Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

PROJECT

PROPOSAL

Reduce your
Electricity bill to
ZERO !
stop paying and
start earning
with net-metering.
THANK YOU
We appreciate the chance to suggest
an effective and well-designed
solution for your energy
requirements. Our objective is to
offer affordable and dependable solar
energy solutions that fully meet the
needs of our esteemed customers by
utilizing cutting-edge green
technology. Our ambition is to
establish our company as the leading
provider of solar solutions in
Pakistan.
SYSTEM DESIGN
Our systems are carefully and thoughtfully created using top-of-the-line software to
guarantee precision and dependability. We incorporate intelligent inverters that
effectively utilize your PV power generation, and are equipped with an integrated smart
energy control unit to ensure a consistent output voltage. Furthermore, these systems
are sophisticated enough to autonomously diagnose issues in various situations, which
means that human intervention is kept to a minimum.

INSTALLATION & COMMISSION


At our company, we value transparency in our business transactions and encourage
our clients to make informed decisions. Our technical team will maintain
communication with you throughout the process, providing updates on the various
aspects of the project. We appreciate your valuable time and look forward to the
possibility of collaborating with you in the future.

AFTER SALES
Our objective is to ensure that our customers are satisfied, and to that end, we aim
to remain in contact with you to receive your feedback and provide any assistance
you may require with your PV system.
Financial Proposal For 3KW Hybrid System

Client Name: Mr.

 Contact:

Address:

Scope of Work: Designing, Installation & Commissioning

Sr
Item Specification UOM Qty
no.
Make: Longi / Jinko / JA 550W
1 Solar Panel Nos 6
Type: Mono-Perc Half Cut Tier 1 Grade A
Make: Ziewnic / Fronus
2 Solar Inverter Nos 1
Type: Hybrid 3.2kw

3 Structure Standard Galvanized Iron KW 3

Cable: Pakistan / Fast / Eqv.


4 Balance of System Breakers: Chint/schnider, Changeover, DB KW 3
Box etc.
Make: Phoenix /Osaka /Exide /AGS
5 Batteries Nos 2
Type: Tall Tabular Batteries 12V 145AH
6 Transportation Within City Nos 1
Installation &
7 Intstallation KW 3
Commissioning

Total Price : PKR 568,172


Less: Discount PKR 24,474
Tot. Payment w/o Tax PKR 543,698
Add: Taxes: 1,747
Net Amount PKR 545,445
TERMS & CONDITION
Any depreciation in the value of PKR relative to the USD-PKR exchange rate
will be included in the total price of the product, and the customer will bear
Indicative Price
the cost, as specified below. Additionally, the customer will be responsible for
any price fluctuations caused by the closing of the port.

Price Validity Price quoted is valid for 5 days from the date of quotation

Payment terms 60% advance, 35% on product delivery & 5% before commissioning.
All payments to be made by crossed cheque or online transaction in the name
of Zynergy Solutions.

However, Due to the port's closure, some transactions may have to be


conducted via cash or direct vendor account as GST invoices may not be
available.

Other Terms PV module size and make may vary upon availability at the time of
confirmation order

Final Price of System will be calculated on USD-PKR exchange rate as at the


date of installation or date of final payment by the customer. Any remaining
balance resulting from additional work beyond the agreed scope of work
which is mentioned must be paid by the customer after receiving an invoice
from Zynergy Solutions before the system's installation at the site.
Operation & Zynergy Solutions will provide one year of free O&M services, and after that,
Maintenance the customer will need to pay for them under a contract.

Zynergy Solutions is an approved EPC company for net metering by the AEDB
(Government of Pakistan) and will guide customers through the net metering
process with their utility provider. However, Zynergy will not be held
Net Metering responsible if NEPRA does not grant approval. Additionally, Zynergy will assist
customers in preparing necessary documentation for net metering, while
customers are responsible for AC earthing, meter name change, sanction load
change, and payment of net-metering demand notice.

Relocation of The relocation of the system from one site to another will be charged to the
System client in the event of a deviation from the design document.
Solar Panel: Grade-A, Mono – Perc – Workmanship 12 Years
Solar Panel: Grade-A, Mono – Perc – Performance 25 Years
Warranty
Inverter 05 Years
Battery 5 years
Material Unit Quantity
Ducting Meters 25
25 (Black), 25 (Red), 25 (Yellow) &
Zynergy’s Wiring-AC 4mm2 Meters
25(Blue)
Scope of work
(Standard) Wiring-DC 4mm2 Meters 45 (Black) & 45 (Red)
Earth Wire Y/G 4mm2 Meters 90
 Design Document for PV Module mounting structure installation on the
roof.
 PV Modules, inverter and/or battery installation
 Conduits and Cable laying for both (AC and DC)
 AC Cable between the inverter and closest AC Disconnect to the inverter
Zynergy’s  Start-up & Commissioning
Scope of work  DC earthing will be provided by Zynergy for on-grid systems, whereas for
(Standard) hybrid systems, earthing is not included in the standard scope of work.
- Details  The provision of 3-phase input at the inverter locations is the
responsibility of the client.
 The customer is responsible for arranging the separation of the
designated load according to their needs on-site. Zynergy's responsibility
is limited to the grid input and inverter output. The respective cables to
be taken to and from only one main DB to identified place where the
Solar Inverter is to be installed.
ACKNOWLEDGEMENT
By agreeing to the price and proposal terms stated
above, I confirm that I have read the entire document
and understand all the conditions. I also commit to
following the payment schedule and scope of work
mentioned.

Customer Signature Sale Rep. Signature

Name: Name:

Date: / / Date: / /
CNIC: CNIC:

You might also like