to the approved
detailed engineering plan.
1. Preparatory Works:
c. Materials such as; cement, sand, gravel and water proofing materials
where necessary are available and more than sufficient. Sand and gravel
are deposited near the batching area.
d. Concrete mixers, vibrators and engine to run the concrete mixer are
running and in good condition. Spare engines and concrete vibrators are
available.
e. Plans for concrete pouring are available and contingency plans are in
place.
f. Worker’s areas for beams, girders and concrete floor slab are properly
fixed so that fresh concrete nor green concrete will not be jarred or
disturbed during concrete work operation.
g. Skilled and unskilled workers are ready and substitute workers are also
ready when required.
c. Steel reinforcements shall be fixed using G.I. tie wire and shall be space
in accordance with the approved plans. All steel reinforcement to be used
shall have passed quality tests. Otherwise, steel reinforcements already fixed
shall be removed and shall be substituted with a similar type; grade and size
which material sample has passed the required test.
the slab forms. Remnants of the rust shall be swept, broom or suction by air
cleaner.
3. Pipes embedment
a. All pipes that are required to be embedded on the ground, concrete slab
and CHB walls shall be properly cut in a length as shown on the plan.
4. Forms Works
b. Wooden Forms for slabs, walls, columns, girders, beams and other
concrete structures shall be cut into sizes that when fixed will not protrude
nor be nuisance during concrete pouring.
c. On concrete walls one side of the forms shall be fixed first, while the
other side form shall only be fixed when steel reinforcements have been
attached and fixed. Concrete spacers shall be attached to the steel bars
prior to the fixing of the forms and shall be properly adjusted ones the other
opposite forms are about to be fixed. This is true with beams, girders and
columns. For roof slab, concrete spacers shall be attached when all the
reinforcements have been fixed.
b. For concrete pouring with forms, all sides of the forms that will be in
contact with fresh concrete shall be moist with water.
c. Concrete works shall start as early as possible during the day to prevent
excessive moisture loss in concrete during noon time when the heat of the
sun is at its peak.
f. In batching concrete mix, the first to enter the drums is the water of
about 75% of its requirement, followed by gravel, then sand and the last
to enter the drum will be cement. Water, sand, gravel and cement shall
enter the drum while the drum is revolving. Where waterproofing is
required, this type of material shall enter the drum last. The remaining 25%
of water requirement shall be added into the drum after the cement has
been deposited.
h. For the first batch of concrete mix for the day, the quantity of water to
be provided shall be more than the normal requirement.
l. Once the concrete mix has been deposited in its final position it shall be
properly consolidated by means of concrete vibrator in accordance with the
project requirement to achieve a watertight concrete mix.
n. Concrete mix shall not be over vibrated as its grout tends to surface
leaving the underneath with sand and gravel only.
q. Tapping the forms where green concrete mixes are located shall not be
allowed. Tapping the forms shall only be made at the early stages of
concrete pouring
b. Except for concrete slab under water. Foundations and walls shall be
provided with forms. Forms shall ensure that it will not burst when poured
with concrete mix.
7. Concrete finishes
a. For concrete that will receive another batch of concrete mix and is
continuation from the previously poured concrete, its surfaces shall be
roughen and concrete keys shall be provided to ensure bonding of the old
and new concrete. Prior to the concrete pouring of a new concrete mix to
the structure connecting the old structure, the old concrete shall be
provided with a rich grout of cement or any appropriate cement bonding
material.
b. Concrete surface shall be plain finish and shall not be roughen to receive
mortar plastering.
b. For walls, beams, girders, columns and concrete walls shall be rubbed
and shall be smoothen. No concrete surface shall be plastered with
cement mortar.
a. A day after concrete pouring, fresh concrete shall be drenched with water
or provided with curing compounds. All other concrete structures shall be
continuously sprayed with water for 14 days.
b. Forms and from works shall not be released from under any concrete
structures without first determining if the concrete has gained adequate
strength.
c. Underside slab forms, bottom of girders, beams and arches shall only be
removed after 21 days and shall be provided with supports. Sides forms of
walls and columns shall be removed after 2 days and sides forms of beams
and other concrete surfaces shall be removed after 1 day.
C. Masonry Works
1. Ensure that CHB delivered to the project site are of correct dimensions and their
thicknesses are the same.
2. Ensure that representative samples of the CHB have passed its quality tests.
3. During the concrete pouring of the footing foundation for CHB, vertical
reinforcements are in place and anchored in the footing foundation
reinforcements. These shall be located in accordance with the approved plans.
4. Vertical wooden stakes to tie strings that will provide level guide in the lying
and fixing of CHB shall be established. Wooden stake shall be marked on the levels
of every lift of CHB.
5. In the first layer of lying and fixing CHB, cement mortar shall be applied on the
top section of the footing foundation. These shall be spread evenly on the surface
of the footing foundation to ensure that top sections of the CHB have the same
Level.
6. Once the CHB is installed and leveled, cement mortar shall be deposited on the
holes of the CHB. Cement mortar shall be consolidated by tamping to ensure that
the holes are filled.
7. Lying and Fixing of CHB shall be performed evenly throughout the wall section
where masonry work is required. Lifting of CHB above one or more layers ahead
of the other, shall not be allowed as bond between the old and new mortar will
not be achieved. This will result in wall cracks.
8. Lifting of CHB layer shall be performed evenly by providing cement mortar over
the top section of the CHB laid. Lying shall be carried out taking into consideration
the top level of the CHB being fixed. Cement mortar shall again be provided to the
holes of the CHB until it is completely filled.
9. This process shall be repeated until the lying and fixing of CHB reach the bottom
of the girt or beam. Upon reaching the near bottom of the girt or beam, vertical
reinforcements shall be tied and anchor properly to the girt or beam.
10. On windows and doors openings, reinforced window sills and door jambs shall
be provided and no further lying or fixing of CHB unless the window sills and door
jambs have been constructed. Installation of Doors and Windows shall only be
carried out when desired concrete strength of window sill and door jambs have
been reached.
11. Surfaces of CHB shall be plastered with cement plaster. The CHB surface to be
applied shall be thoroughly sprayed with water to ensure that voids of the CHB will
be filled with plaster grout. Cement plaster shall be planned so that its surface will
be smooth. Sand to be used on this process shall be pure sand and no impurities
are mixed that will endanger the quality of cement plaster and the work.
12. Curing of the wall area where cement plaster has been applied shall start
immediately when the cement plaster hardened. This shall be carried out by
spraying water to the surface of cement plaster. In any irregularities and cracks
on cement plastered CHB walls shall be removed and rework.
a. All structural steel frames, shapes and other structural steel materials to be
used in the works shall have tread mill certificates and its properties shall be equal
or more than the required properties of the structural steel materials required by
the Project.
b. When delivered to the project site, the structural steel materials shall be stored
in an area where it safe from adverse effects of the weather. If possible, the
materials shall be covered with tarpaulin.
c. Structural steel materials when stored shall not rest on the ground that its
bottom section will be corroded. When provided with supports, ensure that the
bottom section of the structural steel material will not be deformed.
d. Prior to its use, structural steel materials shall be properly inspected to ensure
that:
1. Structural steel materials are not corroded that will reduce its strength
and quality.
2. Structural steel materials are straight and not bend unless otherwise
such, is fabricated to be bended or deflected as the case maybe.
e. Rusts that are visible on the surface of the structural steel material shall be
brush and clean. In cases where rusts have penetrated the whole of the structural
frames or shapes, such structural steel materials shall be rejected and removed
from the site. Splicing such sections of the frames or shape through welding in any
form shall not be allowed.
f. Unless specified in the plan, splicing of structural steel materials such shapes
and frames shall not be tolerated.
h. In the installation of structural steel for rafters, vertical support shall be provided
to ensure its firmness during the fixing of the bolts of plate connector for the two
opposing rafters.
i. This support shall only be removed after the bolts of the connector for the two
opposing rafters have been tightened, secured and completed.
j. In the installation of rafters, splicing or jointing with plate connectors shall not
be permitted.
k. At the edge of the top of the perimeter wall of the building structural steel rafter
shall be anchored on top of the concrete beam with a pair of anchor plate positions
in such a way to receive the structural steel rafter in between. Once the structural
steel rafter is positioned in between the pair of anchor plates this shall be
connected by a bolt that will lock the structural steel rafter. Welding of the pair of
anchor bolts shall not be permitted as this is one of the causes of failure why the
entire roof of buildings was blown off during typhoons.
l. Structural steel purlins shall be connected to the structural steel rafter by U-bolt
or flat bar that is fastened at the bottom of the rafters through bolts. Welding to
connect between the structural purlins and structural rafter shall not be allowed.
m. Structural steel materials to be used as window sills and door jambs shall be
installed plumb straight and level. Deformed and/or structurally defective
structural steel shall not be used for window sills and door jambs.
E. Roofing Works
a. All roofing materials to be used in the works shall be made of Galvanize Iron
(G.I) sheets with a minimum thickness of 0.40mm thk. Pre-painted High Rib-Type
Roofing (Baguio Green) for the roofing. Must give emphasis to the thickness, it
must be followed or higher specifications must be used same with the ridge roll
(0.40mm thk. Pre-painted Ridge Roll, Baguio Green).
b. G.I. sheets material to be used and installed shall be of the type, gauge, and
size as indicated in the plan. Material samples shall be properly tested and shall
conform to project requirements.
c. Generally, installation of G.I. roofing sheet shall start from the edge of the
building and to terminate at the other end of the building along its longitudinal
section. Side overlaps shall be in accordance with plan or as directed by the MLGU
Engineer. In cases where transverse length is more than what is required,
reduction of its length shall be made at the last roofing sheet.
d. Using G.I. roofing sheets of two lengths, installation along the longitudinal
section shall also start from one edge of the building and to terminate at the other
end of the building. On the transverse section of the building, installation of G.I.
roofing sheets shall be from the top section of the rafter or truss moving down
towards the lower edge of the roof. Lap distance of G.I. sheets shall be observed
and shall be in accordance with the approved plan.
e. In areas where typhoons commonly occur, G.I. sheets shall be fastened using
U-bolts. Location of U-bolts shall be diagonal in relation to the location of the
structural steel purlins. These locations are bored through drilling after which U-
bolts are inserted and fixed at the bottom of the purlins. Bolts shall be properly
tightened to prevent unnecessary movement that will result in loosening of the
G.I. roofing materials. Holes created by the installation of U-bolts shall be provided
with roofing epoxy to prevent intrusion of rain waters.
g. Any irregularity on the surface of the ceiling shall be rework and in a pristine
condition.
When provided in the plan, timber and carpentry works in small-scale community
infrastructures such as school buildings and other related structures shall be for truss,
rafter, purlins, girt, door jambs, window sills, windows, doors and others that require
timber or wood materials. Wooden chairs are not part of this type of work. Timber and
carpentry works shall be carried out under the following:
1. Timbers and woods to be used in works shall be of strong and sound wood
materials, free from any form of decay, insect infestation, knots and does not show
signs of warp, cracks or split sections and shall not be twisted and deflect in
formation. Timber or wood that have this kind of physical properties shall be
rejected and removed from the project site.
2. Timber or woods to be used shall be air -dried so that shrinkage will not occur
when installed and used. These materials shall not be exposed to sunlight or rain
Waters.
3. Prior to the use of timber and wood materials in truss systems, these shall be
trimmed but not totally cleaned. While for wood or timber to be used in window
sills, door jambs, supports and braces for partition and ceiling boards shall be
trimmed and cleaned.
4. All timber and wood to be used shall be treated with an anti-termite solution to
protect from termite infestation.
6. All timber or lumber when fixed shall be firm and no movement or buckling is
noticeable.
These are the sizes of the trusses, refer to the approved detailed engineering
design for the formation, spacing and other necessary details.
Toilets shall be attached to the building for easy access for the end-user. Door for toilets
shall be of PVC material to make it more durable. Inside the toilet are the toilet bowl and
wash basin. Floor shall be of concrete slab with plain and smooth finish. A septic tank
shall be constructed adjacent to the toilet (approximately 3.00 meters away) to store
human waste from the toilet. Toilet and plumbing works shall be carried out under the
following:
1. Location of the toilet shall be marked on the ground including the location of
the toilet bowl, floor drain and drain pipe from the wash basin. PVC pipe that
connects the toilet bowl shall be laid and positioned directly towards the septic
tank. PVC drain pipes from wash basin and floor drain shall terminate at the PVC
pipe connecting from the toilet bowl to the septic tank. Prior to actual construction
of the toilet, the ground shall be treated with anti-anay solution.
2. Wall footings shall be excavated to the dimensions as indicated in the plan. CHB
shall be installed taking into consideration the connection of the CHB to the
adjoining the wall of the building.
3. Flooring of the toilet shall be of plain finish concrete slab over a compacted
base.
4. Building walls adjoining the toilet shall be constructed simultaneously with the
construction of the toilet walls to ensure rigidity of the toilet structure. Or starter
CHB blocks may be provided during the construction stage of the building and shall
be completed during the construction of the toilet.
5. Similarly, door jambs shall be provided during the construction of the building
and its door shall be fixed later when the work on the toilet has been completed.
6. Toilets shall be provided with a fixed type window (decorative CHB to make it
more durable) with dimension enough for air to exit and enter the toilet or as
indicated on the plan.
7. CHB walls of the toilet shall be plastered with smooth cement plaster both inside
and outside and shall be smooth.
8. Roof framing of the toilet shall be strong and durable timber that can sustain
strong winds. Roofing materials shall be the same physical properties as that of
the roofing material of the building. Roofing materials shall be fastened using
appropriate roofing nails. Heat from roofing shall be protected using plywood
materials as ceiling.
9. Two water faucets shall be provided inside the toilet, one over the wash basin
the other near the toilet bowl.
10. When painting is required on the plan, painting works shall be carried out using
one under coat and two finishing coats of color indicated on the plan.
H. Electrical works
Whenever required in the plan, electrical works shall be carried in accordance with
the Electrical Code of the Philippines. Electrical connection shall be provided inside the
rooms, toilets (if applicable) and outside of the buildings to provide illumination of the
building during night time.
1. Each room shall have its own main switch independent from the other rooms.
2. Each room shall have a minimum of one light located at the center most section
to provide equal distribution of illumination. Its switch shall be located near the
door for easy access.
3. A minimum of two outlets shall be provided in each room and shall be located
in areas where it could be accessible.
4. Materials to be used shall pass the Philippine Standards and shall be in
accordance with the Electrical Code of the Philippines.
5. All electrical wire connection shall be run beneath the surface of the wall and
behind the ceiling.
6. Before commissioning the electrical system in place, it shall be meager tested
and results shall be acceptable.
H. Painting Works
When provided in the plan, painting in small-scale community infrastructures shall be for
the walls (inside and outside), outside surface of the roof (if not pre-painted) ceiling,
doors and windows and structural steel. Painting works shall be carried out under the
following:
2. If painting of the roof ceiling is indicated in the plan, areas where painting will
be required shall be provided with an under coat white enamel paint, after which
paint putty shall be applied. After the paint putty dries, its surface shall be rubbed
with sand paper until it is smooth. Two coats of finish paints with color as indicated
on the plan shall be provided using brush.
3. For concrete and CHB walls, the surface to be painted shall be provided with
paint putty and smoothen through sanding. Application of two coats of finish paint
shall be applied.
4. For non-painted G.I. roofing, the exterior side shall be provided with neutralizer
solution. After which, zinc chromate paint or a non -toxic anti-corrosive paint shall
be provided. Once the anti-corrosive paint dries, roof paint of color as indicated in
the plan shall be applied in two coats.
Painting of five Logos as prescribed and indicated of the implementing program must
be included. Logos of Logos of DSWD, KALAHI-CIDSS, PMNP (Philippine Multi-sectoral
Nutrition Project) Logo, Municipal Logo ang Barangay Logos must be in the same color
of the original or as prescribed. It must be painted in the front of the structure or as
where it was indicated on detailed engineering design. Example logos must be included
in these specifications.
To conform with the requirement of the implementing agency and the funder, the
project billboard and brass marker must be provided by the contractor.
(c) Office Expenses, e.g., for office equipment and supplies, power and
water
Contingencies–
Miscellaneous Expenses–
These include laboratory tests for quality control and plan preparation.