Safety Layout Plan Stage-02
Safety Layout Plan Stage-02
STAGE-02
WORK PERIOD:- 1 DAY
TIMINGS:- 12.00 AM TO 6.00AM
PROJECT LOCATION
PST 01
PST 02
LEGENDS:-
OPEN BELOW
METHOD OF STATEMENT:-
1. MODIFICATION OF FOOTPATH IN ORDER TO
BUILDING CONSTRUCTION IN CONSTRUCTION
GENERAL NOTES:-
1. DO NOT SCALE FROM DRAWINGS.
PROJECT: EU-372
Existing Access
REV. DRAWN BY DESCRIPTION DATE
BUILDING LINE
PROJECT :
MODIFICATION OF SERVICE ROAD FOR
Existing Car Parking Area
TEMPORARY ACCESS FOR CONSTRUCTION
Red and white plastic barriers filled with water Existing Car Parking Area VEHICLES FOR PROPOSED BUILDING B+G+134
Reduce Speed
EXIT ENTRY Temporary Construction Vehicle Access FLOORS MIXED USE TOWER ON PLOT NO:3350151
Temporary Service Road Close
Men at Work
AND CAR PARK BUILDING 9B+G+16 FLOORS +R
A E=494757.042 ON PLOT NO:3356231 AT TRADE CENTER FIRST
N=2790929.344
Sliding Door
9.32 WATCHMAN ROOM
Red and white plastic barriers filled with water Proposed Car Exit Temporary OWNER :
WATCHMAN ROOM
WORKS
END OF
0.67
15.00 3.16
7.00
P.O. BOX: 121385, CONRAD HOTEL, SUITE NO. 1506, 15th FLOOR
SHEIK ZAYED ROAD, DUBAI, UAE
AZIZIDEVELOPMENTS.COM
EXISTING ROAD
EXISTING ROAD
EXISTING ROAD EXISTING ROAD EXISTING ROAD EXISTING ROAD
abu dhabi . amman . bratislava . dubai . karbala . oberhausen . pittsburgh
www.ae7.com
Hassanicor Building, 6th Floor, Al Barsha 1
PO Box 54115 Dubai, UAE
P: +971 4 3997758 F: +971 4 3997759
MAIN CONTRACTOR :
Top of road
DRAWING TITLE :
Existing Vehicular tile (8cm) with with crushed sand bed & road base layer SJ ZK NQ
crushed sand bed & road base layer DRAWING NUMBER: REV REV.DATE