Time Sheet Nirmal Wire Dtd.08.03.24

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Surveyor’s Attendance Sheet/

Time Sheet

BV File No : IND.K.4 ZIG NO-

BV Client : CEYLON ELECTRICITY BOARD

Vendor: M/s Nirmal Wire Pvt.Ltd.

Contracting Centre BV – Kilkata Performing Centre BV Kolkata

PROJECT/ P.O. on BV:

Client’s P.O. on Vendor: Tender No.DD2/P&E/ICB/2020/030/D & AWARD No.


DD2/P&D/A/2022/097 ( Ceylon Electric Board to Nirmal Wire)

Inspection
Date of Name of Report
Inspection Place Man-Day Hours & time
visit Inspector Number
(start to end)

M/s Nirmal Wire


08.03.24 Biswajit Deb Pvt.Ltd, Deulti 01 8 hrs IR-1
Howrah.

Reference: Inspection Call through e-mail on 07.03.24

Biswajit Deb Client’s / Vendor Representative


Inspector Name & Signature (Signature/Name/Stamp)
(If Any)

You might also like