PEKERJAAN LANGIT-LANGIT / PLAVON

1 . Mengerjakan langit - langit gibsum


An. Suppl. VIII / M2
Bahan :
1.1000 M2 Gibsum @ Rp. = Rp. 0.00
0.0110 Rangka kayu @ Rp. = Rp. 0.00
0.2000 Kg. paku @ Rp. = Rp. 0.00
Rp. 0.00
Upah :
0.5000 Pekerja @ Rp. = Rp. 0.00
0.0250 Mandor @ Rp. = Rp. 0.00
Rp. 0.00
Rp. 0.00

2 . Langit-langit kisi An. Supll VII + D. 12 / M2


Bahan :
0.0094 M3 kayu klas II @ Rp. = Rp. 0.00
1.1000 M3 bilik kayu @ Rp. = Rp. 0.00
0.0200 Kg. paku @ Rp. = Rp. 0.00
Rp. 0.00
Upah :
0.5000 Pekerja @ Rp. = Rp. 0.00
0.0250 Mandor @ Rp. = Rp. 0.00
Rp. 0.00
Rp. 0.00

3 . Langit-langit tripleks An.Suppl. VIII O+D.12/M2


Bahan :
1.1000 M2 tripleks @ Rp. = Rp. 0.00
0.0110 M3 rangka kayu @ Rp. = Rp. 0.00
0.0200 Kg. paku @ Rp. = Rp. 0.00
Rp. 0.00
Upah :
0.5000 Pekerja @ Rp. = Rp. 0.00
0.0250 Mandor @ Rp. = Rp. 0.00
Rp. 0.00
Rp. 0.00

3 . Langit-langit tripleks An.Suppl. VIII+D.12+(F1x0,01) / M2


Bahan :
1.1000 M2 tripleks @ Rp. = Rp. 0.00
0.0110 M3 rangka kayu kls. II @ Rp. = Rp. 0.00
0.0200 Kg. paku campur @ Rp. = Rp. 0.00
0.0324 Kg. paku tripleks @ Rp. = Rp. 0.00
Rp. 0.00
Upah :
0.5000 Tukang kayu @ Rp. = Rp. 0.00
0.0150 Kepala tukang @ Rp. = Rp. 0.00
0.5000 Pekerja @ Rp. = Rp. 0.00
0.0250 Mandor @ Rp. = Rp. 0.00
Rp. 0.00
Rp. 0.00
catatan = dicopy dari CONSULTAN

4 . Langit-langit jabarwood An.Suppl.VIII+D.12/M2


Bahan :
1.1000 M2 jabar wood @ Rp. = Rp. 0.00
0.0110 M3 rangka kayu @ Rp. = Rp. 0.00
0.0200 Kg. paku @ Rp. = Rp. 0.00
Rp. 0.00
Upah :
0.5000 Pekerja @ Rp. = Rp. 0.00
0.0250 Mandor @ Rp. = Rp. 0.00
Rp. 0.00
Rp. 0.00

5 . Langit-langit saiwood An. Suppl.VIII+D.12/M2


Bahan :
1.1000 M2 Saiwood @ Rp. = Rp. 0.00
0.0110 M3 rangka kayu @ Rp. = Rp. 0.00
0.0200 Kg. paku @ Rp. = Rp. 0.00
Rp. 0.00
Upah :
0.5000 Pekerja @ Rp. = Rp. 0.00
0.0250 Mandor @ Rp. = Rp. 0.00
Rp. 0.00
Rp. 0.00

6 . Langit-langit Teakwood/M2 An.Suppl.VIII+D.12


Bahan :
1.1000 M2 Teakwood @ Rp. = Rp. 0.00
0.0110 M3 rangka kayu @ Rp. = Rp. 0.00
0.0200 Kg. paku @ Rp. = Rp. 0.00
Rp. 0.00
Upah :
0.5000 Pekerja @ Rp. = Rp. 0.00
0.0250 Mandor @ Rp. = Rp. 0.00
Rp. 0.00
Rp. 0.00

7 . Langit-langit Eternit/M2 An.Suppl.VIII+D.12


Bahan :
1.1000 M2 Eternit @ Rp. = Rp. 0.00
0.0110 M3 rangka kayu @ Rp. = Rp. 0.00
0.0200 Kg. paku @ Rp. = Rp. 0.00
Rp. 0.00
Upah :
0.5000 Pekerja @ Rp. = Rp. 0.00
0.0250 Mandor @ Rp. = Rp. 0.00
Rp. 0.00
Rp. 0.00

8 . Langit-langit Formika/M2 An.Suppl.VIII+D.12


Bahan :
1.1000 M2 Formika @ Rp. = Rp. 0.00
0.0110 M3 rangka kayu @ Rp. = Rp. 0.00
0.0200 Kg. paku @ Rp. = Rp. 0.00
Rp. 0.00
Upah :
0.5000 Pekerja @ Rp. = Rp. 0.00
0.0250 Mandor @ Rp. = Rp. 0.00
Rp. 0.00
Rp. 0.00

9 . Balok gantung langit-langit kayu kls.I An.F.1/M3


Bahan :
1.1000 M3 kayu kls. I @ Rp. = Rp. 0.00
Rp. 0.00
Upah :
15.0000 Tukang kayu @ Rp. = Rp. 0.00
1.5000 Kepala tukang @ Rp. = Rp. 0.00
5.0000 Pekerja @ Rp. = Rp. 0.00
0.2500 Mandor @ Rp. = Rp. 0.00
Rp. 0.00
Rp. 0.00

10 . Balok gantung langit-langit kayu kls.II An. F.1/M3


Bahan :
1.1000 M3 kayu kls. II @ Rp. = Rp. 0.00
Rp. 0.00
Upah :
15.0000 Tukang kayu @ Rp. = Rp. 0.00
1.5000 Kepala tukang @ Rp. = Rp. 0.00
5.0000 Pekerja @ Rp. = Rp. 0.00
0.2500 Mandor @ Rp. = Rp. 0.00
Rp. 0.00
Rp. 0.00