Professional Documents
Culture Documents
S3 Long
S3 Long
2- 16MMØ 2- 16MMØ
2- 16MMØ
BOTTOM BARS BOTTOM BARS
BOTTOM BARS
@ SUPPORT @ SUPPORT
@ MIDSPAN
TOP OF
ROOF BEAM
50
SCHEDULE OF BEAMS
7@100
3@100
REST@150
400 MM
10mm STIRRUPS 10mm STIRRUPS
RB 200 400 3 @ 100mm,
3 @ 150mm, 2 -16mm Ø 4 -16mm Ø
2 - 16mm Ø 4 - 16mm Ø
BOTTOM BARS BOTTOM BARS & REST
(BB) (BB) @ 200mm OC
50 7@100
50
3@100
7@100
300
3100
SPLICE @ MID-HEIGHT
REST @ 150
OF THE COLUMN
600
GROUNDFLOOR FFL
7@100
250
NGL
200
50
REBAR SPACING ALONG SHORT DIRECTION REBAR SPACING ALONG LONG DIRECTION
THK.
MARK (mm) SIZE EXT. SUPPORT MID-SPAN INT. SUPPORT SIZE EXT. SUPPORT MID-SPAN INT. SUPPORT REMARKS
(mm) TOP BOT. TOP BOT. TOP BOT. (mm) TOP BOT. TOP BOT. TOP BOT.
S-1 125 Ø10 200 200 200 200 200 200 Ø10 200 200 - 200 200 200 1-WAY
VERIFY
3@100
S-2 125 Ø10 200 200 200 200 200 200 Ø10 200 200 200 200 200 200 2-WAY
BOTTOM OF
FOOTING
CERTIFIED BY: PRC No. XXXX PROJECT TITLE: APPROVAL: SHEET CONTENT: REVISIONS: SHEET NO.:
VALIDITY XXXX