Professional Documents
Culture Documents
121506-ACS-NBS-MI-DPI-SD-063D R1 General - Site Plan Crossing Road 22040..
121506-ACS-NBS-MI-DPI-SD-063D R1 General - Site Plan Crossing Road 22040..
Package No. : 03 Main Con Package Title : Shop Drawing Date Issued : 07 April 2022
REFER TO SD 063D R0
SUBMITTED BY Name : Arif Basuki Position : Eng. Manager Signature Date 07 April 2022
Note : - All drawings, documents and samples must have a unique number and be prefixed with the S/C package number
URGENCY : TOP PRIORITY (ASAP) PRIORITY (WITHIN 3 DAYS) REGULAR (WITHIN 6 DAYS)
APPROVAL STATUS : “A” = NO COMMENT “B” = COMMENTS AS NOTED “C” = REJECTED – RE-SUBMIT
CONTROL BOX
EL +189.00
INDUSTRIAL PARK Provide MH to drain rain water from
10000
EL +187.00
12000 18000 U-decker - rain grating no required
35
56 1:100 1:50
6000
55
6000
54 8 9 29
29
6000
7000
1:50
52
9000
9000
2 1a
26 6000 6000
26
6000
10 EL +189.00
12 36a UP
51 22 4 3
6000
50 23
6000
11
3RB2
3RB2
3RB2
3RB3 3RB3
3RB3
49
WB
WB
3RB1
3RB1
WB
3RB1
19
WB
6000
5
A4 A4
3RB3 3RB3 3RB3
A2 A2
1:30 1:30
48
WB
WB
WB
EL +190.20 EL +190.30
6000
WB
RB_Ø12
13
(TYP.)
3RB3
3RB3
3RB3
47 03 9000
FIRE HYDRANT DN150
6000
6000
46
3RB2
3RB4 3RB1
EL +190.15 WB
WB
3RB3
7000
WB
WB
6000
WB
WB
3RB1
3RB1
3RB1
3RB1
3RB1
EL +190.00 3RB1 3RB1
45 06
3RB3
33
3RB1
EL +190.20
3RB1
3RB1
6000
WB WB
3RB1
WB
WB
WB
WB
3RB3
3RB2 3RB2 3RB2
3RB2
EL +190.00
44
WB WB
WB
02
WB WB
X2
WB
6000
3RB3
3RB1 3RB1
24 19 WB
RB_Ø19
TYP.
WB
WB
X2 WB
3RB1
3RB1
3RB1
3RB1
43 PLN
WB WB
3RB3
3RB1 3RB1
20.0
12000
42 25
6000
41 25 20 1 N
6000
40 29 04 18
EL +191.00
EL +190.15
6000
9000
38
FIRE HYDRANT DN150
11
33
TRUE NORTH
6000
37
6000
36 05
6000
35 23 EL +191.00
01
6000
EL +189.50 EL +191.00
15 EL +190.00
34 14a 27 21
6000
37
33 7000
6000
Provide MH 21
32
6000
31 08
6000
30 28
6000
SETBACK LINE
SETBACK LINE
14 FIRE FIGHTING ACCESS
29 22
330000
6000
GUTTER 600x600
WITH COVER GRATING
32
28 24
6000
26 25
?
6000
25 10
6000
24
6000
23 SCEDULE LIST CROSSING ROAD SCEDULE LIST CROSSING ROAD SCEDULE LIST CROSSING ROAD 01 ISSUED FOR APPROVAL 07-04-2022
6000
CROSS U-DITCH U-DECKER CROSS U-DITCH U-DECKER CROSS U-DITCH U-DECKER PIPE Pemilik/Owner :
21 (BY OTHER) NO. SIZE SIZE
GROUND
NO. SIZE SIZE
GROUND
NO. SIZE SIZE SIZE
6000
PIPE FIRE WATER ELECTRONIC ELECTRIC WASTE INTERNET WASTE DPI PIPE FIRE WATER ELECTRONIC ELECTRIC WASTE INTERNET FIRE WATER ELECTRONIC ELECTRIC WASTE COMP. RO EFF. CHWS/R
Ø150
27
19 ? NO.1a PVC SLEEVE Ø100 NO.14a PVC SLEEVE Ø75 NO.27 DELETE
6000
DELETE
EL +190.70
6000
NO.3 500 x 500 Ø150 Ø100 Ø100 Ø100 NO.16 500 x 500 Ø100 Ø100 NO.29 DELETE
17 15
6000
16 14 13 NO.4 500 x 500 Ø150 Ø35 Ø100 Ø100 NO.17 500 x 500 Ø100 Ø100 NO.30a 500 x 500 DN150 Ø100 DN50 DN100
6000
DELETE Proyek/Project :
EL +191.00
14 BV
BV
CV
NO.7 800 x 800 Ø150 Ø100 Ø100 Ø75 NO.20 DELETE NO.30b 500 x 500 DN300
6000
CV
BV CV
SUA SECTION 1
FOR WWTP EFFLUENT
(open gutter)
6000
SUA SECTION 3
SUA SECTION 4
with NI 29 EL +190.70
500x500 (x3) WITH HD COVER
NO.24 600 x 600 DN150 Ø100 Ø100 DN80 NO.34 600 x 600 for future
6000
4000
SUA SECTION 2
GR
09
FOR
OU WW
ND TP
RC EFF
PLN cable
0 NT
- SLO
6000
PE
1%
NO.37 20 Kv cable
06 PT Meinhardt Indonesia
6000
Grha Tirtadi 3/F, Jalan Raden Saleh No.20 Jakarta 10430 - Indonesia
FLOWRATE 40 m3/h
05
FAT TRAP
04 16 18 Email : indo@meinhardt.co.id
6000
01 General Contractor
Gedung Menara Jamsostek, Lt.20
Jl. Jendral Gatot Subroto No.38
Jakarta 12170
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 Nama Gambar/Drawing Title
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000
600000 0. GENERAL
SITE PLAN
B1 D1 F1 H1 J1 L1 N1 P1 R1 T1 V1 X1 Z1 B2 D2 F2 H2 J2 L2 N2 P2 R2 T2 V2 X2 Z2 B3 D3 F3 H3 J3 L3 N3 P3 R3 T3 V3 X3 Z3 B4 D4 F4 H4 J4 L4 N4 P4 R4 T4 V4 CROSSING ROAD
A1 C1 E1 G1 I1 K1 M1 O1 Q1 S1 U1 W1 Y1 A2 C2 E2 G2 I2 K2 M2 O2 Q2 S2 U2 W2 Y2 A3 C3 E3 G3 I3 K3 M3 O3 Q3 S3 U3 W3 Y3 A4 C4 E4 G4 I4 K4 M4 O4 Q4 S4 U4 W4
SHOP DRAWING
Oleh/By. init. sign. Tanggal/Date
SITE PLAN CROSSING ROAD