DAILY PRODUCTION REPORT CUM DISPATCH PLAN DATE:-24/2/24 IN HOUSE BOUGHT OUT
DISPATCH
SHORTAGE ITEAM REMARKS QC STATUS
STATUS
SR JOB PART
Production Process DETAIL SHORTAGE
CLIENT NAME LOCATION CONNECTION RD CFM QTY CONDITION FLOOR
NO CODE NAME ASSEMBLY
SHEARING BENDING PUFF WELDING COIL SHOP
CONDITION
BASE SHORT
AIRTECH (POWDER
1 CHANDIGARH 2845 CSDU RHS 6 2200 1 ASSEMBLED SANTOSH DONE DONE DONE DONE DONE NO SHORTAGE
HVAC COATING
PENDING)
PANEL AND GI
2 DELTA NEW DELHI 2851 CSDU (LHS-1) , (RHS-1) 6 2200 2 ASSEMBLED SANTOSH DONE DONE DONE DONE DONE FILTER SHORT
SHORT
READY TO
1 MUMBAI 2835 CSDU NC 6 1200 1 ASSEMBLED SANTOSH DONE DONE DONE DONE DONE DONE NO SHORTAGE NO SHORTAGE
DISPATCH
STOP
AIRTECH
4 NEW DELHI 2846 AW RHS NA 7000 1 SKD SANTOSH DONE DONE DONE DONE PRODUCTIO NO SHORTAGE NO SHORTAGE
HVAC
N
GLOBAL READY TO
2
TRADING
2849 CSDU LHS 6 2000 1 ASSEMBLED SANTOSH DONE DONE DONE DONE DONE DONE NO SHORTAGE NO SHORTAGE
DISPATCH
READY TO
3 MASCON MUMBAI 2850 CSDU RHS 1600 1 ASSEMBLED SANTOSH DONE DONE DONE DONE DONE DONE NO SHORTAGE NO SHORTAGE
DISPATCH
SAME AIR
7 PUNJAB 2860 AW RHS 8000 1 SKD SANTOSH DONE DONE DONE DONE DONE NO SHORTAGE NO SHORTAGE
SYSTEMS
8 SEASHORE MUMBAI 2853 CSDU LHS 3000 1 ASSEMBLED SANTOSH DONE DONE DONE DONE DONE NO SHORTAGE NO SHORTAGE
CAPITAL MALL
5
(MUMBAI)
2873 CSDU RHS 6 3200 1 ASSEMBLED SANTOSH DONE DONE DONE DONE DONE DONE NO SHORTAGE NO SHORTAGE DISPATCHED
SEEMAK TODAY
14 NEW DELHI 2852 FMU RHS 6 1800 1 ASSEMBLED SANTOSH DONE DONE DONE DONE DONE NO SHORTAGE NO SHORTAGE
INNOVATION DISPATCH
ZENITH READY TO
6 KASHMIR 2883 CSDU LHS 5000 1 ASSEMBLED SANTOSH DONE DONE DONE DONE DONE DONE NO SHORTAGE NO SHORTAGE
INTERIOR DISPATCH
1. AS PER PURCHASE
KUBIC INDIA BARELLY MALL SOME MATERIAL FAN SHORT
7 (UP)
2888 CSDU LHS 1600 1 ASSEMBLED SANTOSH DONE DONE DONE DONE IN PROCESS PENDING PERSON TOMORROW
SOLUTIONS PENDING
WILL RECEIVED
1. AS PER PURCHASE
KUBIC INDIA BARELLY MALL SOME MATERIAL FAN SHORT
8 (UP)
2889 CSDU LHS , RHS 2500 2 ASSEMBLED SANTOSH DONE DONE DONE DONE IN PROCESS PENDING PERSON TOMORROW
SOLUTIONS PENDING
WILL RECEIVED
1. AS PER PURCHASE
KUBIC INDIA BARELLY MALL SOME MATERIAL FAN SHORT
9 (UP)
2890 CSDU LHS , RHS 3000 2 ASSEMBLED SANTOSH DONE DONE DONE DONE IN PROCESS PENDING PERSON TOMORROW
SOLUTIONS PENDING
WILL RECEIVED
1. AS PER PURCHASE
KUBIC INDIA BARELLY MALL SOME MATERIAL FAN SHORT
10 2891 CSDU LHS , RHS 4000 1 ASSEMBLED SANTOSH DONE DONE DONE DONE IN PROCESS PENDING PERSON TOMORROW
SOLUTIONS (UP) PENDING
WILL RECEIVED
ZENITH
11 MUMBAI 2901 CSDU LHS 5000 1 ASSEMBLED SANTOSH PENDING PENDING PENDING PENDING PENDING PENDING
INTERIOR
AMBIANCE MAL
TECHCOOL READY TO
12 VASANT KUNG 2918 CSDU RHS 6 2400 1 ASSEMBLED SANTOSH DONE DONE DONE DONE DONE DONE NO SHORTAGE NO SHORTAGE
ENGINEERS DISPATCH
(NEW DELHI)
AMBIANCE MAL
TECHCOOL SOME MATERIAL
13 VASANT KUNG 2919 CSDU RHS 6 3200 1 ASSEMBLED SANTOSH DONE DONE DONE PENDING IN PROCESS DONE NO SHORTAGE
ENGINEERS PENDING
(NEW DELHI)
SANA
ENTERPRISES
HYDERABAD 2923 CSDU RHS 6 3400 1 ASSEMBLED SANTOSH IN STOCK
KAUR & KP
ENGINEERING HYDERABAD 2934 CSDU LHS 6 3200 1 ASSEMBLED SANTOSH
PVT LTD
KAUR & KP
ENGINEERING HYDERABAD 2935 CSDU LHS 6 2800 1 ASSEMBLED SANTOSH
PVT LTD
HYDERABAD
YOU & ME 2936 CSDU LHS 6 1500 1 SANTOSH
(NEXUS MALL)
HYDERABAD
YOU & ME 2937 CSDU LHS 6 2500 1 ASSEMBLED SANTOSH
(NEXUS MALL)
READY TO
15 BHATINDA 2720 AW RHS NA 2650 1 SKD MANTU DONE DONE DONE DONE DONE DONE COMPLETED NO SHORTAGE
DISPATCH
READY TO
16 BHATINDA 2721 AS LHS NA 2450 1 SKD MANTU DONE DONE DONE DONE DONE DONE COMPLETED COMPLETED
DISPATCH
PINAKI
10 NEW DELHI 2854 CSDU RHS 900 3 ASSEMBLED MANTU DONE DONE DONE DONE DONE DONE COMPLETED COMPLETED
ENGINEERS
ALL MATERIAL
18 SEASHORE MUMBAI 2856 CSDU LHS-1, LHS-1 6000 2 SKD MANTU DONE DONE DONE DONE DONE DONE NO SHORTAGE
PENDING
19 SEASHORE MUMBAI 2859 CSDU LHS-1, LHS-1 10000 2 SKD MANTU DONE DONE DONE DONE DONE DONE COMPLETED COMPLETED
11 A1 AC MUMBAI BANGLORE 2847 AS RHS 13000 1 SKD MANTU DONE DONE DONE DONE DONE DONE COMPLETED COMPLETED
READY FOR
23 AS AIRTECH PUNE 2909 CSDU RHS-2 2800 2 MANTU DONE DONE DONE DONE DONE DONE NO SHORTAGE NO SHORTAGE
DISPATCH
1. 22 GUAGE ME
BANEGA FCU SINGLE
WADALA,
SANA SKIN
26 LODHA , 2915 FCU RHS-1, LHS-1 1200 2 ASSEMBLED MANTU HOLD HOLD HOLD HOLD HOLD HOLD HOLD NO SHORTAGE
ENTERPRISES 2. FOAM LAGEGI
MUMBAI
INSIDE (6 TO 9 MM
KI)
GRACE
27
FABRICATION
BANGLORE 2917 CSDU NC 6 1600 1 ASSEMBLED MANTU SENT FROM STOCK
SAME AIR
GHAZIABAD 2924 FCU LHS-1 , RHS-1 3 1600 2 ASSEMBLED MANTU
SYSTEMS
SAME AIR
GHAZIABAD 2925 FCU RHS 3 1200 1 ASSEMBLED MANTU
SYSTEMS
ACREX
ENGITECH PVT GURGAON 2926 AE NA NA 2000 1 ASSEMBLED MANTU
LTD
ACREX
ENGITECH PVT GURGAON 2927 AE NA NA 3000 1 ASSEMBLED MANTU
LTD
HALCYON
JAIPUR 2928 AE RHS-2 NA 12000 2 ASSEMBLED MANTU
TEHNOLOGIES
HALCYON
JAIPUR 2929 TFA-CS RHS 6 1200 1 ASSEMBLED MANTU
TEHNOLOGIES
MANESAR (Z
SNV
SQUARE 2930 CSDU LHS 6 3000 1 MANTU
ENTERPRISES
KANPUR)
AARTECH
BAWANA , NEW
SURFACE 2931 AW LHS NA 15000 1 MANTU
DELHI
ENGINEERING
AARTECH
BAWANA , NEW
SURFACE 2932 AW LHS NA 23500 1 MANTU
DELHI
ENGINEERING
ZENITH
CHENNAI 2933 CSDU LHS 6 5000 1 MANTU
INTERIOR
HYDERABAD
2938 CSUD LHS 6 3500 1 MANTU
(NEXUS MALL)
SR NO JOBE CODE
FAN MOTOR
QTY MODEL STATUS QTY KW/POLE
MAKE MAKE
Err:509 Err:509
4 2855
4 2846
Err:509 Err:509
5 2857
Err:509 Err:509
Err:509 Err:509
STORE DEPARTMENT
STATUS
MOTOR
STATUS FAN PULLEY STATUS STATUS BELT STATUS PUMP MAKE
PULLEY
FILTER
DETAIL STATUS ELEMINATOR STATUS PAD STATUS
MAKE
FILTER
L W H STATUS
TYPE
DAILY PRODUCTION REPORT
SHEARING SHEARING SHEARING
SR NO JOB CODE CFM QTY
OUTER INTERNAL FILTER FRAME
COMPLETED
COMPLETED
_____ COMPLETED
_____ COMPLETED
_____ COMPLETED
COMPLETED
DISPATCH SCHEDULE DATE:- 06/11/23
SR NO CLIENT NAME LOCATION JOB CODE TYPE CFM QTY CONDITION
###
###
###
###
###
###
###
JOB CODE Err:509
CFM Err:509
LOCATION Err:509
CLIENT Err:509
PART NO Err:509
LOCATION MUMBAI
CLIENT SEASHORE
PART NO 3564
PROJECT : Date of
Err:509
- Inspection
Name of
Project
Job Code:- :- Err:509
Product AIR HANDLING UNIT
Job code :- Err:509 Type Err:509
Client Name
Err:509
:-
Invoice Date :-
Qty :- Err:509
Unit Fan Motor Motor Fan
Sr No Unit Sr No Fan Descreption Fan Sr No Motor Sr No TYPE Connection RD
Capacity Make Make Descreption Pulley
A80MJM20VG18FO
Err:509 Err:509 Err:509 0 0 0 0 Err:509 Err:509 Err:509 0
X
PROJECT : Date of
-
MUMBAI
Inspection 6-Nov-23
Name of
Project
Job Code:- :- MUMBAI
Product AIR HANDLING UNIT
Job code :- 2855 Type CSDU
Client
SEASHORE
Name:-
Invoice Date:-
Qty :- 2
Unit Fan Motor Motor Fan
Sr No Unit Sr No Fan Descreption Fan Sr No Motor Sr No TYPE Connection RD
Capacity Make Make Descreption Pulley
Err:509 3561 4500 0 0 0 0 CSDU LHS 6 0
PROJECT : Date of
-
Err:509
Inspection 6-Nov-23
Name of
Project
Job Code:- :- Err:509
Product AIR HANDLING UNIT
Job code :- Err:509 Type Err:509
Client Name
Err:509
:-
Invoice Date:-
Qty :- Err:509
Unit Fan Motor Motor Fan
Sr No Unit Sr No Fan Descreption Fan Sr No Motor Sr No TYPE Connection RD
Capacity Make Make Descreption Pulley
Err:509 3564 Err:509 0 0 0 0 Err:509 Err:509 Err:509 0
PROJECT : Date of
-
MUMBAI
Inspection 6-Nov-23
Name of
Project
Job Code:- :- MUMBAI
Product AIR HANDLING UNIT
Job code :- 2857 Type CSDU
Client
SEASHORE
Name:-
Invoice Date:-
Qty :- 4
Unit Fan Motor Motor Fan
Sr No Unit Sr No Fan Descreption Fan Sr No Motor Sr No TYPE Connection RD
Capacity Make Make Descreption Pulley
(LHS-3)
Err:509 Err:509 Err:509 0 0 0 0 CSDU 6 0
(RHS-1)
PROJECT : Date of
-
Err:509
Inspection 6-Nov-23
Name of
Project
Job Code:- :- Err:509
Product AIR HANDLING UNIT
Job code :- Err:509 Type Err:509
Client
Err:509
Name:-
Invoice Date:-
Qty :- Err:509
Unit Fan Motor Motor Fan
Sr No Unit Sr No Fan Descreption Fan Sr No Motor Sr No TYPE Connection RD
Capacity Make Make Descreption Pulley
Err:509 Err:509 Err:509 0 0 0 0 Err:509 Err:509 Err:509 0
Motor
Pulley
0
UNIT
Motor
Pulley
0
UNIT
Motor
Pulley
0
UNIT
Motor
Pulley
0
UNIT
Motor
Pulley
0
UNIT
Motor
Pulley
0