Professional Documents
Culture Documents
User Manual of STE18-B Prepaid Keypad Single Phase Electricity Meter
User Manual of STE18-B Prepaid Keypad Single Phase Electricity Meter
Electricity Meter
0
Catalogue
1. Product Introduction ....................................................................................... 2
2. Specifications ......................................................................................................3
2.1 Electrical Parameters ................................................................................3
2.2 Electromagnetic Compatibility .............................................................3
3. Appearance ......................................................................................................... 4
4. Meter Dimension ...............................................................................................6
5. Wiring Diagram ..................................................................................................7
6. Functions .............................................................................................................. 8
6.1 Remote Communication ........................................................................ 8
6.2 Anti-Tamper .............................................................................................. 8
6.3 Parameter Settings ................................................................................... 8
6.4 Credit Alarming ..........................................................................................8
7. LED Indicators .....................................................................................................9
8. LCD Display ....................................................................................................... 11
9. Instruction Manual ......................................................................................... 14
10. Atttachments ................................................................................................. 15
1
1. Product Introduction
The prepaid keypad single phase electricity meter is is mainly used to
measure one phase active energy of the low-voltage network, and the voltage,
collect data and switch on/off for the smart meter. Many pieces of meter could
be installed in a meter box to count the electric energy for different rooms and
loads.
The raw materials like metering chip and other key components, we use the
high-reliability. All of our meters are produced in accordance with IS09001 and
ISO14001 standards, make sure the reliability and stability of the product,
2
2. Specifications
2.1Electrical parameters
2.2Electromagnetic Compatibility
3
3. Appearance
LED Indicators
Keypads
Meter ID Number
Tamper Switch
Output terminal
of the pulse
①LED indicators:
“1000imp/kWh”: Pulse light, when the meter works normally after being
connected to the load, it shows blue light, and every 1000 flashes is 1 kWh.
“Warning”: Alarming light, when the meter in the tamper state or the
“Comm”: Signal light, it’s turned on when communicate with CIU or DCU
successfully.
4
“Credit”: When the credit balance is sufficient, it shows green light; when
②Tamper Switch: Tamper protection function. When the cover is opened , the
4. Meter Dimensions
·Dimension:180.2mm×120mm×55.7mm(length×width×height)
·Installation:Suspension Installation.
5
5. Wiring Diagram
Sequential Wiring
6
6. Functions
6.1 Remote Communication:
· The single phase energy meter is STS standard smart meter, which requires
users input a 20-digit Token to top up electricity, clear credit, and clear tamper.
·The single phase energy meter supports RF wireless communication, using CIU
for meter reading, the distance is about 350m; using DCU for batch meter
·The tokens could be sent into meter by CIU remotely, the Admin also could
6.2 Anti-Tamper:
When the transparent protective cover is opened, the tamper switch is
triggered, the valve will be closed and the "Warning" indicator will show yellow
threshold, the "Warning" indicator shows yellow light and the “Credit”shows
7
7. LED Indicators
billing)
8
The balance is zero and the Sufficient balance, in the
9
8. LCD Display
"REJECT": It means that the Token refused "ACCEPT": It means that the
by meter, the Token may not for the meter Token could be accepted by
errors.
10
"OLD": It means that the input Token "USED": It means that the input
is expired and need to generate new Token has been used before and
11
"OVER PO": It means the "Err-06": It means that the input
overdraft, the power will be cut off digits, need to input the token
12
9. Instruction Manual
The single-phase rail meter has a credit for 10kwh when it completed in the
factory, the balance is sufficient but the meter is in the tamper state.
After powering on for the meter, we need to input 20 digits anti-tamper token
into meters by keypads or matched CIU. Users could use energy normally after
the meter clear tamper and close the valve. Then users can buy electricity as
request.
14