TRANSMISSION ENGINEERING STANDARD TES-P-104.05, Rev.

same. Drawing and procedures shall be submitted to the


COMPANY for approval prior to start of construction.

iv. The details of the directional drilling method along with


description of the machinery that will be used shall be
submitted for COMPANY review and approval. The
CONTRACTOR shall explain in details, how the required
clearance between each circuit and other circuit and other
utilities will be maintained.

v. Prior to commitment of any directional drilling work, the


CONTRACTOR shall get approval and permission from the
concerned ROW approving agencies.

vi. All the above requirements shall be submitted for COMPANY


review and approval.

e. Backfilling and Reinstatement shall be in accordance of the


requirements of appropriate authority.

8.2.4 Recommended Clearances between SEC Underground Power Cables and


Other Utilities' Lines

Unless otherwise specified by the Design Engineer in the SOW/PTS after


consultation with relevant facility, the following clearances between U/G
power cable and other facilities such as water, sewer, gas, telephone shall be
used:

Table 05-05: Clearances of SEC U/G Cables & Other Utilities lines

SEC UNDERGROUND CABLES


Utility 110 kV to 380 kV
Horizontal Vertical
Clearance Clearance
(mm) (mm)
Water & Sewer 1000 500
Telephone 5000 1000
Gas 1000 500

8.3 Cable Route Marker

8.3.1 Warning posts shall be installed along the center line of the trench at not over
50 m intervals on congested areas and not over 90 m intervals on open areas
and at all locations where the trench changes direction.

8.3.2 On straight route, the warning post shall have a two-arrow sign to indicate
cable route direction.

TESP10405R0/AAG Date of Approval: February 18, 2007 PAGE NO. 17 OF 26