TOILET PROJECT QUOTATION


1. Blocks 1800pcs 40sh per pc 72,000
2. Cement 60 bags 800 per bag 48,000
3. River sand 21 tonnes 36,000
4. Timber 3x2 500fts 35 per ft 17,500
2x2 400fts 25 per ft 10,000
5. Iron sheets 3mtrs 60pcs 1600 per pc 96,000
6. Roofing Nails 10kg 300 per Kg 3000
7. Building Nails 4 inches 8kgs 300 per kg 2400
8. Wall pass 6kg 250 per kg 1500
9. Face board 200fts 150 per ft 30,000
10. Floor and Wall tiles
120 boxes 750 per box 90000
5pcs corner strip 3000
Labour 150,000
Miscelleneous 25,000
TOTAL Ksh. 584,400