Al Reeman II Phase 3 - Villas and Infrastructure

REINFORCEMENT AND CONCRETING CHECKLIST

Location/Area: Date:

Checked by Site Checked by


SN Description Remarks
Engineer QA/QC

Material is approved as per approved material


1
submittal.

Check for setting-out and level as per approved


2
shop drawings.
Dimension, shape & size or reinforcements are as
3 per approved shop drawings and bar bending
schedule.

4 Steel reinforcement is accurately placed in position


firmly fixed and cover is maintained.

5 Lap length is adequate and lapping is proper.

6 MEP embedded items i.e. size, type, location are as


per approved shop drawings.

7 All debris are removed and area is cleaned


properly.

8 Check for slump and temperature of concrete prior


to transport and placing.

9 Safety measures are being implemented during the


Concreting works.

Sign by Nurol QA/QC Sign By Nurol Site Engineer

Template Ref. no. RS-02-00001-00-19-OA-KBR-FO-000054lRev. 00 Page 1 of 1