Professional Documents
Culture Documents
Oasys Results
Oasys Results
Development Length (Ldc) for 20mm dia bar = 274.21mm which is <600mm. :Hence (OK)
Shear Check
SHEAR DESIGN OF RECTANGULAR/SQUARE COLUMN
1. DETAILS OF COLUMN
3.(a) MOMENT CARRYING CAPACITY OF LONGITUDINAL BEAM FRAMING INTO THE COLUMN
WIDTH = 400 mm
DEPTH = 750 mm
CLEAR COVER = 30 mm
DIA OF STIRRUPS USED = 10 mm
∴ DIA OF MAIN BAR USED = 20 mm
EFFECTIVE DEPTH OF THE BEAM = 700 mm
REINFORCEMENT PROVIDED IN THE BEAM = 2800 mm2
MOMENT CARRYING CAPACITY OF THE BEAM = 746.025 KN-m
3.(b) MOMENT CARRYING CAPACITY OF TRANSVERSE BEAM FRAMING INTO THE COLUMN
WIDTH = 400 mm
DEPTH = 600 mm
CLEAR COVER = 30 mm
DIA OF STIRRUPS USED = 10 mm
∴ DIA OF MAIN BAR USED = 20 mm
EFFECTIVE DEPTH OF THE BEAM = 550 mm
REINFORCEMENT PROVIDED IN THE BEAM = 1276 mm2
MOMENT CARRYING CAPACITY OF THE BEAM = 283.150 KN-m
3.(c) EARTHQUAKE IN THE LONGITUDINAL DIRECTION
BOTH LONGITUDINAL BEAMS ARE PRESENT = NO
NO. OF BARS ALONG THE LONGITUDINAL DIRECTION OF COLUMN = 0
FACTORED SHEAR FORCE AS PER ANALYSIS = 94.71 KN
HEIGHT OF STOREY = 3.56 m
SHEAR FORCE CORRESPONDING TO PLASTIC HINGE FORMATION = 293.381 KN
REQUIREMENT OF SHEAR REINFORCEMENT = YES
SHEAR FORCE TO BE RESISTED BY THE STIRRUPS = 293.381 KN
DIA OF STIRRUPS PROVIDED = 10 mm
NO. OF TIES = 5
SPACING REQUIRED = 405.95 mm c/c
GOVERNING CASE FOR NOMINAL SHEAR STIRRUPS Minimum Nominal Links as Per IS 456 - 2000 Requirements