Professional Documents
Culture Documents
Power Transformer
Power Transformer
Nucleus/winding temperature: 05 °C
Testing of insulators
Test
Phase Test kV Capacity C 1 (pF) tgδ % I (mA)
No.
1 A 10 201 0,48 0,956
2 B 10 200 0,55 0,975
3 C 10 199 0,48 0,958
4 N 10 198 0,47 0,762
Test kV Capacity C 2 (pF) tgδ % I (mA)
5 A 0,5 178 0,29 0,109
6 B 0,5 172 0,28 0,111
7 C 0,5 175 0,32 0,107
8 N 0,5 301 0,22 0,096
H: HV circle G: Grounding
L: LV circle N: Neutral
Measurement of no-load current and loss at low voltage
Outputs given Short closed Measured values
voltage exits
U,V I, mA P, Vt
a-b b-c 220 44,2 6,41
b-c c-a 220 44 6,21
c-a a-b 220 60,9 8,55