5G NSA RAN n78

Solution Description for Telcel


Department: AM KAD Wireless Solution Sales Department

Date: 03/18/2021

Security Level:
Telcel NR NSA Solution
Telcel 5G NSA RAN Solution
1. Telcel first phase of 5G RAN solution will be based on NSA Option 3x, where 4G core
network will be used and LTE B7 will be anchor frequency
• Control plane will ne handled by eNB
• User Plane will be mainly handled by gNB, however eNB will be able to process it as well
• gNB will determine whether to offload traffic from eNB or from the gNb based on the air
interface quality and RLC buffer of the LTE/5G. EPC+
Control plane
2. 64T64R, 32T32R and 8T8R Massive MIMO will be deployed depending on traffic User plane
scenarios. S1 S1

3. 100 MHz channel in Band-C. X2


LTE B7
• Spectrum to be available in Q3 2020. 5G NR
Master site
• Central Frequency ARFCN: 633334 Secondary site

4. 5G TDD n78 will not be deployed concurrently with 5G DSS n7.


UE
• If 5G DSS already present in site, then 5G TDD will replace 5G DSS.
• If any particular situation requires that 5G TDD and 5G DSS is implemented in the same
site, then 5G TDD and 5G DSS will share the same baseband board, UBBPg3b,
considering that the software release is SRAN17 or later.
3.45GHz 3.5GHz 3.55GHz 3.6GHz
NSA Option 3x

50 Mhz 50 Mhz 50 Mhz

Mexico Band C Spectrum Assignment 2020


3 Huawei Confidential
NR FDD n7 with DSS is not described in this document
Huawei 5G RAN Product Portfolio

BBU5900 UBBPg3b UBBPg3a


UMPTg2 C-Band: mmWave: 3x4x200 MHz 4T4R
TDD: 3x100 MHz 64T64R
FDD: 12x20 MHz 4T4R
• 25 Gbps Throughput UEs RRC Connected mode: 1200 C-Band:6x100 MHz
• GULN Throughput TDD DL/UL: 9/1.36 Gbps 64T64R/32T32R/8T8R
• 1588V2 / GPS Throughput FDD DL/UL: 900/450
Mbps

All in One 6x3x100M


AAU/RRU for Band C

GSM / UMTS / LTE FDD / 64T64R


Massive MIMO
LTE TDD / NB-IoT/ NR AAU5639w 64T64R
3.5GHz
50Gbps 2000W 240w
2x25Gbps Throughput Cooling Capacity RRU5258 8T8R 200MHz

Full Series
3.5GHz AAU5339w 32T32R
3.5GHz
High Output Power 240w
8x30w 200MHz
24Kg

4 Huawei Confidential
AAU/RRU Solution

5 Huawei Confidential
AAU 64T64R 5639w / 32T32R 5339w

Ports on the AAU CPRI Optical Fiber Connection of an optical fiber between a BBU and an AAU

(1) DLC connector


(2) Breakout cable
(3) Label on the breakout cable

3b

6 Huawei Confidential
8T8R RRU5258 (N ports) Antenna Connection
Ports on the RRU panels (N female connector)
Antenna port mapping for a low- Example connection to Huawei antenna
frequency TDD 8T8R RRU and ATD4516R8v08 (4.3-10 connectors)
Huawei TDD 8T8R passive antennas

It is recommended that Huawei 8T8R antennas or NGMN-compliant 8T8R


antennas be used. Using other antennas may result in mismatched
polarization antenna sequences, affecting cell coverage. NGMN stands for
Next Generation Mobile Network.

Antenna-RRU Port mapping:


ANT1 – p1.R+
ANT2 – p1.CR+
ANT3 – p1.CL+
ANT4 – p1.L+
ANT5 – p1.R-
ANT6 – p1.CR-
Initial RRU5258 to be deployed in Telcel network will have N-ports for
antenna connection due to availability reasons. In this case an adaptor ANT7 – p1.CL-
will be implemented to fit 4.3-10 connectors in jumper side. ANT8 – p1.L-
• RF coaxial connector: 50 ohm, straight Adaptor, 4.3-10(female)- CAL - CAL
N(male)
• Insertion loss 0.094 dB@3.5Ghz Adaptor 4.3/10 4.3-10 male connector jumpers (9
female to N male jumpers in total per sector)
(9 adaptors per
sector)
7 Huawei Confidential
8T8R RRU5258 (4.3/10 ports) Antenna Connection
Ports on the RRU panels (4.3-10 female connector) Antenna port mapping for a low-
frequency TDD 8T8R RRU and
Huawei TDD 8T8R passive antennas Example connection to Huawei antenna
ATD4516R8v08 (4.3-10 connectors)

It is recommended that Huawei 8T8R antennas or NGMN-compliant 8T8R


antennas be used. Using other antennas may result in mismatched
polarization antenna sequences, affecting cell coverage. NGMN stands for
Next Generation Mobile Network.

Antenna-RRU Port mapping:


ANT1 – p1.R+
ANT2 – p1.CR+
ANT3 – p1.CL+
ANT4 – p1.L+
ANT5 – p1.R-
ANT6 – p1.CR-
ANT7 – p1.CL-
ANT8 – p1.L-
CAL - CAL
8 Huawei Confidential 4.3-10 male connector jumpers (9 jumpers in total per sector)
Telcel BBU Solution

9 Huawei Confidential
Telcel 5G NSA RAN gNB
❑ General principles:
• New BBU5900 is added for 5G NSA
• UBBPg3b as NR base band board considered for initial deployment of 3x100MHz in Band C. It can support NR FDD in the same board.
• UBBPg3a can be considered for future expansions when Telcel deploys additional spectrum for 5G, including mmWave.

5G BBU 5G NSA Configuration

FAN
UBBPg3b
UPEUe
UMPTg2

5G: 3.5G S111 100MHz


Board BOM Code Function Quantity
UMPTg2 03058542 Universal Main Processing & Transmission Unit 1
UBBPg3b 03050BKS Baseband Processing and Interface Unit 1
UPEUe 02311TVH Power and Environment interface Unit (-48V) 1
BBU5900 02311VFF BBU5900 Box 1
10 Huawei Confidential
BBU – Base Band Unit
BaseBand Boards BBU3900 – Previous Generation of BBU with
WBBP/LBBP/UBBP/UBRI support of following BB boards:
• WCDMA: WBBP/UBBP
• LTE: LBBP/UBBP
• GSM: UBRI

BBU5900 – New BBU with support of following BB


boards:
• WCDMA: UBBP
• LTE: UBBP
• 5G: UBBP

Central Board Central Boards: UMPT. Main processor board of BBU,


UMPT/GTMU
controlling and monitoriing BBU, transport interface. One
O&M IP address per UMPT board.

One UMPT board can be in charge of many different


technologies (LTE/WCDMA/GSM/5G) → Co-MPT

BaseBand Central Board


Boards UBBP UMPT

Page 11 HUAWEI TECHNOLOGIES CO., LTD.


Slot Layout BBU 39XX vs 5900
Slot number position changes from BBU 39XX to BBU 5900

Telcel Slot assignment


recommendation in BBU 5900:

➢ GSM/UMTS boards in slots 0 & 1


➢ LTE B4/B66/B7 in slot 2 and/or 3
➢ LTE B5 in slot 0
➢ NR in slot 4

➢ UMPT board in slot 7

12 Huawei Confidential
Two BBUs Scenario in 5G Site
When BBU 5900 is added to an existing BBU3900, then interconnection of two BBUs is necessary

• BBU interconnection is for transmission of:


• control data, clock signals, and transmission data
• Inter BBU connection is done through CI ports using fiber
optical cable between UMPT boards
• BBU 5900 will act as Root BBU
• Tx and GPS clock connections will be from BBU 5900
• BBU 3900 will act as Leaf BBU
• Tx and GPS sync clock data will be received from BBU
5900
• Each BBU will act as an independent site with its own
O&M IP address and Site ID
• BBU3900 in leaf mode needs a UMPT version b1/e2. It
cannot support UMPTa2.

13 Huawei Confidential
5G BBU 5900 Layout Scenarios 1/2
All 5G sites consider 4G modernization, as 4G will be hosted in same BBU as 5G

Case 1: One New BBU5900 (Half-Width)


• All RATs in new BBU 5900
• One new BBU 5900, replacing legacy BBU 39xx
• 2G/3G is moved to new BBU 5900 only when based on
UBBPd6/e4 boards (if based on old generation boards, then
applies Case 2)
• 4G is modernized with UBBPg2 or two UBBPe4
New BBU 5900 (G*U*L*M*N)
• Legacy LTE boards (LBBP/UBBPd6/UBBPe4) may be
0 UBBPe4/d6 (3G 4G) 1 UBBPe4/d6 (3G)
reused in other projects (low cost sites, L850, etc.)
(B5) (B2) • Slot assignment Recommendations
2 UBBPg2/e4 (4G) 3 UBBPe4 (4G)
• UMTS UBBPd6/e4 boards in Slot 0 & 1
FAN (B4/B66/B7) (B4/B66)
4 UBBPg3b (5G) 5
• LTE B4/B66/B7 UBBPg2 board in Slot 2 or
(n78) UPEUe • LTE B7 in UBBPe4 in slot 2 and LTE B4/B66 in UBBPe4
6 7 UMPTg2
in slot 3
GPS
• NR UBBPg3b board in Slot 4
Tx
• GPS connected to UMPTg2 board
• NB-IoT Standalone:
• NB-IoT will be implemented only with L850.
• NBIoT and LTE850:
• LTE850/NBIoT to be implemented in the same UBBP
G*U*L*M*N: Five modes share one BBU in
which a G*U*L*M*N main control board is board as UMTS850 in slot 0.
configured (UMPTg2).
• CPRI MUX is used. No additional fibers required.

Page 14 HUAWEI TECHNOLOGIES CO., LTD.


5G BBU 5900 Layout Scenarios 2/2
All 5G sites consider 4G modernization, as 4G will be hosted in same BBU as 5G

• UMPT+UMPT Interconnection (L*N+GU)


• BBU3900: GU*L → GU
Case 2: Existing BBU 3900 and new BBU5900 (Half-Width) • BBU5900: L*N
• Each BBU will have its own O&M IP Address and Site ID
• BBU Interconnection (UMPT-UMPT) with SFP electrical
Site ID X
Existing BBU 3900 (G*U)* - Leaf BBU O&M IP Address XX.XX.XX.XX cable
0 UBRI(2G)/WBBP 4 • BBU3900 (leaf) and BBU5900 (root)
1 WBBP/UBBP (3G) 5WBBP/UBBP (3G) • Common Transmission & Common Clock functions to be
FAN implemented
2 WBBP/UBBP (3G 850) 6 GTMU (2G)
UPEUd • If BBU3900 is equipped with UMPTa2, then it is necessary
3 7 UMPTb1/e2
to replace it with UMPTb1/e2, due BBU interconnection not
supported with UMPTa2 in leaf mode.
Site ID Y
New BBU 5900 (L*N) – Root BBU O&M IP Address YY.YY.YY.YY • Existing BBU 3900 for 2G and 3G (4G moved to new BBU 5900)
0 UBBPe4/d6 L850/NB 1 • 4G is modernized with UBBPg2 or two UBBPe4
2 UBBPg2/e4 (4G) 3 UBBPe4 (4G) • Legacy LTE boards (LBBP/UBBPd6/UBBPe4) may be
FAN (B4/B66/B7) (B4/B66) reused in other projects (low cost sites, L850, etc.)
4 5
UBBPg3b (5G) • Slot assignment Recommendations in new BBU 5900:
6 7 UPEUe
UMPTg2 • LTE B4/B66/B7 UBBPg2 board in Slot 2 or
CI Cable
UMPT – UMPT Interconnection for Single Tx • LTE B7 in UBBPe4 in slot 2 and B4/B66 in UBBPe4 in slot 3
GPS
Tx • NR UBBPg3b board in Slot 4
• LTE850/NBIoT:
*Typical BBU 39XX slot scenario configuration. Other configurations may be present in network
• Add a UBBP of reuse in slot 0 of BBU5900
• Add additional fibers from UBBP to RRUs 850
G*U: Two modes share one BBU in which a G*U main control board is configured (UMPTa2/b1/e2).
L*N: Two modes share one BBU in which an L*N main control board is configured (UMPTg2).

Page 15 HUAWEI TECHNOLOGIES CO., LTD.


Co-MPT Base Station
▪ Telcel Base Stations are based on BBU chassis with Baseband boards (UBBP) and Main
Processing/Transport board (MPT)

▪ Co-MPT mode is implemented, that means one UMPT board in the BBU used for all deployed
technologies

▪ From O&M Perspective, a Co-MPT base station is identified in the U2020 as one single site with one
Single ID Site:

Co-MPT BTS O&M system of a co-MPT base station

Page 16 HUAWEI TECHNOLOGIES CO., LTD.


5G Site IDs

• Scenario with a single BBU (BBU5900):


• Two or more technologies, the site will be tagged with MT
• Example, JL8756MT

• Scenario with two BBUs (BBU3900 and BBU5900):


• The BBU3900 will always be identified with the MT label
• Example, JL8756MT
• The BBU5900 will use the label:
• L2100 if you only have LTE
• Example JL6543L2100
• 5G DSS if you have 5G DSS, but not 5G in dedicated spectrum
• Example JL6543DSS
• NR if you have 5G in dedicated band (n78)
• Example JL5493NR

Page 17 HUAWEI TECHNOLOGIES CO., LTD.


5G IP Addressing

• The NR service requires a new IP segment and VLAN.


• This new IP and VLAN segment applies to both 5G FDD DSS and 5G TDD n78.
• For O&M, a single IP address is used per BBU / UMPT. In the case of two BBUs, each BBU / UMPT
will have its own IP address, within the same / 29 segment.
• The gNB transmission links (NSA Option 3x) include the S1-U, X2 and O&M links.
• IP planning for 5G is done considering that different network segments and VLANs are used for
each service
• It is recommended that the IP submask of the new segment for 5G be / 29 (at least 4 addresses are
required).
• Isolation per VLAN is recommended.

Page 18 HUAWEI TECHNOLOGIES CO., LTD.


Outdoor Power Solution
All new 5G sites TDD n78 will be equipped with new cabinet MTS to support higher heat dissipation

19 Huawei Confidential
MTS9303A Power Cabinet & MTS9300A Battery Cabinet for Outdoor
deployment • Dimensions (W × D × H):
• Cabinet: 650mm × 650mm × 900mm
• Top heat exchanger (optional): 650mm ×
650mm × 250mm

MTS9303A-

Base: 650mm × 650mm × 100mm


HX10A2

• Weight: <80kg (without rectifier module, top heat


exchanger or packaging)
• Heat Exchanger: 1500W
• 200A Power Subrack dual-live wire
• User Space: 12U
• Maximum Capacity: 16kW
• 4xPSU (R4875G1) @ 4kW each

• Dimensions (W × D × H):
MTS9300A-

• Cabinet: 650mm × 650mm × 900mm


• Base: 650mm × 650mm × 100mm
XA10A2

• Weight: <55kg (without batteries)


• Battery Space: 16U
• Temperature Control Mode: Air conditioner
PC300D
• Includes Lithium Battery Rack

20 Huawei Confidential
5G Outdoor Site To Power Source
• 2x100A
• 4 AWG (L1/L2/N)
New 5G equipment in MTS:
• New BBU5900
• 5G Baseband board Heat Exchange
• Main control and transmission board Expansion Module
• New DCDU-16D-02 for new BBU and new 5G AAU/RRU DC power
distribution Power 16kW
BBU 5900 (2U) 4xPSU
• DCDU-16D-02 support for 3 AAU/RRU
• Cell Site Router
• New CSR with 10GE is required. It can be installed in MTS, 12 U for User
DCDU16-D-02 (1U) Equipment
existing TP or in external GUT Tx cabinet
• Huawei new ATN910C (Cell Site Router) with 10GE ports is an
option
• Batteries
• 2x100Ah Lithium Batteries as default
• Maximum battery expansion configuration:
• If ESM-48100A1 (3.5U each) maximum 4 batteries
100Ah Lithium
• If ESM-48100B1 (3U each) maximum 5 batteries Batteries
• AC Input System
• 2x100A circuit breaker (if replacing TP cabinet, need to replace existing 70A
breakers)
• 4AWG power cable for L1,L2,N (if replacing TP cabinet, need to replace
existing 6 AWG cable)
• 2AWG for internal grounding cable
ATN910C (1U)
21 Huawei Confidential
Outdoor Power Subrack
300 A power subrack (dual-live wire)

(1) AC SPD (2) AC input circuit (3) LLVD circuit breakers


breaker

(4) Monitoring module (5) Space for the (6) Space for rectifiers
SMU02C communications
expansion module
(7) RTN+ busbar (8) Battery switch (9) Battery circuit breakers
(behind the cover)
(10) BLVD circuit breakers (11) User interface
module UIM03F1

Electrical conceptual diagram


Item Specifications
AC input system 110 V AC dual–live wire input
AC power distribution •AC input: one 2-pole 100 A circuit breaker

DC power distribution •BLVD: one 1-pole 63 A circuit breaker, two 1-pole 32 A circuit breakers, and one 1-
pole 16 A circuit breaker
•LLVD: two 1-pole 125 A circuit breakers and two 1-pole 63 A circuit breakers
• Battery route: two 2-pole 125 A circuit breakers

Rectifier A maximum of four rectifiers can be configured.


SMU and UIM SMU02C and UIM03F1
Surge protection •AC surge protection: nominal lightning strike discharge current 20 kA, maximum
lightning strike discharge current 40 kA, 8/20 μs
•DC surge protection: 10 kA in differential mode, 20 kA in common mode, 8/20 μs

22 Huawei Confidential
AC Power and Ground Cabling Installation

Installing cabinet protection ground Installing dual-live-wire AC


AC Cable Color Codes
cable (stacked installation) input power cables

(1) ACDB

Cable Color
Phase A (L1)

Phase B (L2)

Neutral (N)

Notes:
(1) Site ground bar
• Phases Cables L1 and L2 can be the same color (black or
Terminal Copper Cable Size Circuit red); if that is the case then the proper labeling needs to
be done in order to indicate which one is L1 and L2.
Cabinet ground cable: (AWG/mm2) Breaker (A)
• If site has ground bar of copper: → Copper cable AWG2 • If the site is considered of high vandalism incidence, then
(yellow/green jacket) L1 4/~21 100 aluminum cable (2AWG) needs to be considered, instead
• If site has ground bar of steel → Steel cable of copper.
3/8”(transparent jacket) L2 4/~21 100
Neutral 4/~21 -
23 Huawei Confidential
MTS9300A Battery Cabinet to install User Equipment
➢ Considered to install 2x100Ah by default in all MTS cabinets
➢ MTS Battery Cabinet has 16U for batteries ➢ Space for 1 or 2 additional battery blocks for future
➢ For Telcel, configuration already includes Lithium Battery expansion*
Rack for 5 battery sets ➢ 3U available for User Equipment

Space for User Equipment


(3U Maximum)

Space for additional


ESM-48100B1 (3U) Battery Blocks

Default 2x100Ah
batteries
ESM-48100A1 (3.5U)

24 Huawei Confidential *Space for 2x100Ah if ESM-48100B1 is used


Space for 1x100Ah if ESM048100A1 is used
Telcel 5G MTS Power Consumption & Battery Backup Time
➢ Considered Maximum MTS Configuration:
▪ 3x RRU B5
▪ 3x RRU B2
▪ 3x RRU B7 High Load
▪ 3x RRU AWS Typical Load 3 PSU used
▪ 1x BBU 3900 2 PSU used
▪ 1x BBU 5900
▪ 3x AAU 3.5GHz
PSU1 PSU2 PSU3 PSU4 PSU1 PSU2 PSU3 PSU4
➢ Power Consumption:
▪ Typical (50% load): 8030W
▪ High Load (70% load): 9189W
▪ Maximum (100% load): 12612W

3 PSUs = 12000W can Support a High load scenario and 1 PSU is


available for redundancy

➢ Battery Backup time:


▪ 1x100Ah → 1 hour
▪ 2x100Ah → 1.5 hours
▪ 3x100Ah → 2 hours
▪ 4x100Ah → 2.5 hours
▪ 5x100Ah → 3.5 hours

Telcel Default Telcel Maximum


25 Huawei Confidential Configuration
Configuration
DCDU16D-02
• 5G AAUs power is distributed with new
DCDU16D-02 Model DCDU16D-02
• No ODM needed between DCDU16D-02 and
AAU
Front view of a DCDU16D-02
Appearance
-48V@3x50A -48V@4x30A*

Equipotential
grounding point.
Dimensions 19inch(W)x1U(H)x125mm(D)
- 1 Green cable 6AWG
Air channel Passive Device

Max Output
Power per 1200W@70m distance
Input Power DC cables in DCDU16D-02
Port
Output cable Bare wire. The supported cable cross-sectional area ranges from 6
125A DC breaker.
- Blue/Black cables diameter mm2 to 16.7 mm2 (0.0093 in.2 to 0.026 in.2).
4AWG

RRU Fuse 3x50A

Monitoring
Passive Device, not needed
Mode
*Each power output is less than or equal to 25 A, and the total power output is less than or equal to 60 A.

26 Huawei Confidential
Temporary Power Distribution Solution DCDU for 5G Sites

• Initial sites where DCDU16D-02 is not available may need


to consider to implement DCDU12B + ODM
DCDU16D-02
(Final Solution)
DCDU12B + ODM One power cable
from ODM to
(Temporary Solution) AAU, per sector
One power cable
from DCDU to
AAU, per sector

Two power cables from DCDU to


ODM, per sector
27 Huawei Confidential • RRU Cable: from 3.3 mm2 to 10 mm2 (0.005 in.2 to 0.015 in.2).
• RRU Fuses: 3x30A
RRU DC Power Cable (distances less than 200-240 mts)

• AAU5639w, AAU5339w and RRU5258 are high power AAU that will require DCDU16D-02
• It is considered that all 5G sites will be equipped with MTS cabinet and BoostLi Lithium batteries,
providing 57 constant VDC to power AAUs/RRUs
• Depending on the distance from DCDU to AAU/RRU, different cable size will be deployed:

ANALISIS PARA CALIBRE DE CABLES CON DCDU 16D

Calibre 8 AWG Calibre 5 AWG


(ɸ 8.37 mm²) (ɸ 16.8 mm²)
Radio Banda Distancia máxima (m) Distancia máxima (m)
AAU5639w N78 ≤ 100 > 100 ≤ 200
AAU5339w N78 ≤ 110 > 110 ≤ 220 DC Power cable is two
cores, blue/black, rated
RRU5258 N78 ≤ 120 > 120 ≤ 240* voltage 300V

• * RRU5258 will require one OCB in RRU side to interconnect AWG5 and AWG8 cables:
120-240 mts 1 mts
DCDU OCB RRU
5AWG 8AWG

• For longer distances as indicated in previous table, it is recommended to implement a DPU40D/DBU20B solution
(see next slide)
28 Huawei Confidential
RRU Power Cable (distances over 200-240 mts)

• Distances over 210 meters between DCDU and AAU/RRU cannot use a direct power cable solution.
• An independent AC power connection must be implemented in remote RRU with Distributed Power/Battery Unit
solution:
• DPU40D (2kW)
• DBU20B (20Ah/960Wh)

>220 mts

DBU20B
DPU40D

AC input
5G Site

Remote AAU
Power Cable
CPRI FO

29 Huawei Confidential
Technical Specs OCB, DPU, DBU

OCB-01M DPU40D DBU20B

30 Huawei Confidential
Outdoor Cabinet Solution

31 Huawei Confidential
5G Outdoor Cabinet Scenarios

• All 5G outdoor sites will consider a new MTS cabinet with new BBU 5900
• 4G always deployed in same BBU 5900 as 5G
• LTE B7 always present in 5G sites n78, as it will be anchor frequency in NSA 3x solution

Two Scenarios Yes No


2G/3G is already based on UBBP
board?
1. One MTS Cabinet, One BBU
2. One MTS Cabinet, Two BBUs

One Condition

a) 2G/3G existing boards (WBBP


or UBBP based)
Scenario 1 Scenario 2

Page 32 HUAWEI TECHNOLOGIES CO., LTD.


5G Cabinet Scenario 1 - Only one MTS Cabinet and one BBU
Applicable when: Existing 2G/3G boards already based on UBBP

⚫Equipment Relocated from TP to MTS


⚫4x DCDU (for RRUs)* ⚫This scenario considers that 2G/3G boards are already based on UBBPd6/e4
⚫1x EMUA
Heat Exchanger
boards. These boards are relocated to BBU 5900; otherwise Scenario 2 must
* Considering scenario with 4 DCDUs for existing RRUs. Some sites
may have less DCDUs. be considered.
POWER RACK
PSU x 4 ⚫Additional available user equipment space (up to 6U).
DCDU-1 (1U) ⚫New equipment added to MTS
MTS9303A

DCDU-2 (1U)
⚫1x BBU5900 (2G/3G/4G/5G)
DCDU16D (1U) ⚫CSR needed for 5G must support 10GE ports. It is considered that all new 5G
BBU-2 (2U) ⚫1x DCDU (for AAUs)
⚫1x CSR
sites will include Huawei ATN910C (1U) inside MTS
SPARE (6U) ⚫2x 100Ah Lithium Batteries
⚫Batteries:
CSR (1U) Max. Available User Equipment Space: 6U ⚫To use new Lithium batteries. At least 2x100Ah are required. Battery
compartment used for installation of extra equipment, up to 3U.
MTS9300A

DCDU-3 (1U)
DCDU-4 (1U) ⚫Additional battery expansion possible, one or two blocks, depending on
EMUA (1U) Battery Compartment:
• Total 16U the size of the battery
• 2x100Ah may occupy 6U or 7U**
• Available up to 3U for additional user ⚫Removed equipment for Reuse:
100Ah Li equipment: ⚫Existing power cabinet equipment will be removed for reuse in low cost
100Ah Li
• 2x DCDU (2U) sites.
• 1x EMUA (1U)
• Possible to expand with another two
blocks of batteries (3U each) or 1 block
(3.5U)
** Battery ESM-48100B1 occupies 3U. If ESM-48100A1 is used,
then 3.5U each battery.

Page 33 HUAWEI TECHNOLOGIES CO., LTD.


5G Cabinet Scenario 2 - Only one MTS Cabinet and two BBUs
Applicable when: 2G/3G boards are based on old generation boards (GTMU/UBRI/WBBP)

⚫Equipment Relocated from TP to MTS


⚫4x DCDU (for RRUs)* ⚫Thisscenario considers that 2G/3G boards are based on old generation boards.
⚫1x BBU3900 (2G/3G) These boards are reused in BBU 3900 and one BBU 5900 is added for 4G/5G only.
Heat Exchanger ⚫1x EMUA
* Considering scenario with 4 DCDUs for existing RRUs. Some sites ⚫4G B4/B66/B7 is implemented in UBBPg2 board
may have less DCDUs.
POWER RACK
PSU x 4 ⚫TP cabinet is replaced with new MTS cabinet. BBU3900 is relocated to new MTS.
DCDU-1 (1U) ⚫New equipment added to MTS
DCDU-2 (1U) ⚫1x BBU5900 (4G/5G)
MTS9303A

BBU-1 (2U)
⚫Top Heat Exchanger is considered for MTS.
DCDU16D (1U)
⚫1x DCDU (for AAUs)
BBU-2 (2U) ⚫1x CSR ⚫BBU Interconnection is considered with SFP electrical cable.
⚫2x Lithium Batteries 100Ah
SPARE (4U)
⚫Additional available user equipment space (up to 4U).
CSR (1U) Max. Available User Equipment Space: 4U
DCDU-3 (1U) ⚫CSR needed for 5G must support 10GE ports. It is considered that all new 5G sites
will include Huawei ATN910C (1U) inside MTS
MTS9300A

DCDU-4 (1U)
EMUA (1U)

Battery Compartment: ⚫SLPU, signal lightning protection unit, is removed when introducing MTS
• Total 16U
• 2x100Ah may occupy 6U or 7U** ⚫Batteries:
100Ah Li
• Available up to 3U for additional user ⚫To use new Lithium batteries. At least 2x100Ah are required. Battery
100Ah Li equipment: compartment used for installation of extra equipment, up to 3U.
• 2x DCDU (2U) ⚫Additional battery expansion possible, one or two blocks, depending on the
• 1x EMUA (1U) size of the battery
• Possible to expand with another two
blocks of batteries (3U each) or 1 block ⚫Removed equipment for Reuse:
(3.5U) ⚫Existing power cabinet equipment will be removed for reuse in low cost
** Battery ESM-48100B1 occupies 3U. If ESM-48100A1 is used, sites.
then 3.5U each battery.

Page 34 HUAWEI TECHNOLOGIES CO., LTD.


Indoor Power Solution
All new 5G sites TDD n78 will be equipped with new cabinet MTS to support higher power consumption

35 Huawei Confidential
Technical specifications of the 5G indoor power system
MTS9604B –N20C1
Input Mode Dual live line
Input Voltage Dual-live 85VAC - 300VAC;
Battery Box AC Input Frequency 45Hz - 65Hz, rated value: 50Hz/60Hz

Distribution Input Capacity 1 × 125A/2P MCB


Power Subrack ETP48400 (3U)
SPD Class B: Nominal lightning strike discharge current 30kA (8/20μs)
18kW (Dual-live wire AC input)
AC Output None

Normal mode: 42VDC - 58VDC adjustable, rated value: 53.5VDC


Output Voltage
5G mode: 57VDC constant (must integrate with BoostLi lithium battery)
Maximum Capacity 18kW
User Space (19U) DC Battery Branch 2 × 200A OT terminals
Distribution LLVD Branch 2× 125A MCB, 3x63A MCB
BLVD Branch 2×63A MCB, 2×32A MCB, 2×16A MCB
SPD Nominal lightning strike discharge current 30kA (8/20μs)

Dimension (W × D × H) 600 mm × 600 mm × 2000 mm


Weight <95kg (excluding rectifiers and lithium batteries)

Lithium battery 4 x 100Ah Operating Temperature -10℃ to +45℃


-40℃ to +70℃
Lithium Batteries (12U) (two Storage Temperature
Operating Humidity 5% - 95% (non-condensing)
or four battery blocks) 0 - 4000m (High temperature derating in the environment of 2000m - 4000m, the operating
Altitude
temperature is reduced by 1℃ for every 200m increase)
Environment IP Rating IP20
Installation mode Installed on a concrete floor (by default) or ESD floor (ESD supports are required)
Operated and maintained from the front; installation against a wall is not supported (distance
Maintenance mode
between the cabinet and the wall ≥ 600 mm, 800mm is recommended.)
Application environment Class B environment
➢ Same batteries as Outdoor cabinet (ESM-48100B1)
Cabling mode Routed in and out from the top
➢ Same DCDU16D-02 for 5G AAUs/RRUs
➢ If EMUA installed in TP cabinet, then it is moved to MTS.
➢ SMU02C included for monitoring
➢ Power Plant of maximum capacity of 18kW, but will be equipped as outdoor MTS:
➢ 16kW (4x PSU 4kW each) (R4875G)
Page 36 HUAWEI TECHNOLOGIES CO., LTD.
Indoor Power Subrack
ETP48400-C3B1

(1) Ground screw (2) AC input (3) LLVD power


module distribution
(4) SMU02C (5) BLVD power (6) Battery wiring
distribution ports
(7) Reserved slot (8) UIM05B1 (9) Space for
for rectifiers
CIM02C/NIM01C3

Electrical conceptual diagram

Item ETP48400-C3B2
AC input system 120/240 V AC dual–live wire
DC power •LLVD: two 125 A and three 63 A circuit breakers
distribution •BLVD: two 63 A, two 32 A, and two 16 A circuit breakers
Surge protection •AC surge protection: nominal surge discharge current:
30 kA (8/20 µs), five times respectively in the positive
and negative directions
•DC surge protection: 10 kA (8/20 µs) in differential
mode, 20 kA (8/20 µs) in common mode

Page 37 HUAWEI TECHNOLOGIES CO., LTD.


AC Power and Ground Cabling Installation

Installing cabinet protection ground Installing dual-live-wire AC


AC Cable Color Codes
cable (stacked installation) input power cables

Cable Color
Phase A (L1)

Phase B (L2)

Neutral (N)
(1) Site ground bar

Notes:

• Phases Cables L1 and L2 can be the same color (black or


Cabinet ground cable: Terminal Copper Cable Size Circuit red); if that is the case then the proper labeling needs to
• If site has ground bar of copper: → Copper cable AWG2 be done in order to indicate which one is L1 and L2.
(yellow/green jacket) (AWG/mm2) Breaker (A)
• If the site is considered of high vandalism incidence, then
• If site has ground bar of steel → Steel cable of
L1 4/~21 100 aluminum cable (2AWG) needs to be considered, instead
3/8”(transparent jacket) copper.
L2 4/~21 100
Neutral 4/~21 -
38 Huawei Confidential
NSA Transport Solution

39 Huawei Confidential
NSA Transmission solution
• All 5G Huawei sites will be equipped with Huawei CSR ATN910C, which is
equipped with 10GE ports

• In gNB side, transmission port is provided by UMPT board


Scenario with one BBU CSR (ATN910C)

• Scenario with one BBU


• All technologies implemented in one BBU, one UMPTg2
• UMPTg2 Tx ports:
• 2x Electrical 10/100/1000 Mbit/s (Full/Half-duplex)
• 2x Optical 100/1000/10000/25000 Mbit/s (Full-duplex) Optical fiber
• All RATs Tx in one single cable in 10Gbit/s mode towards CSR

• Scenario with two BBUs


• Recommended to implement a co-transmission solution between BBU 3900
and BBU 5900 UMPT to CSR interface: SM, SFP 10.3G, 1310nm, 10km
• Inter BBU CI Connection (from UMPTe2 to UMPTg2)
• One Tx connections towards CSR It is considered that each 5G site will require 2Gbps for
• BBU 5900 acting as Root BBU with physical connection towards CSR backhaul capacity, considering 50MHz scenario.
When migrating to 100MHz channel a backhaul capacity of
• BBU3900 acting as Leaf BBU, using BBU5900 as a bridge towards 4Gbps may be required
CSR

• Each BBU will have different O&M IP address and site ID


It is considered that each 5G site will require 2Gbps for
backhaul capacity, considering 50MHz scenario.
CSR (ATN910C) When migrating to 100MHz channel a backhaul capacity of
4Gbps may be required

Scenario
with Two
BBUs

40 Huawei Confidential
5G Clock Solution

Page 41 HUAWEI TECHNOLOGIES CO., LTD.


NSA Synchronization solution – Common Clock
GPS Antenna
• General:
Scenario 1: BBU 5900 (2G/3G/4G/5G)
• Primary Synch: GPS
CLK:GPS
• Secondary Sync: PTP
UBBPd6 GU UBBPd6 GU
FANf
UBBPg2 LO UBBPe4 LM

UBBPg3b NO
UMPTg2 GULNM
UPEUe • Scenario 1:
BBU5900 • BBU 5900 receives both GPS and PTP sycn
Tx
CLK: 1588v2
CLK:GPS
• Scenario 2:
• GPS connected to BBU 5900 (root BBU)
Scenario 2: BBU 5900 (4G/5G) & 3900 (2G/3G)
• PTP sync received by BBU 5900 Tx
GPS Antenna • BBU 5900 distributes Sync clock to BBU3900
(leaf BBU) through BBU interconnection cable
FANf
UBBPg2 LO UBBPe4 LM

UBBPg3b NO
UPEUe
UMPTg2 LNM
Tx
Root BBU5900 CLK:1588v2
BBU Interconnection

NR requires Time Synchronziation Support (both in


UMPTe2 GU GPS and 15588v2)
Leaf BBU3900
Page 42 HUAWEI TECHNOLOGIES CO., LTD.
Bring digital to every person, home, and

Thank you.
organization for a fully connected,
intelligent world.

Copyright©2018 Huawei Technologies Co., Ltd.


All Rights Reserved.

The information in this document may contain predictive


statements including, without limitation, statements regarding
the future financial and operating results, future product
portfolio, new technology, etc. There are a number of factors that
could cause actual results and developments to differ materially
from those expressed or implied in the predictive statements.
Therefore, such information is provided for reference purpose
only and constitutes neither an offer nor an acceptance. Huawei
may change the information at any time without notice.