201. Costs that are not directly related to the products or services of the project,
but are indirectly related to performing the project.
A. Intangible Costs
B. Sunk Cost
C. Tangible Costs
D. Indirect Costs
Answer:D
202. Relationship based on unrelated level of activity and past data of cost is
measured with help of
o m
A. cost estimation
. c
B. price estimation
te
C. unit estimation
a
D. production estimation
q M
Answer:A
c
M variations in a single activity level represents
203. In estimation of cost functions,
the
A. related total costs
B. related fixed cost
C. related variable cost
D. related per unit cost
Answer:A
206. In corporate costs, cost incurred to finance construction of new equipment are
classified as
A. treasury costs
B. discretionary costs
C. human resource management costs
D. corporate administration costs
Answer:A
208. The cost impact of a risk event occurring as a project proceeds through its life
cycle tends to
A. Slowly rise
B. Slowly drop
C. Drop sharply and then level out
D. Rise sharply and then level out
Answer:A
211. Listing goals of each existing and proposed project is first step in
A. Data Collection
B. Establishment of Project council
C. Prioritizing the projects
D. Identification of project categories
Answer:D
214. Which of the following is not correct about initial phase of a project?
A. The cost associated at the beginning of the project is highest.
B. Stakeholders have maximum influence during this phase
C. The highest uncertainty is at this stage of the project.
216. A clear hierarchy of objectives in the project definition would NOT normally
contain:
A. The purpose
B. An End result
C. Success criteria
D. Control mechanisms
Answer:D
218. The primary deliverable from the project identification and selection phase is
a:
A. schedule of specific IS development projects.
B. Statement of Work.
C. mission statement.
D. design strategy.
Answer:A
219. When classifying and ranking projects, which of the following refers to the
amount and type of resources the project requires and their availability?
A. Value chain availability
220. When classifying and ranking projects, which of the following refers to the
extent to which the project is viewed as helping the organization achieve its
strategic objectives and longterm goals?
A. Resource availability
B. Business placement
C. Strategic alignment
D. Potential benefits
Answer:C
226. The following are the most important points of a detailed system proposal
(i) who will supply and install the required equipment
(ii) cost-benefit analysis
(iii) comparison of alternative solutions
(iv) implementation plan
A. i, ii and iii
B. i, iii and iv
C. ii, iii and iv
D. ii and iii
Answer:C
231. The following assumptions are made in case of break even analysis, except
A. All fixed costs are fixed
B. All variable costs are fixed
C. The prices of input factors are constant
D. Volume of production and volumes of sales are equal
Answer:B
237. Which kind of standards are those that are set arbitrarily to reflect some level
of performance that is regarded as appropriate or reasonable?
A. Competitor performance standards
B. Target performance standards
C. Historical standards
D. Absolute performance standards
239. What approach is used to compare organisation operations with those of other
companies?
A. SWOT analysis
B. PERT analysis
C. Benchmarking
D. Competitor performance assessment
Answer:C
241. A comparison between operations or parts of operations that are within the
same total organisation is called:
A. Internal benchmarking
B. Competitive benchmarking
C. Non-competitive benchmarking
D. External benchmarking
Answer:A
243. Which of the following is regarded as a fundamental flaw in the whole concept
of benchmarking?
A. It limits improvements to currently accepted methods of operating.
B. It does not involve learning.
C. It limits critical thinking.
D. It is not a continuous process.
Answer:A
244. What matrix positions each factor according to its performance and its
importance?
A. Competitive forces matrix
B. Performance importance matrix
C. Importance performance matrix
D. Customer assessment matrix
Answer:C
245. What do the letter ‘D’ and ‘I’ stand for in Deming’s cycle of improvement?
A. Design and improve
B. Develop and implement
C. Design and implement
D. Define and improve
Answer:D
246. Ishikawa Diagrams are another name for what technique of improvement?
A. Cause-effect diagrams
B. Input-output analysis
C. Process maps
D. Scatter diagrams
Answer:A
249. Which of the following is not a tool and technique used in the process of Plan
Risk Responses
A. Contingent Response Strategies
B. Expert Judgment
C. Risk and Impact Matrix
D. Strategies for positive risks or opportunities
Answer:C
250. During which stage of Risk planning are modeling techniques used to
determine overall effects of risks on project objectives for high probability, high
impact risks?
A. Identify Risks
B. Plan Risk responses
C. Perform Qualitative risk analysis
D. Perform Quantitative risk analysis
Answer:D
252. You have just completed Qualitative Risk Analysis of the project. What
should you be doing next?
A. Plan Risk Management
B. Perform Quantitative Risk Analysis
C. Plan Risk Responses
D. Control Risks
Answer:B
255. Which of the following is not a tool or technique used during the Risk
Quantification Process?
A. Risk Categorization
B. Contingency planning
C. Probability and Impact Matrix
D. Risk Data Quality Assessment
Answer:B
259. Assembling project team and assigning their responsibilities are done during
which phase of a project management?
A. Initiation
B. Planning
C. Execution
D. Closure
Answer:A
261. The structure of a project will vary depending on the _________to provide.
A. benefits it is intended
B. Structure
C. Schedule
D. Assignment
Answer:A
262. A process that involves continuously improving and detailing a plan as more
detail become available is termed as
A. project analysis
B. project enhancing
C. progressive deliberation
D. progressive elaboration
Answer:D
267. .If any one factor of a project changes, _____ other factor(s) is/are likely to be
affected.
A. all
B. one
C. at least one
D. at most one
Answer:C
270. A horizontal bar chart that shows project tasks against a calendar is called
271. Which from the following represents the correct project cycle?
A. Planning?Initiating?Executing?Closing
B. Planning?Executing?Initiating?Closing
C. Initiating?Planning?Executing?Closing
D. Initiating?Executing?Planning?Closing
Answer:C
273. The statistical tool that depicts a project’s tasks and the relationships between
those tasks is known as
A. milestone
B. goal
C. Gantt chart
D. PERT chart
Answer:D
276. How the project work will be carried out, monitored, and controlled? These
questions are answered in which phase of the project management?
A. Initiating
B. Planning
C. Executing
D. Closing
Answer:B
277. The review of the successes and the mistakes is normally held during _____
phase.
A. initiation
B. planning
C. execution
D. closure
Answer:D
278. The business case and the justification for the project is determined during the
_____ phase.
A. initiation
B. planning
C. execution
D. closure
Answer:A
279. According to Olivier Mesly, the 4 P’s critical for the success of a project are:
A. plan, processes, people, policy
B. plan, processes, people, power
C. plan, processes, potential, policy
D. plan, processes, potential, power
283. Following are the phases of Project Management Life Cycle. Arrange them in
correct order Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection,
testing and delivery
A. 3-2-1-4
B. 1-2-3-4
C. 2-3-1-4
D. 4-3-2-1
Answer:A
287. Resorce requirement in project becomes constant while the project is in its
_____ progress stage.
A. 40 to 55%
B. 55 to 70%
C. 70 to 80%
D. 80 to 95%
Answer:D
288. The probability of completing the project can be estimated based upon the
____ .
A. Uniform distribution curve
B. Normal distribution curve.
C. U-shaped distribution curve
D. None of the above
Answer:B
289. In the initial stage of the project the probability of completing the project is
___ .
A. Zero
290. Each component of the software product is separately estimated and the
results aggregated to produce an estimate for the overall job.
A. Algorithmic model
B. Expert judgment
C. Bottom-up
D. Top down
Answer:C
297. Which of the following is responsible for the quality of the project
deliverables?
A. The project champion
B. The project team
C. Stakeholders
D. Customers
Answer:B
300. In quality management, which of the following is not an attribute of the cost of
nonconformance?
A. Loss of customers
B. Downtime
C. Safety measures
D. Rework
Answer:C