THE DOW CHEMICAL COMPANY P/PM PROCEDURE

ELECTRICAL G7M-0010-23
GLOBAL 14-JAN-2008
Page 1 of 2
i
CT RATIO TEST

This procedure is to familiarize technicians with means to perform a ratio


Scope
test on current transformers.

CURRENT TRANSFORMER RATIO. The current applied to the primary


Definition
of a current transformer divided by the current flowing from the secondary.

ii
Special Equipment 1. Calibrated Current Transformer Test Set or the equipment listed below:

2. A source of AC current in the top one-third of the current transformer


(CT) being tested.

3. Calibrated (within one year) ammeters (2) with a range that will give
approximately 1/2 scale readings of the primary and secondary
currents.

iii
Procedure

Step Action

1 For CT test sets, follow the manufacturers instructions associated


with the test set, otherwise proceed to step 2.

2 Remove all burden or shorting devices from the CT being tested


and record the current flowing from the CT secondary.

3 Install ammeters in primary and secondary circuits (ensure


secondary circuit is complete –MUST NOT BE OPEN
CIRCUITED!). Warning: Dangerous high voltage can be
developed on open circuited CT secondaries!

4
Inject and record a primary current in the CT. This current should
be approximately in the upper 1/3 of the CT primary current rating.
It may be necessary to install several wraps of primary wire
through the core of the CT primary to obtain the desired secondary
current on CT’s with high ratios.

5 Divide the primary current by the secondary and record this ratio.

DOW RESTRICTED - For internal use only


THE DOW CHEMICAL COMPANY P/PM PROCEDURE
ELECTRICAL G7M-0010-23
GLOBAL 14-JAN-2008
Page 2 of 2

6 Discuss the acceptance testing and applicable safety standards


with Owner/Owner Rep. and workmen to insure the safety of all
personnel. It should not be done in hazardous atmospheres and
requires a welding-type permit in these areas.

Reference Material 1. The Nameplate Ratio of The CT

2. Current transformer test form G7M-0020-43

i
14-JAN-2008; MOC N/A; By: Karl Beaty; Supersedes Issue Date 19-JAN-2005; Corrected table
format for STEPS 1 – 3. Added hyperlink to referenced practice. No technical update.
ii
19-JAN-2004, MOC 2005_02571, By: Walter Selle, Supercedes Issue Date 05-MAR-1999, SPECIAL
EQUIPMENT – Added new 1 and 2. Renumbered
iii
19-JAN-2004, MOC 2005_02571, By: Walter Selle, Supercedes Issue Date 05-MAR-1999,
PROCEDURE – Added new STEPS 1, 2 and 3. Modified STEP 4. Renumbered

DOW RESTRICTED - For internal use only