Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GENERAL NOTES AND SPECIFICATIONS:

1. ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THESE PLANS
AND SPECIFICATIONS. THE APPLICABLE PROVISIONS OF THE LATEST EDITION OF
PHILIPPINE ELECTRICAL CODE (PEC). THE RULES AND REGULATIONS OF THE LOCAL
ENFORCING AUTHORITY AND THE REQUIREMENTS OF THE LOCAL POWER AND TELEPHONE
COMPANIES. THE ELECTRICAL WORK SHALL BE UNDER THE IMMEDIATE SUPERVISION OF
A DULY REGISTERED ELECTRICAL ENGINEER.
2. ALL MATERIALS TO BE USED SHALL BE NEW AND OF THE APPROVED TYPE FOR BOTH
LOCATION AND PURPOSE INTENDED.
3. SERVICE SHALL BE 230 VOLTS, 60 HZ, 3 WIRES, 1 PHASE UNLESS OTHERWISE
SPECIFIED.
4. DISTRIBUTION PANEL SHALL BE READILY ACCESSIBLE, THAT NO OBSTACLE SHOULD
BLOCK ACCESS TO THE PANEL.
5. NO ALTERNATIONS OR CHANGES SHALL BE ALLOWED UNLESS APPROVED BY A DULY
PROFESSIONAL ELECTRICAL ENGINEERS OR OWNER’S REPRESENTATIVE.
6. WIRING METHODS SHALL BE RIGID METAL CONDUIT (RMC) SHALL BE USED FOR SERVICE
ENTRANCE AND FOR EXPOSED INSTALLATIONS.POLYVINYL CHLORIDE (PVC) SHALL BE
USED GENERALLY FOR ALL INSTALLATIONS, EMBEDDED IN CONCRETE, OR CONCEALED
INSIDE CEILING.
7. WORK SHALL NOT BE STARTED UNLESS A VALID WIRING PERMIT HAS BEEN SECURED
FROM THE GOVERNMENT AUTHORITIES CONCERNED HAVING JURISDICTION OVER THE
PROJECT.
8. ALL ELECTRICAL EQUIPMENT SHALL BE PROPERLY GROUNDED IN ACCORDANCE WITH THE
REQUIREMENTS OF THE PHILIPPINE ELECTRICAL CODE.

NAME TITLE SHEET CONTENT SHEET NUMBER


ALAIJAH DONEETHA KYE D. RAMOS
BSCE - CE21S4 ELECTRICAL SYSTEM DESIGN OF GENERAL NOTES
DATE
SEPTEMBER 21, 2022
A SINGLE STOREY RESIDENTIAL
BUILDING AND SPECIFICATION 4/7

You might also like