Professional Documents
Culture Documents
SITUASI DAN LONG Alternatif 3
SITUASI DAN LONG Alternatif 3
E =40.600
E =40.659
E =39.834
E =39.347
E =39.323
E =39.296
E =39.037
-2.43% -2.05% +0.98%
-1.30% -0.94% -0.45% +0.50%
BIDANG PERSAMAAN
ELEVASI RENCANA
41.052
40.349
39.915
39.555
39.194
38.965
38.736
38.657
38.578
38.504
38.430
38.347
38.264
38.348
38.431
38.533
38.634
38.684
38.735
38.835
38.935
39.037
39.140
39.342
39.544
39.912
40.281
40.470
40.659
40.783
ELEVASI EXISTING
STA 01+694 01+700 01+725 01+750 01+775 01+800 01+825 01+850 01+875 01+900 01+925 01+950 01+975 02+000 02+025 02+044
JARAK 6.00 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 6.50
DETAIL A
Beton FS 45 t= 30.5 cm
Beton Kurus t= 10 cm
Lapis Pondasi Agregat Kelas A t = 30 cm