In accordance with HSE Plan and risk mitigation for any emergency situation as follow:
• Gas leaking
• Big fire
• Explosion
• Tsunami
• Earth quick or disaster
• Demonstration
EMERGENCY CASE
The purpose of this emergency lay out and Response is to provide a framework for response structure,
organization, responsibilities, planning and management in case of required MEDIVAC during JO RDMP
Construction activities on site. This applies to site area JO RDMP and all its employees. All Contractors
shall follow the JO RDMP ERP within the yard boundaries up to the relinquishing point, specified in the
requirement for the subcontractors, being the appointed hospital, which is Pertamina Hospital. This ERP
is a “live document” and will require periodic review to ensure that it is current and up to date
throughout the project.
LAY OUT EVACUATION ROUTE (MUSTER POINT No. 3)
A Assembly Point
M
M
M Muster Point
JO Gate 5A
Pertamina Gate 5
7 11
A`
6 8 A
4 5
3 Area 6 Boiler
15
Area 6 Boiler
17 Area 8 CWS
14
2 13 Are
1
LAY OUT EVACUATION ROUTE (MUSTER POINT No. 1 & 2)
Pertamina
RU V Office
Pertamina
Gate 4
M
40
45
A
54
Jetty 7 HSE RU V
Construction Office
A Assembly Point
M Muster Point
COMMUNICATION
For emergency case on site or at any other location under JO RDMP Company’s control should be
reported immediately (by priority order) Through general radio call as assigned How to alert and info via
emergency channel to activated the ERT team and mustering as well