MSIL ROHTAK ELECTRICAL PANEL/MDB/PDB &

EQUIPMENTS DISMANTLING BUILDING-10 (CHECK KMECCO ENGG


LIST) SERVICES PVT.LTD
Date: Name of Employee Location/ Area REMARK

Ensure that all personnel involved in the dismantling YES N/A


1 process wear appropriate PPE

Before starting any work, ensure that the power to


2
the electrical panel and equipment is turned off
Implement lockout/tagout procedures to prevent
3 accidental re-energizing of the electrical system

Lockout devices and tags should be placed on all


4 energy-isolating devices to indicate that servicing is
being performed.

Use insulated tools and equipment designed for


5 electrical work to minimize the risk of electrical
shock

6 Use barriers or signs to prevent unauthorized access


to the work area.
verify that the power to the panel has been safely
7 turned off

8 Remove circuit breakers or fuses from the panel, if


necessary
9 Ensure safe use when unplugging
Prevent electrical equipment from contacting wet
10 areas
Disconnect all wiring from the electrical panel and
11 equipment

Use a voltage tester or multimeter to verify that


there is no voltage present within the panel before
12 proceeding with any further work

Inspect the interior of the panel for any signs of


contamination, such as dust, debris, or moisture,
13 which could affect the safe operation of the
equipment

Before proceeding with dismantling, re-verify that


14 the power to the electrical panel has been safely
turned off
Follow proper procedures to disconnect internal
15 wiring within the panel

Inform relevant personnel, such as building


occupants or maintenance staff, about the planned
16 disconnection to avoid any unexpected disruptions