Portal RATOL & Rates PreMo

CAWANGAN KONTRAK DAN UKUR BAHAN 14.07.2023

Work Item Unit Overall Average (RM)


COLD WATER AND SOIL PLUMBING LOT Location Range (RM) Average (RM) RM 5000.00
SUCTION TANK
B 5000.00 - 5000.00 5000.00
Composite stainless steel compartment water tank as
specified complete with 100mm diameter overflow and
scour pipe, float valve, access manhole, electrode
sensor, level indicator, internal/external cat ladder
(stainless steel) and all accessories and fittings of
approved manufacturer to JBA/local authority
approval, hoisted and placed in position accordance to
manufacturer's instruction
Miscellaneous
Painting for cold water section and fire fighting ficting
section and all civil works necessary to complete
installation of the above system include coring of floor,
wall, hacking, digging, drilling, cart away debris, etc
and making good to SO satisfaction.
PAVEMENT WORKS nr Location Range (RM) Average (RM) RM 292.50
FLEXIBLE PAVEMENT
A 292.50 - 292.50 292.50
TREATMENT TO EXISTING PAVEMENT
In-situ / Field Testing
Including CBR, coring & marshalll, density and
roadline test

1/2
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 14.07.2023

Nota Catatan
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur

u.p: En Husnan Husin


Tel: 03-26161111
Email: husnan@jkr.gov.my

2/2