Professional Documents
Culture Documents
M. Emb
M. Emb
M. Emb
DESIGN . DEK-593 M. EMB L.K. 3817 COLOR GREEN QTY 1917 SIZE 11
GGT 1 PO Costing
PART OF CONSUMPTION QTY PER HEAD CONSUMTION
NO. OF PART SIZE QTY PER SIZE RATE STITCHES RATE Emb Qty Rate AMOUNT AVG COST COST
ARTICLE GGT GGT WORK MTR/UNIT
FRONT 0.82 1 2,3,4,5 561.70 685 3 0.0013 65,616 255.90 561.70 255.90 143,740.38 0.82
FRONT 0.94 1 6,7,8,9 658.00 700 3 0.0013 72,904 284.33 658.00 284.33 187,086.24 0.94 261.97
284.80
FRONT 1.03 1 10,11,12 547.96 532 3 0.0013 80,190 312.74 547.96 312.74 171,369.56 1.03
SEQ 1.00 1 ALL 1,917.00 1917 1 0.03 761 22.83 1,917.00 22.83 43,765.11 1.00 22.83
Total Amount -Rs. 545,961.29
Per Article
PART OF QTY PER HEAD No of Machine No. Of Per Machine Avg. Prod. Per Requied No. of Finishing Complet
Design LK. NO. STITCHES Total Stitches Meter / Sampling Sizing No.
ARTICLE SIZE WORKING Round Head Machine Stitches Day Days Days Of Days
Pcs
DEK-593 3817 FRONT 1,767.66 3 72,904 221 16,108,686 24 8 2 8,054,343 750,000.00 10.74 3.00 14
ON PRODUCTION DATE CLOSE ARTICLE DATE
1/5/2023 1/18/2023
EMBRO
DESIGN . DWSEK-902 M. EMB
GGT
HEAD
RATE STITCHES RATE Emb Qty Rate
WORKING
_____________
1528 SIZE 5
PO Costing
CONSUMTIO
AMOUNT AVG COST COST
N MTR/UNIT
9
EMBROIDERY COSTING SUMMARY
DESIGN . DWSEK-1008 M. EMB L.K. 5880 PINK COLOUR QTY 1661 SIZE 5
GGT 1 PO Costing
CONSUMTI
QTY PER HEAD
PART OF ARTICLE CONSUMPTION GGT NO. OF PART SIZE QTY PER SIZE RATE STITCHES RATE Emb Qty Rate AMOUNT ON AVG COST COST
GGT WORKING
MTR/UNIT
FRONT 0.64 1 XS 79.00 179 3 0.0015 117,283 527.77 114.56 527.77 60,461.73 0.64
FRONT 0.71 1 S 261.00 261 3 0.0015 120,778 543.50 185.31 543.50 100,716.17 0.71
FRONT 0.74 1 M 521.00 521 3 0.0015 122,533 551.40 385.54 551.40 212,586.18 0.74 417.28
507.16
FRONT 0.78 1 L 521.00 521 3 0.0015 125,835 566.26 406.38 566.26 230,115.72 0.78
FRONT 0.82 1 XL 179.00 179 3 0.0015 135,082 607.87 146.78 607.87 89,223.01 0.82
LACE 0.09 21 ALL 1,661.00 1661 3 0.0015 10,568 998.68 3,139.29 47.56 149,292.08 1.89 89.88
Total Amount -Rs. 842,394.89
`
Article
PART OF QTY PER HEAD Machine Per Meter / No. Of Per Machine Requied Finishing
Design LK. NO. STITCHES No of Round Total Stitches Avg. Prod. Per Day Sampling Sizing Complet No.
ARTICLE SIZE WORKING Head Pcs Machine Stitches No. of Days Days
Of Days
FRONT 1239 3 122,533 155 18,977,298 24 8 2 9,488,649 650,000.00 14.60
DWSEK-1008 5880 - - 4 22
LACE 3139 3 10,568 392 4,147,002 24 8 2 2,073,501 650,000.00 3.19
START DATE PRODUCATION
31/03/2023 20/04/2023
DESIGN . DWSEK-1013 M.EMB MERCHAND
GGT DANISH
PART OF HEAD
Design LK. NO. QTY PER SIZE STITCHES
ARTICLE WORKING
HEAD
WORKING RATE STITCHES RATE Emb Qty Rate
85 12,232,780.00 24 12 1 12,232,780
137.125 1,423,906.00 24 8 1 1,423,906
________________________________
1015 SIZE 5
Costing
CONSUMTI
AMOUNT ON AVG COST COST
MTR/UNIT
53,450.50 1.00
161,794.70 1.00 340.64
394.47
130,508.70 1.00
54,638.12 1.08 53.83
400,392.01
Article
Avg. Prod. Per Requied No. Finishing
Sampling Sizing Complet
Day of Days Days
No. Of Days
600,000 20.39
3 18
700,000 2.03