ENERGIZATION PERMIT 327 OF 380 KV OHTL From 9050 To PS-3 BSP Circuit-A

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

To: Manager, Control Division – Central & East.

It is notified that we have completed the survey of the below titled project for status of its conformance to NG
Mandatory Requirements of Energization and intimate that in accordance with inputs received from all
concerned Transmission Divisions, the mentioned Facility/Equipment are Technically Acceptable from
transmission side and may be energized as and when required in accordance with the Control Center Procedures
and Regulations.
For questions, if any, please contact Jawad Ghaus Chaudhry at Phone 01-77049 or at e-mail
JGChaudhry@se.com.sa
Project Information
Contract No. 4400007080/00,31131121/00
Construction of 380 KV OHTL from PS#3 BSP to 9050
Project Title 4400006613/00
Substation
Area COA & EOA
S/S Name 380 KV PS#3 BSP & 380 KV 9050 Substation Region Riyadh
Equipment Name(s) / Number(s) As per SLD
Equipment Volt. Level KV Capacity Quantity Name Circuit Breaker
- - - - -
☐ GIS
- - - - -
- - - - -
☐ Power Transformer
- - - - -
☐ Switch Gear - - - - -
☐ Capacitor Bank - - - - -
☐ AUX. Transformer - - - - -
☐ Reactor - - - - -
Volt. Length KM
☐ Feeders New/Existing OHL/UG From C.B # To C.B # TYPE
Level KV NEW EXIS.
PS#3 A-807, S/S K-830, OHL 14 160
Circuit - A New/Exist 380 OHL
BSP A-808 9050 K-850 UG - -
OHL - -
- - - - - - - -
UG - -

Need Operator 24 hours Yes ☐ No ☒


Project Take Over Division Manager Permit Date Permit No.
Signature
Project Take Over Name
Division
Anwar A. Al-Naser 20/12/2018 327

Note
 This Energization Permit shall stand null and void if said facility/equipment is not energized within 10 working days or any
technical problem / safety hazard arises during energization of the said facility/equipment.
 All remaining PETS comments shall be cleared by Projects Division within scheduled time with intimation to PTD & concerned
divisions.
 Control Division shall inform PTD after energization of equipment/facility.

You can see the status of this project at the link http://rdd.web.com/pto/Project D S - N G - 6 2 7 0 - 001-12