Commented Commented
No SUBJECT / ITEM ÇALIK ENERJI (CE) / TCE COMMENTS LLC ELLIPS's REPLIES ÇALIK ENERJI (CE) / TCE COMMENTS TCE Replies LLC ELLIPS's REPLIES (10-05-2024)
By By
1 General Sampling water from a well - 30 nos TCE Was introduced. On page 180. -
Neither the equipment nor the expert was
2 General Fire extinguishing strength test 2 TCE -
found to conduct this test
3 General Soil chemical analysis 30 TCE Was introduced. On page 178. -
The report should include key information such as water losses, well failures, Sample pdf will be shared for reference.
4 General TCE Was introduced. On page 131. It will be checked by TCE.
artesian water conditions, and photographs of each rig. Request to provide as the same.
5 General TCE Was introduced.
6 General Photos of soil surveys must be attached. TCE Was introduced. On page 260. -
7 General Photographs of all test pits must be included. TCE Was introduced. On page 260. -
The report must include a plan indicating the testing location (borehole, test pits,
8 General TCE Was introduced. On page 241. -
CBR, ERT, TRT, etc.).
9 General Seasonal fluctuations in groundwater must be indicated. TCE not specified in the technical specifications -
A study should be included to evaluate the degree of liquefaction.
Cl.4.0 Field Investigation The report must be accompanied by a well sampling log and the results of
11
'Sheet 29/205 laboratory testing of samples from the sampling wells.
TCE Sufficient information is provided -
Upon request, pile foundations (BCI) in accordance with Eurocode should be This is not specified in the terms of reference.
Cl. 7.5 Allowable Bearing
14 recommended. Recommended pile capacity should be given for piles of different TCE Please do not request items that are not -
capacity
lengths and diameters. listed.
It should be noted that the drilling plans are presented in a CAD (.dwg) file.
15 General TCE Was presented -
Request for inclusion in geotechnical report (pdf).
The results of rock mechanical testing performed on the sites found within the
study area are presented differently in the data report and the geotechnical
16 Typical report. Since the geotechnical report is prepared later, we continue to use the CE Was introduced. On 189 pages. -
values stated in the geotechnical report, but this situation requires confirmation.
Attached are photographs from the two reports.
Compaction test reports performed on soil samples are not included in any of the
17 General CE Was presented -
reports. Compaction test reports must also be provided.
Partly incorporated.
Commented Commented
No SUBJECT / ITEM ÇALIK ENERJI (CE) / TCE COMMENTS LLC ELLIPS's REPLIES ÇALIK ENERJI (CE) / TCE COMMENTS TCE Replies LLC ELLIPS's REPLIES (10-05-2024)
By By
Noted.
19 General Photographs of the core boxes should be attached to the report as an appendix. TCE Was introduced. On page 260. The same will be included in the report.
Core box photos for BH-12, Bh-14, BH-31 to 33 are not
incorporated.
21 General What is the cone apex area of the CPT equipment used? CE page 40 -
The geotechnical report indicates an energy utilization factor for SPT values of
22 SPT Energy Correction 1.05. It is necessary to confirm whether any energy coefficient measurements CE -
have been taken and whether this value is reliable. changed 0.8
23 General "Slake durability index test" 2 pieces TCE This test is not available in our region -
As per Sub soil profile, the top layer generally consists of GEE-1 & GEE-2 where
the soil classification is CL-ML/CL, but the CBR value range corresponds to the
Table 6.21 California Bearing soil classification of GC/GM and the values are on higher side. For CL-ML soil,
The reported CBR value is on higher side.
24 Ratio the CBR value will be on the lower side (ranging from 5% to 10%). There seems TCE page 196 Request to recheck the CBR values again.
The reported CBR values are correct as per M/s Ellips
Sheet 192/205 to be a mismatch in the values. Request to check. The reference for the CBR
value is provided below.
The results of VES are not clear. Request to revise and reattach clear results
Cl 5.0 Geophysical study with units. Average resistivity value for each VES test is not indicated in the Request to provide average resistivity value and pls mention
25
Sheet 148/205 report and the same shall be provided. Also, request to summarize the VES
TCE - the corresponding corrosiveness.
The same will be included in the report.