9 More Information
9 More Information
INFORMATION
9 More Info
9 MORE INFORMATION
Introduction
This Chapter provides an introduction to some areas of further information which is useful for managing Airbus Projects.
e.g. Optimise
e.g. Power 8 R&T IS/IT CapEx
Inspection
e.g. iShare
e.g. SHAPE e.g. A Project e.g. Clean Sky e.g. A350 FAL
9 More Info
Deployment
546
9.1 Capital Expenditure (CapEx) ............................................................................................................................................ 548
9.2 Engineering Resource Management ........................................................................................................................... 550
Future
Programmes Military Aircraft Programmes
Transport
A30X A400M Military Derivatives and Mission
Series MRTT CN-235
Production
A400M C-295
P3
Series Mod
to CN-235
Series Mod
to C-295
9 More Info
CAE Model to Vacate
Introduction
A Capital Expenditure (CapEx) is incurred when a business spends money either to buy fixed assets or to add value to an
existing fixed asset with a useful life that extends beyond the taxable year.
Capital Expenditure Projects (CapEx) are expenditures creating future benefits. CapEx is used to acquire or upgrade physical
assets such as equipment, property or industrial buildings (see Figure 91-1). In accounting, a capital expenditure is added to an
asset account (“capitalised”) thus increasing the asset’s basis (the cost or value of an asset as adjusted for tax purposes).
In order to harmonise and integrate the best practices across Airbus, a central CapEx team provides up-front guidance to the
business, allowing the business to proceed in the right direction. The guidance is based on the CapEx process shown in
Figure 91-2.
INVESTMENTS TOOLING
548
An essential part of the process is the approval process in which key stakeholders ensure that the optimum investment solution
is realised for an existing and defined problem.
Procurement C
oc
Single Approval
an
9 More Info
ure
Le
me
B Project MFT:
nt
Solution
B
Pronag
Ma
Implemented
an l
ce
Fin oca
jec er
A A
t
Programme
Project MFT
PO Approval Prepares CapEx File
MFT: Multi Functional Team MPR: Master Plan Review PO: Purchase Order
549
9 MORE INFORMATION
9.2 ENGINEERING RESOURCE MANAGEMENT
Aircraft Projects are often competing for the same key resources. It is a key challenge to put the right resources on to a Project
at the right time, working on the right tasks, in order to deliver milestones on-time, on cost and on-quality, securing Project
deliverables and financial performance.
To avoid inconsistent and unfeasible Project plans it is important to synchronise Workforce Adaptation Plans with the planning
process, and to do so across multiple Projects.
Multi-Project
Workload
Baselining
9 More Info
Workload/ Workforce
Workforce Planning and
Matching Development
Workforce
Capabilities Agreed Workforce
Assessment Adaptation Plan
SUPPLY
550
The main elements of the process are described below and are shown in Figure 92-1.
• Multi-Project Workload Baselining is the output of Project Management processes in terms of workload profiles, including
their related risks and buffers, translating Work Packages of different Projects into estimated workload needs. It is the
aggregation of single Project outputs, covering running as well as any new and future Projects.
Workload estimations must be based on robust assumptions, with possible updates on demand. The workload needs from
multiple Projects are consolidated twice a year in order to prepare the Workforce/Workload Matching. The workload needs are
split by skill group, with estimates per quarter for the current and following years.
• Workforce Capabilities Assessment is undertaken by Functions which contribute to Projects, generating workforce profiles,
including their related uncertainties and buffers. The workload profiles from various Functions are consolidated twice a year in
order to prepare the Workforce/Workload Matching.
• Workload/Workforce Matching is the “core” of the overall process, in which supply and demand information is put into a
single picture allowing:
- sharing between the process stakeholders
- validation of the feasibility of the a Project's workload requests
- validation of the resources and subcontracting plan.
Workload/Workforce Matching is conducted twice a year (March-May and September-November), with a top management
decision body (the Program Engineering Review, PER) as the process owner. The key objective is to find the best solution from
an overall Airbus perspective rather than Projects or Functions trying to optimise individually. The main output of the Workload/
Workforce Matching is the agreed Workforce Adaptation Plan for internal airbus workforce and the adaptation of the
subcontracting plan as well (comprising decisions on recruitment plans, main mobilities, reallocations, etc.).
• Workforce Planning and Development implements the actions defined in the Workforce Adaptation Plan, including resource
transfers, recruitments, training activities, and individual resource allocations to Projects.
APPLICABLE DOCUMENTS
9 More Info
Type Title Reference Access
Policy EADS Policy for Multi-Programme Engineering EADS-CDS-037 Airbus People/
Resource Management P&PM
Management
Community/
EADS Policies
551
552
10 Reference