Professional Documents
Culture Documents
Rebar Schedule 0416
Rebar Schedule 0416
Rebar Schedule 0416
Current Status
Re-Bar
13 16 19 22 25 29 32
Stock (Btg) 2,000 15 0 113 39 100 9
Required (Btg) 2,459 134 33
(Btg) -459 -119 -33 113 39 100 9
Balance
(Ton) -5.74 -2.26 -0.88 4.05 1.80 6.22 0.68
-237
-2.96
0.91
T. Length 1,943
Precast (50%) 1,000
Precast 6 m ( Unit) 167
Overlap Rebar (M) 0.71
Qty Overlap (Ea) 4,000.00
T. Length Overlap (M) 2,840.00
Length rebar (m/btg) 12
Btg 237
Remain Fabrication
Diameter Rebar
Area Unit
D13 D16 D19 D22 D25 D29 D32
NCC-CSS-D-101
NCC-CSS-D-102 101 4,848.96
NCC-CSS-D-103
NCC-CSS-D-201
NCC-CSS-D-202
102 6,419.57 814.03 213.71
NCC-CSS-D-203
NCC-CSS-MH-201
NCC-CSS-D-302
NCC-CSS-D-303 103 4,763.13
NCC-CSS-D-304
NCC-CSS-D-401
NCC-CSS-D-401-1
NCC-CSS-D-401-2
NCC-CSS-D-401-3
NCC-CSS-D-401-4
NCC-CSS-D-401-5
104 8,868.24 490.04 213.71
NCC-CSS-D-401-6
NCC-CSS-D-402
NCC-CSS-D-403
NCC-CSS-D-404
NCC-CSS-D-405
NCC-CSS-MH-401
NCC-CSS-D-504
NCC-CSS-D-505 105 2,016.13 491.81 213.71
NCC-CSS-MH-502
NCC-CSS-D-601
NCC-CSS-D-602 106 2,937.13 676.38 213.71
NCC-CSS-MH-601
Kg 30,748.77 2,546.42 880.49
Total Kg/Btg 12.51 18.94 26.71
Btg 2,459 134 33
TOTAL LENGTH D 10 = - meter UNIT WEIGHT = 0.617 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 13 = 4,652.766 meter UNIT WEIGHT = 1.042 kg/m TOTAL WEIGHT = 4848.96 kg
TOTAL LENGTH D 16 = - meter UNIT WEIGHT = 1.579 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 19 = - meter UNIT WEIGHT = 2.226 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL
TOTAL LENGTH D 22 = - meter UNIT WEIGHT = 2.985 kg/m TOTAL WEIGHT = 0.00 kg
WEIGHT
REBAR TOTAL LENGTH D 25 = - meter UNIT WEIGHT = 3.854 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 29 = - meter UNIT WEIGHT = 5.186 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 32 = - meter UNIT WEIGHT = 6.315 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 36 = - meter UNIT WEIGHT = 7.992 kg/m TOTAL WEIGHT = 0.00 kg
GRAND TOTAL = 4848.96 kg
BAR BENDING SCHEDULE FOR WORK MAIN U-DITCH UNIT 102 Based On Drawing Date : 15-May-23
Rev. :1
TOTAL LENGTH D 10 = - meter UNIT WEIGHT = 0.617 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 13 = 6,159.833 meter UNIT WEIGHT = 1.042 kg/m TOTAL WEIGHT = 6419.57 kg
TOTAL LENGTH D 16 = 515.644 meter UNIT WEIGHT = 1.579 kg/m TOTAL WEIGHT = 814.03 kg
TOTAL LENGTH D 19 = 96.000 meter UNIT WEIGHT = 2.226 kg/m TOTAL WEIGHT = 213.71 kg
TOTAL
TOTAL LENGTH D 22 = - meter UNIT WEIGHT = 2.985 kg/m TOTAL WEIGHT = 0.00 kg
WEIGHT
REBAR TOTAL LENGTH D 25 = - meter UNIT WEIGHT = 3.854 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 29 = - meter UNIT WEIGHT = 5.186 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 32 = - meter UNIT WEIGHT = 6.315 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 36 = - meter UNIT WEIGHT = 7.992 kg/m TOTAL WEIGHT = 0.00 kg
GRAND TOTAL = 7447.31 kg
BAR BENDING SCHEDULE FOR WORK MAIN U-DITCH UNIT 103 Based On Drawing Date : 15-May-23
Rev. :1
TOTAL LENGTH D 10 = - meter UNIT WEIGHT = 0.617 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 13 = 4,570.413 meter UNIT WEIGHT = 1.042 kg/m TOTAL WEIGHT = 4763.13 kg
TOTAL LENGTH D 16 = - meter UNIT WEIGHT = 1.579 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 19 = - meter UNIT WEIGHT = 2.226 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL
TOTAL LENGTH D 22 = - meter UNIT WEIGHT = 2.985 kg/m TOTAL WEIGHT = 0.00 kg
WEIGHT
REBAR TOTAL LENGTH D 25 = - meter UNIT WEIGHT = 3.854 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 29 = - meter UNIT WEIGHT = 5.186 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 32 = - meter UNIT WEIGHT = 6.315 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 36 = - meter UNIT WEIGHT = 7.992 kg/m TOTAL WEIGHT = 0.00 kg
GRAND TOTAL = 4763.13 kg
BAR BENDING SCHEDULE FOR WORK MAIN U-DITCH UNIT 104 Based On Drawing Date : 15-May-23
Rev. :1
TOTAL LENGTH D 10 = - meter UNIT WEIGHT = 0.617 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 13 = 8,509.427 meter UNIT WEIGHT = 1.042 kg/m TOTAL WEIGHT = 8868.24 kg
TOTAL LENGTH D 16 = 310.412 meter UNIT WEIGHT = 1.579 kg/m TOTAL WEIGHT = 490.04 kg
TOTAL LENGTH D 19 = 96.000 meter UNIT WEIGHT = 2.226 kg/m TOTAL WEIGHT = 213.71 kg
TOTAL
TOTAL LENGTH D 22 = - meter UNIT WEIGHT = 2.985 kg/m TOTAL WEIGHT = 0.00 kg
WEIGHT
REBAR TOTAL LENGTH D 25 = - meter UNIT WEIGHT = 3.854 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 29 = - meter UNIT WEIGHT = 5.186 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 32 = - meter UNIT WEIGHT = 6.315 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 36 = - meter UNIT WEIGHT = 7.992 kg/m TOTAL WEIGHT = 0.00 kg
GRAND TOTAL = 9571.99 kg
BAR BENDING SCHEDULE FOR WORK MAIN U-DITCH UNIT 105 Based On Drawing Date : 15-May-23
Rev. :1
TOTAL LENGTH D 10 = - meter UNIT WEIGHT = 0.617 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 13 = 1,934.560 meter UNIT WEIGHT = 1.042 kg/m TOTAL WEIGHT = 2016.13 kg
TOTAL LENGTH D 16 = 311.532 meter UNIT WEIGHT = 1.579 kg/m TOTAL WEIGHT = 491.81 kg
TOTAL LENGTH D 19 = 96.000 meter UNIT WEIGHT = 2.226 kg/m TOTAL WEIGHT = 213.71 kg
TOTAL
TOTAL LENGTH D 22 = - meter UNIT WEIGHT = 2.985 kg/m TOTAL WEIGHT = 0.00 kg
WEIGHT
REBAR TOTAL LENGTH D 25 = - meter UNIT WEIGHT = 3.854 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 29 = - meter UNIT WEIGHT = 5.186 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 32 = - meter UNIT WEIGHT = 6.315 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 36 = - meter UNIT WEIGHT = 7.992 kg/m TOTAL WEIGHT = 0.00 kg
GRAND TOTAL = 2721.65 kg
BAR BENDING SCHEDULE FOR WORK MAIN U-DITCH UNIT 106 Based On Drawing Date : 15-May-23
Rev. :1
TOTAL LENGTH D 10 = - meter UNIT WEIGHT = 0.617 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 13 = 2,818.294 meter UNIT WEIGHT = 1.042 kg/m TOTAL WEIGHT = 2937.13 kg
TOTAL LENGTH D 16 = 428.452 meter UNIT WEIGHT = 1.579 kg/m TOTAL WEIGHT = 676.38 kg
TOTAL LENGTH D 19 = 96.000 meter UNIT WEIGHT = 2.226 kg/m TOTAL WEIGHT = 213.71 kg
TOTAL
TOTAL LENGTH D 22 = - meter UNIT WEIGHT = 2.985 kg/m TOTAL WEIGHT = 0.00 kg
WEIGHT
REBAR TOTAL LENGTH D 25 = - meter UNIT WEIGHT = 3.854 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 29 = - meter UNIT WEIGHT = 5.186 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 32 = - meter UNIT WEIGHT = 6.315 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 36 = - meter UNIT WEIGHT = 7.992 kg/m TOTAL WEIGHT = 0.00 kg
GRAND TOTAL = 3827.23 kg
BAR BENDING SCHEDULE FOR WORK MAIN U-DITCH UNIT 102 Based On Drawing Date : 15-May-23
Rev. :1
TOTAL LENGTH D 10 = - meter UNIT WEIGHT = 0.617 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 13 = 29.120 meter UNIT WEIGHT = 1.042 kg/m TOTAL WEIGHT = 30.35 kg
TOTAL LENGTH D 16 = 515.644 meter UNIT WEIGHT = 1.579 kg/m TOTAL WEIGHT = 814.03 kg
TOTAL LENGTH D 19 = 96.000 meter UNIT WEIGHT = 2.226 kg/m TOTAL WEIGHT = 213.71 kg
TOTAL
TOTAL LENGTH D 22 = - meter UNIT WEIGHT = 2.985 kg/m TOTAL WEIGHT = 0.00 kg
WEIGHT
REBAR TOTAL LENGTH D 25 = - meter UNIT WEIGHT = 3.854 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 29 = - meter UNIT WEIGHT = 5.186 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 32 = - meter UNIT WEIGHT = 6.315 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 36 = - meter UNIT WEIGHT = 7.992 kg/m TOTAL WEIGHT = 0.00 kg
GRAND TOTAL = 1058.09 kg
BAR BENDING SCHEDULE FOR WORK MAIN U-DITCH UNIT 104 Based On Drawing Date : 15-May-23
Rev. :1
TOTAL LENGTH D 10 = - meter UNIT WEIGHT = 0.617 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 13 = - meter UNIT WEIGHT = 1.042 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 16 = 310.412 meter UNIT WEIGHT = 1.579 kg/m TOTAL WEIGHT = 490.04 kg
TOTAL LENGTH D 19 = 96.000 meter UNIT WEIGHT = 2.226 kg/m TOTAL WEIGHT = 213.71 kg
TOTAL
TOTAL LENGTH D 22 = - meter UNIT WEIGHT = 2.985 kg/m TOTAL WEIGHT = 0.00 kg
WEIGHT
REBAR TOTAL LENGTH D 25 = - meter UNIT WEIGHT = 3.854 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 29 = - meter UNIT WEIGHT = 5.186 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 32 = - meter UNIT WEIGHT = 6.315 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 36 = - meter UNIT WEIGHT = 7.992 kg/m TOTAL WEIGHT = 0.00 kg
GRAND TOTAL = 703.75 kg
BAR BENDING SCHEDULE FOR WORK MAIN U-DITCH UNIT 105 Based On Drawing Date : 15-May-23
Rev. :1
TOTAL LENGTH D 10 = - meter UNIT WEIGHT = 0.617 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 13 = - meter UNIT WEIGHT = 1.042 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 16 = 311.532 meter UNIT WEIGHT = 1.579 kg/m TOTAL WEIGHT = 491.81 kg
TOTAL LENGTH D 19 = 96.000 meter UNIT WEIGHT = 2.226 kg/m TOTAL WEIGHT = 213.71 kg
TOTAL
TOTAL LENGTH D 22 = - meter UNIT WEIGHT = 2.985 kg/m TOTAL WEIGHT = 0.00 kg
WEIGHT
REBAR TOTAL LENGTH D 25 = - meter UNIT WEIGHT = 3.854 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 29 = - meter UNIT WEIGHT = 5.186 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 32 = - meter UNIT WEIGHT = 6.315 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 36 = - meter UNIT WEIGHT = 7.992 kg/m TOTAL WEIGHT = 0.00 kg
GRAND TOTAL = 705.52 kg
BAR BENDING SCHEDULE FOR WORK MAIN U-DITCH UNIT 106 Based On Drawing Date : 15-May-23
Rev. :1
TOTAL LENGTH D 10 = - meter UNIT WEIGHT = 0.617 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 13 = - meter UNIT WEIGHT = 1.042 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 16 = 428.452 meter UNIT WEIGHT = 1.579 kg/m TOTAL WEIGHT = 676.38 kg
TOTAL LENGTH D 19 = 96.000 meter UNIT WEIGHT = 2.226 kg/m TOTAL WEIGHT = 213.71 kg
TOTAL
TOTAL LENGTH D 22 = - meter UNIT WEIGHT = 2.985 kg/m TOTAL WEIGHT = 0.00 kg
WEIGHT
REBAR TOTAL LENGTH D 25 = - meter UNIT WEIGHT = 3.854 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 29 = - meter UNIT WEIGHT = 5.186 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 32 = - meter UNIT WEIGHT = 6.315 kg/m TOTAL WEIGHT = 0.00 kg
TOTAL LENGTH D 36 = - meter UNIT WEIGHT = 7.992 kg/m TOTAL WEIGHT = 0.00 kg
GRAND TOTAL = 890.09 kg