Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

2.

5 Work instructions

Learner: Date:

Learner guidance notes


Aims and objectives
At the end of this activity sheet, you should be able to:
● prepare to carry out an engineering activity ensuring that job instructions are
obtained and understood.

Instructions
A work instruction is shown below. Look at the work instruction carefully and use it to
answer the following questions.

1. To what task does the work instruction relate?


Drive belt inspection/replacement

2. On what equipment is the drive belt fitted?

A gear

3. How many sub-tasks are involved?


6

1
4. What sub-task needs to be performed before the split pin (0219) can be
withdrawn?
Straighten the split pin by bending away from the shaft

5. What is the part number of the circlip?


0235

6. What should happen immediately after the circlip is removed?


Carefully lift the gears up and away from drive shafts

7. What tools are required to perform the task?


Long nosed pliers, circlip pliers

8. What parts are required to perform the task?


Drivebelt 0798 split pin 0219 circlip 0235

You might also like