Safaniyah and Manifa Program

Bidders Questions and Answers

Private
No. Sent Date Package No. Discipline Title
(Y or N)

1 12/29/2022 Hydrocarbon N EL

2 12/29/2022 Hydrocarbon N EL

3 12/29/2022 Hydrocarbon N EL

4 12/29/2022 Hydrocarbon N EL

5 12/30/2022 Hydrocarbon N EL

6 12/30/2022 Hydrocarbon N EL

7 12/30/2022 Hydrocarbon N EL

8 12/30/2022 Hydrocarbon N X

9 12/30/2022 Hydrocarbon N EL

10 12/30/2022 Hydrocarbon N EL

11 12/29/2022 Hydrocarbon N EL

Non-
12 12/29/2022 Hydrocarbon N X

Non-
13 12/29/2022 Hydrocarbon N EL

14 12/29/2022 Hydrocarbon no coating INT./EXT. FBE COATING

15 12/29/2022 Hydrocarbon N PIPING

# Company General Use


16 12/29/2022 Hydrocarbon N PIPING

PRODUCED
17 12/29/2022 WATER SGSW-1 N PIPING
&SGSW-2

PRODUCED
18 12/29/2022 WATER SGSW-1 N PIPING
&SGSW-2

PRODUCED
19 12/29/2022 WATER SGSW-1 N PIPING
&SGSW-2

25
20 12/29/2022 - I&C Instrumentation cables
(Hydrocarbon)

25
21 12/29/2022 - I&C Instrumentation cables
(Hydrocarbon)

25 Instrumentation & Control


22 12/29/2022 - I&C
(Hydrocarbon) ISS

25
23 12/29/2022 - I&C CIT
(Hydrocarbon)

Non
24 12/30/2022 - PIPING
Hydrocarbon
Non
25 12/29/2022 - PIPING
Hydrocarbon

26 12/30/2022 Hydrocarbon N EL

27 12/30/2022 Hydrocarbon N EL

28 12/30/2022 Hydrocarbon N EL

# Company General Use


29 12/30/2022 Hydrocarbon N EL

25
30 12/31/2022 N I&C LDS for sour service
(Hydrocarbon)

25
31 12/31/2022 N PIPELINE Sabkha / Sandy Length
(Hydrocarbon)

25 Typical Trench Details For


32 12/31/2022 N PIPELINE
(Hydrocarbon) Metallic Pipeline

25
33 12/31/2022 N CONCRETE Rebar & Anchor Bolt Schdule
(Hydrocarbon)

25
34 12/31/2022 N PIPELINE Typical Sabkha Pad
(Hydrocarbon)

25
35 12/31/2022 N PIPING PIPING PLAN
(Hydrocarbon)
25
36 1/2/2023 N PIPING MATERIAL SELECTION
(Hydrocarbon)
25
37 1/2/2023 N PIPING MATERIAL SELECTION
(Hydrocarbon)

25
38 1/2/2023 N PIPING MATERIAL SELECTION
(Hydrocarbon)

25
39 1/2/2023 N PIPING MATERIAL SELECTION
(Hydrocarbon)

# Company General Use


25
40 1/2/2023 N PIPING Wall thickness calculation
(Hydrocarbon)
41 12/30/2022 STNCL-1 PIPING PIPING PLAN
25
42 12/31/2022 PIPING PIPING PLAN
(Hydrocarbon)

# Company General Use


Transmittal References

676-P-SM-707861

676-P-SM-707866
677-P-SM-707863
676-P-SM-707861 SAF-
PSM-897743

SAF-P-SM897741

SAF-P-SM897742

SAF-A-PKG-25 Non HC

# Company General Use


FPP SM-517000.001

- DCL# SM-856001

- ISS# SAF-J-SM-828099

- DCL# SM-856001

P&ID # 676-SM-255601-
-
003

# Company General Use


- SAF-J-SM-828028

SM-836603

# Company General Use


# Company General Use
Attachments Attachments
Bidder's Question
sent with (Y or N) Title

No proper dwgs. For MLIV at KM-34 SK Corridor N N

No proper dwgs. For MLIV at KM-68 SK Corridor & Jump Over N N

No data sheets for Solar System N N

No data sheets for Battery Chargers N N

No dwgs. for 480V power panel for LDS shelter in Safaniyah CPF
N N
facility. IFB say TBD during bid stage

UPS battery backup time to be considered 2 hrs. Need clarification. N N

LV power panels busbar rating as per data sheets is 150A, but as


N N
per IFB dwg.s is 100A..? Which is correct…?

No index - X dwgs. Available N N

No Proper datasheets for UPS System. N N

No proper Cable and conduit schedule available to measure the


total qty of cables. For eg. Power cables size and length from Solar N N
system to equipmrnts not mentioned.

In switch rack data sheets, no.of conductors per phase are shown
2. but in drawings main breaker is MCCB, for which two conductors N N
are not possible to connect in single phase.

No index - X dwgs. Available N N


Reference to the DOC SM-829420 pera 2.2.1
''CONTRACTOR shall be responsible for external and internal
coating, as detailed
No Electrical scope. in
Notproject specification,
even mentioned in and selection
Drawing of the
Control Log. N N
unloading and storage''

1- Please confirm ,compeny will supply the bare mainline pipe for N N
(42'' SRAK, 16'' STNGT-1, STNCL-1, TNSFG-1)or external FBE.
coated pipe.

PIPING MATERIAL
2- Please SPECIFICATION
confirm ,compeny NOT PROVIDED
will supply the INT.FBEFOR ALL LINE
coated N N
CLASS
mainline pipe for 16'' STNGT-1

# Company General Use


TEMPORARY BURNPIT LOCATION REQUIRED, TO CONSIDERED
PROPER PIPING MATERIAL AT LOCATION 680-TNSFG-1 LAUNCHER N N
AREA

42 in. SGSW-1 & SGSW-2 AS IT IS CS HDPE LINED PIPE (INT PE-RT


LINED) AS THIS PIPE IS FREE ISSUED MATERIAL.
WHETHER ARAMCO WILL PROVIDE THE SPOOLS WITH FLANGE
N N
ATTACHED ON IT. ALONG WITH ALL THE GASKETS & BOLTS
ARAMCO WILL PROVIDE IT OR CONTRACTOR NEED TO
CONSIDERED IN SCOPE.

42 in. SGSW-1 & SGSW-2 AS IT IS CS HDPE PIPE, IF IT IS FIELD


LINING ARAMCO WILL PROVIDE VENT CONNECTION MATERIAL N N
ALONG WITH ALL ACCESSORIES OR NOT.

42" PIPE SGSW-1 & SGSW-2 WILL BE SHOP LINING OR FIELD


N N
LINING.

Feed contractor to provide the instrument cable and conduit


N N
schedule (CCS) so that cable lengths/quanitities can be measured.

Feed contractor to provide the revised ISS for instrumentation


cable because cable lengths are also missing in the feed ISS SAF-J- N N
SM-828099 sheet number 015 to 022 item number 3.

Feed contractor to provide all the project missing ISS which are not
included in the feed pacakge such as pressure transmitters PIT,
Pressure gauges PG, temperature elements TE, temperature
transmiters TIT,thermowell TW, Scraper detection switch XS,
N N
Corrosion coupon CC, Cossorion transmitters CE/CIT, Junction
boxes JB, LDS, remote terminal unit RTU, level transmitters LIT,
level gauges LG, H2s/LEL gas detectors, horns, beacons, and high
siren alrams.

What is the basis CE/CIT corrosion monitoring transmitters is not


included in the P&ID # 676-SM-255601-003?. And only included N N
corrosion coupon.

For ZSW-1 Scarepr area Line class required to select the material N N

Bypass line size for all produced / treated water required N N

Missing power panel schedules and lighting panels schedules shall


N N
be provided by bid contractor for all locations of the BI.

All power panel and lighting panels data sheets shall be provided
N N
by bid contractor for all locations of BI.

Missing power panel schedules and lighting panels schedules shall


N N
be provided by bid contractor for all locations of the BI.

# Company General Use


All power panel and lighting panels data sheets shall be provided
N N
by bid contractor for all locations of BI.

Feed contractor to provide the reason because LDS system is not


N N
considered in the reference document # SAF-J-SM-828028.

Identification of Sandy Sabkha areas in pipeline alignment sheets


(SM-577005, SM-577006, SM-577007 and SM-577007) mentioned
that "Refer to verify geotechnical report (SM-838205).
N N
In Geotechnical report, There is no Specific Length Sabkha/Sandy.
Therefore FEED Designer requested to provide clear soil
description to consider in BID .

Refer to Typical Trench drawing (SM-547001) Note-7 mentioned


that, "Actual trench angle will be determined based on
geotechnical report during detailed design phase".

Feed Geotechnical report, project site classified as Type - C Soil. In


this case 34 Degree angle has to follow as per CSM which requires N N
more than 6.90 meter wide berm.

Therefore FEED Designer requested to provide angle of slope or


wide of berm.

Feed Designer requested to provide Anchor Bolt & Bar Bending


N N
Schedule for Pipe Suppots & Sleeper foundation.

Refer to Typical Sabkha Pad drawing (SM-547064), Top width of


sabkha pad mentioned as Two times of D+550 but as SAES-L-450 N N
mentioned 6 times diameter. Please Clarify width of Sabkha Pad.

NO available piping plan for all launchers and receivers in order to


N N
provide proper material take-off.

Pipelines Material Selection Report - NOT AVAILABLE N N

SM-957033 Safety Instruction Sheet for Sour Condensate STNCL-1


N N
Pipeline - NOT AVAILABLE
SM-957034 Safety Instruction Sheet for Sour Associated Gas
STNGT-1 Pipeline - NOT AVAILABLE N N

SM-957035 Safety Instruction Sheet for Sales / Fuel Gas


N N
TNSFG-1 Pipeline - NOT AVAILABLE

# Company General Use


request to provide document - Pipelines Mechanical Calculations N N

NO Available piping plan for KM 15.5 jump over N N


NO available piping plan for all launchers and receivers in order to
N N
provide proper material take-off.

# Company General Use


QUERIES
ORIGINATOR

SOHEB

SOHEB

SOHEB

SOHEB

SOHEB

SOHEB

SOHEB

SOHEB

SOHEB

SOHEB

SOHEB

SOHEB

ABRAR

WASIM

WASIM

# Company General Use


WASIM

WASIM

WASIM

YOUSUF

YOUSUF

YOUSUF

YOUSUF

WASIM

WASIM

WASIM

SOHEB

SOHEB

SOHEB

# Company General Use


SOHEB

YOUSUF

AZAD

AZAD

AZAD

AZAD

JEHU

JEHU

JEHU

JEHU

JEHU

# Company General Use


JEHU

JEHU

JEHU

# Company General Use

You might also like