TECHNICAL CENTERS & PROJECTS (TC&P)

PROJECT &CONSTRUCTION (BUH)

EPC FOR NEW FLOW SUCTION TANK, ACCESS PLATFORMS,


DEAD LEG REPAIR WORKS, AND SEWAGE TREATMENT
PLANT IN BUHASA

ADNOC Onshore Contract No.: 4700017119


ADNOC Onshore Project No.: P12513

DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR


FOR FIRE FIGHTING EQUIPMENT & FWP

Signature are missing

A 26-JAN-2024 RJE PRP VKD Issued for Review

REV. DATE ORIGINATOR REVIEWED APPROVED DESCRIPTION

THIS DOCUMENT IS INTENDED FOR USE BY ADNOC ONSHORE AND ITS NOMINATED CONSULTANTS, CONTRACTORS, MANUFACTURERS AND SUPPLIERS

VENDOR/SUPPLIER: CONTRACTOR:
Tyco Fire & Security UAE ROBTSTONE ME LLC
LLC

ADNOC Onshore Document No. : P12513-12-99-85-1607 Revision :A

ORGINATOR No: : TFS-P24432XXXX-DAT-002 Date :26-Jan-2024


ADNOC Onshore Project No : P12513 Page : 1 of 27
Security Code: 5–Public
DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR FOR FIRE
FIGHTING EQUIPMENT & FWP

Document No. : P12513-12-99-85-1607 Rev :A

Project No. : P12513 Page : 2 of 27

Sr. Rev. Issue Date of


Description of revision
No. No. No. issue
1 A 1 26-Jan-2024 Issued for Review

HOLDS

Hold No. Section Hold Description

Security Code: 5–Public


DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR FOR FIRE
FIGHTING EQUIPMENT & FWP

Document No. : P12513-12-99-85-1607 Rev :A

Project No. : P12513 Page : 3 of 27

TABLE OF CONTENTS

1. INTRODUCTION......................................................................................................................................... 4
1.1. BU HASA FIELD OVERVIEW .................................................................................................................. 4
1.2. BU HASA CDS – EXISTING FACILITY OVERVIEW .................................................................................... 4
2. PROJECT SCOPE......................................................................................................................................... 5
2.1. PROJECT OBJECTIVES ........................................................................................................................... 6
3. DEFINITIONS AND ABBREVIATION ............................................................................................................ 7
3.1. DEFINITIONS ........................................................................................................................................ 7
3.2. ABBREVIATIONS ................................................................................................................................... 8
4. REFERENCE DOCUMENTS ......................................................................................................................... 9
4.1. PROJECT REFERENCE ............................................................................................................................ 9
4.2. ADNOC ONSHORE PROCEDURES AND TECHNICAL GUIDANCE ............................................................ 9
4.3. INTERNATIONAL STANDARDS ............................................................................................................ 11
5. ORDER OF PRECEDENCE ......................................................................................................................... 13
6. PURPOSE ................................................................................................................................................. 13
7. DATA SHEET FOR SELF OSCILLATING MONITOR & NOZZLE .................................................................... 14
8. PRODUCT CATALOGUE FOR SELF OSCILLATING MONITOR & NOZZLE .................................................... 16

Security Code: 5–Public


DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR FOR FIRE
FIGHTING EQUIPMENT & FWP

Document No. : P12513-12-99-85-1607 Rev :A

Project No. : P12513 Page : 4 of 27

1. INTRODUCTION
ADNOC Onshore has awarded the EPC Work as defined under Project Scope below to
execute the New FST in Bu Hasa CDS, Access platforms and walkways at CDS and RDS-2,
Piping dead leg repair works at CDS and new STP which encompasses detailed engineering,
procurement, installation, construction, pre-commissioning, commissioning and provision of
assistance and supervision during start-up for the completed facilities identified under the
scope of the PROJECT. The project consists also of the replacement of the existing 8”
condensate lines from Flare K.O. drums to degassing boots that face integrity issues.

1.1. BU HASA FIELD OVERVIEW


Bu-Hasa field is located 200 km south west of Abu Dhabi. It is ADNOC ONSHORE’s most
western producing field. It was discovered in 1962 and was put on production in May 1965.
In Bu-Hasa currently there are three Remote Degassing Stations (RDS-1/2/3) and two
satellite stations BQ & HW. Production from oil wells completed in Shuaiba, Thamama B,
Thamama F, BQ & HW is routed through individual flow lines to three Gathering stations
(RDS-1, RDS-2, RDS-3), BQ and HW stations in various parts of the field. The combined
production from the wells at each these stations is routed to Central Degassing Stations
(CDS) via transfer lines ranging in sizes from 16” to 26”. In addition, some wells in the central
part of the field are connected directly to the CDS. The current sustainable oil production
from Bu-Hasa assets is 650,000 STBOPD (including satellite fields BQ and Huwaila).

1.2. BU HASA CDS – EXISTING FACILITY OVERVIEW


Central Degassing Station (CDS) process facilities are designed to degas, desalt and
remove H2S from crude oil prior to transfer to ADNOC ONSHORE’s storage facilities in
Jebel Dhanna and Fujairah. A number of locally producing wells are also directly connected
to the CDS. The CDS has five production trains. Trains numbered 1, 2 and 3 consist of two
stage three phase separators, three (3) common degassing boots for the five production
trains and three (3) common FSTs for the five trains. Trains 4 and 5 have similar equipment
in addition of a single stage electrostatic coalescer (desalter) located downstream of second
stage separator. A block flow diagram of the existing CDS process facilities is shown below.

Security Code: 5–Public


DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR FOR FIRE
FIGHTING EQUIPMENT & FWP

Document No. : P12513-12-99-85-1607 Rev :A

Project No. : P12513 Page : 5 of 27

2. PROJECT SCOPE
Scope of Work for the Project “EPC FOR NEW FLOW SUCTION TANK, ACCESS
PLATFORMS, DEAD LEG REPAIR WORKS, AND SEWAGE TREATMENT PLANT IN
BUHASA” includes, but is not limited to the following minimum requirements for:
Site survey, Detailed engineering, procurement, Construction, installation, inspection &
testing, pre-commissioning, commissioning/ commissioning support and start up works to
implement the following scopes:
 Design and installation of new Flow Suction tank, Degassing boot along with
associated auxillaries and piping in CDS, Replacement of existing 8” condensate
lines from Flare K.O. drums to degassing boots that face integrity issues.
 Access Platforms and Walkways at CDS & RDS 2.
 Piping Dead Leg Repair Works at CDS
 New Sewage Treatment Plant
All of the above are in BU HASA area

Security Code: 5–Public


DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR FOR FIRE
FIGHTING EQUIPMENT & FWP

Document No. : P12513-12-99-85-1607 Rev :A

Project No. : P12513 Page : 6 of 27

2.1. PROJECT OBJECTIVES

There are four objectives for this project. A brief description of the Scope of work under each
project is explained below.

P12513: Design and install New Flow Suction Tank along with associated auxiliaries in Bu
Hasa CDS.

P12505: Many instruments are located at height. These instruments are on Separators,
Boot/FSTs etc. Presently, temporary platforms are used to get access for routine
maintenance. Therefore, permanent platforms are proposed for easy accessibility and
maintenance, besides dealing emergency situations more effectively.

P12506: Carry out Modification Works at Bu Hasa CDS to implement based on study carried
out during FEED to replace the existing Dead leg portion of the piping with CRA material for
the purposes of improving the operability and safety of the existing facilities.

P12541: Build a new package/pre-engineered extended aeration Sewage Treatment Plant


(STP) to treat drainage from COMPANY’s existing Accommodation Compound including
Restaurant & other facilities and from future development of industrial facilities like
Workshops, Laboratory etc. at Bu Hasa. After construction, testing and commissioning of
new STP, existing STP will be demolished which is also part of this scope of work.

P12566: Common Package consisting of all the common elements from the all the above
mentioned project objectives.

Security Code: 5–Public


DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR FOR FIRE
FIGHTING EQUIPMENT & FWP

Document No. : P12513-12-99-85-1607 Rev :A

Project No. : P12513 Page : 7 of 27

3. DEFINITIONS AND ABBREVIATION

3.1. DEFINITIONS

EPC FOR NEW FLOW SUCTION TANK, ACCESS


PROJECT :
PLATFORMS, DEAD LEG REPAIR WORKS, AND SEWAGE
TREATMENT PLANT IN BUHASA
ASSET : BUHASA
Abu Dhabi Company for Onshore Petroleum Operations Ltd.
COMPANY :
(ADNOC ONSHORE)
CONTRACTOR : ROBT.STONE (ME) L.L.C
SUB-CONTRACTOR : Avenir International Engineers & Consultants L.L.C
PROJECT
COMPANY authorized party (Project Management Team)
MANAGEMENT :
responsible for the overall day-to-day execution of the Project
TEAM (PMT)
The duties and obligations to be performed by CONTRACTOR
WORKS : as identified in the Agreement or as amended by a Variation
Order.

SUPPLIER/ VENDOR : TYCO FIRE & SECURITY UAE LLC

SHALL : Indicates a mandatory requirement.


SHOULD : Indicates a recommendation.

Security Code: 5–Public


DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR FOR FIRE
FIGHTING EQUIPMENT & FWP

Document No. : P12513-12-99-85-1607 Rev :A

Project No. : P12513 Page : 8 of 27

3.2. ABBREVIATIONS

ADNOC Abu Dhabi National Oil Company

AGES ADNOC Group Projects & Engineering specification and Guidelines.

CAD Computer Aided Design

CAR Corrective Action Report

CDS Central Degassing Station

COMPANY ADNOC Onshore

CRS Client Response Sheet

DBM Design Basis Memorandum

DC Document Control

DCN Design Change Notice

DCR Design Change Request

DEP Design and Engineering Practice

EDDR Engineering Document Deliverables Register

EPC Engineering Procurement Construction

ESP Electric Submersible Pump

FEED Front End Engineering and Design

FST Flow Suction Tank

HAZOP Hazard and Operability Study

LLI Long Lead Item

MR Material Requisition

MTO Materials Take-Off

OHL Over Head Line

RDS Remote Degassing Station

Security Code: 5–Public


DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR FOR FIRE
FIGHTING EQUIPMENT & FWP

Document No. : P12513-12-99-85-1607 Rev :A

Project No. : P12513 Page : 9 of 27

4. REFERENCE DOCUMENTS
4.1. PROJECT REFERENCE

Document Number Title

30.99.90.0001 Engineering Procedure for Drawings Designs & Numbering Systems

30.99.95.0004 ADNOC Onshore CAD Manual for Consultants

30-99-11-0148 2D Draughting & Tagging Requirements, Typical for Construction

30-99-11-0149 ED & SD Typical Requirements for EPC

30-99-11-0170 Geographical Information System (Typical Requirements for EPC)

30-99-39-0002 Alarm Management, Design Guidelines

30-99-53-0025 Specification for Electrical Installation

30-99-90-0001 Drawing Design and Numbering Systems


Preparation of Supplier’s/Vendor’s Engineering Drawings &
30-99-90-0024
Documents
30-99-90-0384 COMPANY AutoCAD Title Blocks User Guide
Procedure for Rules and Regulations – Project Control Procedure for
30-99-90-1682
EPC Project
30-99-92-0001 COMPANY Standards and General Instructions
ADNOC Onshore Guidelines for Submission of Electronic
30-99-95-0006
Documentation
P12513-12-99-93-
Material requisition for firefighting equipment
1601
P12513-12-99-84-
Fire protection specification
1601
P12513-12-01-85-
Firefighting Equipment Datasheet
1601

4.2. ADNOC ONSHORE PROCEDURES AND TECHNICAL GUIDANCE

All new equipment shall be designed based on COMPANY Engineering Specifications the
AGES relevant Shell DEPs and COMPANY amendments to Shell DEPs as listed below:

Document Number Title


ADNOC general Engineering Specification contractors QA QC
AGES-GL-13-001 Rev 01
requirements.

Security Code: 5–Public


DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR FOR FIRE
FIGHTING EQUIPMENT & FWP

Document No. : P12513-12-99-85-1607 Rev :A

Project No. : P12513 Page : 10 of 27

Document Number Title

AGES-SP-13-002 Rev 01 Procurement inspection & certification requirements in projects

AGES-SP-13-001 Rev 01 Criticality rating specification

DEP 82.00.10.10 - Gen Project Quality Assurance

ISO 9001: 2015 Quality Management Systems- Requirements

DEP 30.10.60.18-Gen Welding of Metals

DEP 34.11.00.10-Gen Site investigations

DEP 34.11.00.12-Gen Geotechnical and Foundation Engineering

DEP 34.19.20.11-Gen Fireproofing of steel structures

DEP 34.28.00.31 Gen Specification – Steel structures

DEP 34.11.00.11-Gen Site Preparation and earthwork

DEP 30.48.00.31-Gen Protective Coating for Onshore Facilities

Security Code: 5–Public


DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR FOR FIRE
FIGHTING EQUIPMENT & FWP

Document No. : P12513-12-99-85-1607 Rev :A

Project No. : P12513 Page : 11 of 27

4.3. INTERNATIONAL STANDARDS

All new equipment shall be designed based on COMPANY Engineering Specifications the
international design codes as listed below:

American Concrete Institute (ACI)


ACI-301 : Specifications for Structural Concrete for Buildings
ACI-302 : Recommended Practice for Concrete Floor and Slab Construction
ACI-305R : Hot weather concreting
ACI-318 : Building Code Requirements for Reinforced Concrete

American National Standards Institute (ANSI)


ANSI A58.1 : Minimum design Loads in Buildings and other Structures

American Institute of Steel Construction (AISC)


AISC 325 : Manual of Steel Construction
AISC 341 : Seismic Provisions for Steel Buildings
AISC 360 : Specification for Structural Steel Buildings
Minimum Design Loads and Associated Criteria for Buildings and
ASCE 7-16 :
Other Structures – Including Supplement 1
AISC 303 : Code of Standard Practice for Steel Buildings and Bridges

British Standards
BS 115 : Metallic resistance materials for electrical purpose
BS 1881 : Testing Concrete
BS 3148 : Methods of tests for water for making concrete
Specification for carbon steel bars for the reinforcement of
BS 4449 :
concrete
BS 4483 : Steel fabric for the reinforcement of concrete
BS 6031 : Earth Works
BS 6121-1 : Mechanical Cable Glands
BS 6166 : Lifting Slings (Part 1 and 2)
BS 6346 : 600/1000V Armoured Cables having PVC Insulation
BS 6746 : PVC Insulation Flexible and Sheath of Electric Cables
BS 7430 : Code of practice for Earthing
BS 7655 : Specification for Insulating and Sheathing materials for cables
BS 7671 : Requirements for Electrical Installations
BS 8004 : Foundations

Security Code: 5–Public


DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR FOR FIRE
FIGHTING EQUIPMENT & FWP

Document No. : P12513-12-99-85-1607 Rev :A

Project No. : P12513 Page : 12 of 27

British Standards
BS 8007 : Design of Concrete Structures for Retaining Aqueous Liquids
BS 812 : Testing Aggregates
Actions on structures – Part 1-2 : General actions – Wind
BS EN 19941-1-4 :
actions
BS EN 50262 : Cable Glands for Electrical Installations
BS EN 50265 : Common Test Methods for Cables under Fire Conditions
BS EN 50288-7 : Multi-Element Metallic Cables
Hot dip galvanized coatings on fabricated iron and steel articles
BS EN ISO 1461 :
– Specifications and test methods

International Organisation for Standardization (ISO)


ISO 9000 : Quality Management Systems – Requirements
ISO 9001-2015 : Quality Management Systems – Fundamentals & Vocabulary
ISO 10474 : Steel and Steel Products – Inspection Documents

National Fire Protection Association (NFPA)


IP PMM : Part VI Section 1 and Section 2 – Sampling
NAMUR NE 43 : National Electrical Code
NFPA 70 : Standardization of Signal Level Failure for Transmitters

National Association of Corrosion Engineers (NACE)


Materials for use in H2S containing environments in Oil & Gas
NACE MRO175 :
Industry
Evaluation of Pipeline and Pressure Vessel Steels for
NACE TM0284 :
Resistance to Hydrogen Induced Cracking

Security Code: 5–Public


DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR FOR FIRE
FIGHTING EQUIPMENT & FWP

Document No. : P12513-12-99-85-1607 Rev :A

Project No. : P12513 Page : 13 of 27

5. ORDER OF PRECEDENCE

All detail engineering, supply and installations of the PROJECT facilities shall be performed
in accordance with the LATEST Specifications, Standards, Codes, Regulations, Shell DEPs
etc., Latest versions of the FEED specified applicable international codes and standards as
on date of contract shall be applicable for the detail engineering.

In any areas of conflict, the order of precedence in the use of the above shall be as follows:

 The laws, standards and Regulations of United Arab Emirates


 Project Standards
 ADNOC Standards (AGES, HSE Standards, Procedures)
 Project design bases and philosophies
 Project Specific documents
 ADNOC Group Engineering Specifications (AGES) & ADNOC Onshore applicable
standard engineering Specifications (ES) and Amendments
 Shell DEP’s version 41 & MESC 14D
 International Oil & Gas Industry Codes, Standards, and Recommended practices
(all where specified in above or, where none of the above is applicable, as
proposed by Contractor and approved by Company)

In case of conflict between documents in the same level of the hierarchy, the most stringent
requirement shall apply. In such cases CONTRACTOR shall provide its interpretation in
writing of the most stringent requirement for ADNOC ONSHORE's Approval utilizing a
Technical Query sheet. In all such cases of conflict ADNOC ONSHORE's decision shall be
final.

6. PURPOSE

The purpose of the document is to provide technical details of self oscillating monitor for EPC
FOR NEW FLOW SUCTION TANK, ACCESS PLATFORMS, DEAD LEG REPAIR WORKS,
AND SEWAGE TREATMENT PLANT IN BUHASA

Security Code: 5–Public


DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR FOR FIRE
FIGHTING EQUIPMENT & FWP

Document No. : P12513-12-99-85-1607 Rev :A

Project No. : P12513 Page : 14 of 27

7. DATA SHEET FOR SELF OSCILLATING MONITOR & NOZZLE

GENERAL
1. Equipment Self-Oscillating Foam Monitor
2. Service Fluid Foam solution / Fresh water
For CDS,
XFM-5210-01,
CDS- 12-01-XFM-5213
12-01-XFM-5214
XFM-5210-02, XFM-5210-03,
XFM-5210-04, XFM-5210-05,
12-01-XFM-5215, 5216,5216,5218, 5219,5220 XFM-5210-06,
3. Tag No:
XFM-5210-07, XFM-5210-08.
For KOD,
XFM-5210-01
KOD- 12-39-XFM-5101-06

MONITOR
4. Model 8593-02
5. Make Elkhart Brass
6. Type Single vaned with 3”waterway
Automatic water oscillating foam monitor

7. Rated Pressure 14 barg (200 psi)


8. Monitor Inlet connection 4”, ANSI 150#, FF
9. Monitor Outlet connection 2.5” NHT (male) outlet
10. Vertical movement -85Deg
45°abovetoand+90° (Total vertical movement: 135°)
-15 Deg below

0 with disc & slots to restrict certain sweep angle


11. Horizontal movement 360
12. Control / operation Tiller (Handle operated)
13. Maximum flow 1250 gpm
14. Material of construction (body) Brass
brass with red urethane enamel
15. Pressure drop (Note 3) 12 psi (Approximately) at 500 gpm
16. Paint / Finish Finish red urethane enamel RAL 3000.
17. Approval FM
UL/FM approved
approved

MONITOR OSCILLATOR
18. Model WPO-2000 Indicate oscillating speed
19. Make Elkhart Brass
20. Type Water powered monitor oscillator
21. Material of construction Stainless steel and brass construction
22. Rated pressure 14 barg (200 psi)
23. Max. Flow 2000 gpm
0-30°/sec oscillating speed range
24. Speed
(24°/sec max @ 100 psi (6.89 barg))
25. Arc of Oscillation 15° to 120°
Oscillator Flange Connection size Lugged type, 4”, suitable to install between 150#,
26.
& type ANSI flange
27. Paint / Finish Red urethane enamel finish RAL 3003
RAL 3000

28. Approval FM approved


UL/FM approved

NOZZLE (Type-1)

Security Code: 5–Public


DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR FOR FIRE
FIGHTING EQUIPMENT & FWP

Document No. : P12513-12-99-85-1607 Rev :A

Project No. : P12513 Page : 15 of 27

29. Make HF-350


30. Model Elkhart Brass
31. Type Hydro-foam nozzle, Constant flow type
32. Pattern Fog & Jet type
33. Proportioning rate / ratio (Foam) 3%
34. Material of construction (body) Brass
35. Rated flow 350 gpm @ 100 psi (6.89 barg)
36. Inlet connection (size & type) 2.5” NHT (female) swivel inlet
Foam suction port / connection
37. 1” NPT(M)
size & type
145’(45m) @ 350 gpm @100 psi
Horizontal reach / throw (straight
38. (*Refer page 25 & 27 for the detailed trajectory
stream) @ 320 Monitor angle
graph / chart)
39. Finish Natural finish
40. Approval UL listed
NOZZLE (Type 2)
41. Make HF-500
42. Model Elkhart Brass
43. Type Hydro-foam nozzle, Constant flow type
44. Pattern Fog & Jet type
45. Proportioning rate / ratio (Foam) 3%
46. Material of construction (body) Brass
47. Rated flow 500 gpm @ 100 psi (6.89 barg)
48. Inlet connection (size & type) 2.5” NHT (female) swivel inlet
Foam suction port / connection
49. 1” NPT(M)
size & type
162’(49.3m) @ 500 gpm @100 psi
Horizontal reach / throw (straight
50. (*Refer page 26 & 27 for the detailed trajectory
stream) @ 320 Monitor angle
graph / chart)
51. Finish Natural finish
52. Approval UL listed
Note 1: The proposed self oscillating monitor unit is designed to operate at 16.5 barg
Note 2: The trajectory graph /chart details (throw range) are theoretical only, taking into
consideration fluid as water & still air condition. Values will vary depending on site condition.
Note 3. Refer Page 22 for the pressure drop vs flow rate graph for the selected monitor model
8593-02
Note 4: Pickup hose, foam shutoff valve & pickup tube will be supplied along with monitor /
nozzle. The MOC of pick-up hose will be clear reinforced, pick-up tube will be PVC & shut off
valve will be brass. Pickup tube hose 2.4m long & 1 m SS tube
Note 5: Since monitor oscillator is lug type, this will be a loose supply along with monitor and
to be installed at the site with the upstream mating flange.

Security Code: 5–Public


DATA SHEET FOR AUTOMATIC SELF OSCILLATING MONITOR FOR FIRE
FIGHTING EQUIPMENT & FWP

Document No. : P12513-12-99-85-1607 Rev :A

Project No. : P12513 Page : 16 of 27

8. PRODUCT CATALOGUE FOR SELF OSCILLATING MONITOR & NOZZLE

Security Code: 5–Public


MONITORS CATALOGUE FOR MONITOR

COPPERHEAD

Copperhead ®
MONITORS

• Rugged, corrosion resistant brass construction is ideal for use in refineries,


chemical plants, off shore installations and for shipboard use
• Specific industrial reliability/maintenance-free features of the Copperhead IV include:
– Sealed grease bearings with a built-in, one way, pressure release
– Enclosed, stainless steel locking mechanism
– Environmentally-sealed valve actuator
• Efficient design creates the most cost effective brass monitor in its flow class
• Low friction loss due to 33/8” patented vaned elliptical waterway
• Small footprint — less than 15” wide and requires just 16” of clearance — makes it
ideal for tight spaces

5-40

Copperhead
Mo. 8593IV All surfaces sealed
(Nozzle sold separately) against moisture, sand,
and particle penetration

Utilizes Unibody
Valve technology
with a stainless
steel, quarter-turn,
full-flow ball

Single bolt change-


Full 360° rotation
out rotates valve
handle position in
45° increments

1250 200
GPM PSI
5000 14 bar
LPM

ELKHART BRASS MFG. CO., INC. • 800.346.0250 • 1.574.295.8330 • FAX: 574.293.9914 • www.elkhartbrass.com
MONITORS

COPPERHEAD

MONITORS
SPECIFICATIONS
Max Flow 1250 GPM (5000 LPM)
Sizes Types
4” 150# ANSI
Flange
Inlets
3” 150# ANSI
Flange NPT (F)
Outlet 2.5” NHT
Tiller
Controls Dual hand-wheel – rotating base
Dual hand-wheel – fixed base
Material/Finish Brass with red urethane enamel
Friction Loss 16 psi at 1250 gpm
Copperhead 12 psi at 1000 gpm
Friction Loss 21 psi at 1250 gpm INTEGRATED TILLER BAR (3) HAND WHEEL (4)
Copperhead IV 16 psi at 1000 gpm VALVE (1)
V -45º to +90º (135º)
Travel V -49º to +86º (135º)
H 360º (continuous)
Weight Variable (see chart for specifics)
Ratings and
CE, FM Approved
Certifications
5-41

Copperhead Selector Guide


INLET SIZES / TYPES CONTROLS VERTICAL INTEGRAL CERTIFI-
OUTLET TRAVEL COMPONENTS CATION
SIZE

Pressure Gauge

FM Approved
NPT 150# ANSI Flange Hand-wheels Tillers 3” Ball Valve
-45 to

-49 to
+90°

+86°

MODEL

Illustration
Fixed Rotating Copperhead Copperhead IV
Base Base Bar Bar Hand-
2.5” Tiller
3” 3” 4” NHT (68 Lbs.) (68 Lbs.) (58 Lbs.) (87 Lbs.) (135°) (135°) wheel
CE
o s* o* • s 8593-02 • o • • 3
8593-03/
o s
o • s • o • • 4,6 294-11rev.06

8593-03X/
o s 294-11rev.06x
o • s • o • • 4,5
s • s • o s o • 1,2 8593IV
4,5 4,6 3 2 1 Illustration
KEY s = standard o = option
*NOTE: 8593-02 with 3” & 4” 150# ANSI Flange are made from 85 Brass.

PRODUCT HIGHLIGHTS
In addition to offering the only brass dual hand-wheel •W
 hen using the rotating base dual hand-wheel
monitor of this size on the market, Elkhart’s Copperhead control, the operator moves in tandem with
monitor boasts a choice of base configurations: the monitor while managing the monitor’s
•T
 he fixed base dual hand-wheel control horizontal travel. The rotating base allows the
allows the operator to remain in a operator to maintain visual contact with
stationary position while manipulating (6) the monitor’s stream direction.
the horizontal movement of the monitor. In most industrial settings where the traditional- 294-11 is
The fixed nature of the horizontal currently used, the Copperhead would be an appropriate
control can be especially beneficial when replacement. The Copper­head offers a choice of control styles
operating space is limited. as well as higher flow capacity.
(5)

ELKHART BRASS MFG. CO., INC. • 800.346.0250 • 1.574.295.8330 • FAX: 574.293.9914 • www.elkhartbrass.com
MONITORS

COPPERHEAD

Recommended Products
MONITORS

SM-1000HF – SM-1250B – CSW-LB – 181 –


SELF-EDUCTING X-STREAM® SELECT-O-FLOW® DELUGE TIP

P a ge 6 - 1 6 P ag e 6 - 7 P a g e 6-13 P a g e 1-26
282B – 84 – BUTTERFLY CJB – IMS –
STREAM SHAPER WAFER VALVE SELECT-O-STREAM® SELECT-O-STREAM®

P a ge 1 - 2 7 Page 5-51 P a g e 6-12 P a g e 6-12

5-42
Components & Options Chart
COMPONENTS & OPTIONS ILLUSTRATION MODEL

Companion 3” 150# ANSI steel flange with bolts and gaskets 81315001
Flange Kits 4” 150# ANSI steel flange with bolts and gaskets 81317001

Water Powered Monitor Oscillator (8593-02)


Max Operating
Inlet Speed Arc of Oscillation Material Certification MODEL WPO-2000
Pressure
0-30°/sec oscillating
200 PSI
4.0” speed range - 24°/sec 15° to 120° 316 stainless steel WPO-2000
(13.8 BAR)
max @ 100 PSI (6.9 BAR)

ADDITIONAL INFORMATION
• Weights are approximate and will vary by selected inlet.
• Technical Data on monitor performance may be found on page
T-11.
• LA style handles available on the Copperhead.

ELKHART BRASS MFG. CO., INC. • 800.346.0250 • 1.574.295.8330 • FAX: 574.293.9914 • www.elkhartbrass.com
Copperhead Monitor Data Sheet
Elkhart Brass Copperhead industrial single waterway monitor offers
two types of control options and provides efficient water/foam flows
up to 1250 GPM (4732 LPM)

Models:
8593-02 Tiller Bar Control with swivel joint locks
8593-03X Dual Handwheel Control – Fixed base
8593-03 Dual Handwheel Control – Rotating base

Features:
Full 3.0” waterway
Brass construction waterway
Cast-in vanes for higher efficient flow
360° horizontal travel
+90° above to -45° vertical discharge travel
Optional pressure gauge
Optional drain valve Nozzle sold separately.

Specifications:
Certifications FM Approved - 1421
Weight 68 lbs. (30.8 kgs.)
Material Brass construction – UNS-C83600
Inlet options 3.0” or 4.0” flange FF or RF
Outlet 2.5” discharge
Rated Flow 1250 GPM (4732 LPM)
Pressure Drop Not to exceed 27 PSI @ 1000 GPM
Maximum operating pressure 200 PSI (14 bar)
Hydro-static test pressure 500 PSI (34 bar)
Design pressure 800 PSI (55.2 bar) FM1421 standard
Design temperature range -35° F - 250°F (-37° C - 121° C)

Nozzle sold separately.

Safe Fleet Fire, EMS & Industrial Brands:

1302 West Beardsley Ave. | Elkhart, IN 46514 | 574. 295. 8330 | www.elkhartbrass.com
8593-02 Dimensions
PRESSURE DROP CHART FOR MONITOR 8593-02

8593-02 Copperhead® Losses


4" Inlet and 2.5" Outlet
70.0

60.0

50.0
Pressure (PSI)

40.0

30.0

20.0

10.0

0.0
0 200 400 600 800 1000 1200 1400
Flow Rate (GPM)
Total Static Pressure Drop Friction Loss

4/15/2020
CATALOGUE FOR MONITOR OSCILLATOR

DATA SHEET
WPO-2000
Water Powered Monitor Oscillator
The WPO-2000 is designed to provide up to 30°/sec oscillation speed when installed between a monitor flange
and supply piping flange or control valve flange. The WPO-2000 is the most versatile and reliable water powered
monitor oscillator system available to the fire protection industry today. The WPO-2000 system is FM approved,
has a US patent pending, and is suitable for installation in corrosive and non-corrosive environments.

Features:
• Maintenance free waterway
• Modular oscillator design enables compatibility with several types of monitors
• 316 Stainless steel construction provides outstanding corrosion resistance for use in corrosive environments
• Easily accessible external controls enable speed and travel range adjustments while system is in operation
• Double reduction oil bath gearbox ensures reliability and extended life for heavy use
• Manual override feature enables manual control at any time
• 15° to 120° arc of oscillation range for wide coverage area
• 10 psi (0.69 bar) minimum & 200 psi (13.8 bar) maximum operating pressure
• Supports wide range of monitors with up to 2000 GPM (7570 LPM) flow rates
• Compact size enables ease of installation
• Can be tested with a garden hose without flowing monitor

*Monitor not included

1-574-295-8330
www.elkhartbrass.com Rev.1
WPO-2000
Water Powered Monitor Oscillator
SPECIFICATIONS
Model WPO-2000
Inlet 4"-150# Flange
Material 316 stainless steel construction
Speed 0-30°/sec oscillating speed range
24°/sec max @ 100 psi (6.9 bar)
Arc of Oscillation 15° to 120°
Max Operating Pressure 200 psi (13.8 bar)

Warranty:
• 5-Year limited warranty

Certifications:

OSCILLATOR FLANGE
INLET - 4.0" [101.6 MM]
14.3 REF OUTLET - 4.0" [101.6 MM] 1.8 REF
[364 MM] [45 MM]

21.4 REF
[543 MM]

TEST CONNECTION 17.9 REF


[454 MM]
INLET - 21 NPTF

CLAMP DIAMETER (DIMENSION A)


CLAMP DIAMETER (DIMENSION A)
ITEM NUMBER A (IN) A (MM)
ITEM NUMBER A (IN) A (MM)
02000001 5.25 133.35 02000001 5.25 133.35
02000002 6.50 165.10 02000002 6.50 165.10

1-574-295-8330
© 2019 Elkhart Brass Mfg. Co., Inc. 10-19
www.elkhartbrass.com Rev.1
CATALOGUE FOR NOZZLE TYPE-1 (HF-350)

HF-350 HYDRO-FOAM MASTER STREAM NOZZLE


350 GPM @ 100 PSI Rated Flow
The Elkhart Brass Hydro-Foam self-educting nozzles are
constant flow with a built-in metering device that accurately
proportions foam concentrate at the selected rate. The HF-
500 nozzle series are fixed gallonage nozzles rated at 100 PSI
(7 bar). The stream pattern is easily adjusted under flowing
conditions from wide fog (90°) to straight (jet) providing
excellent firefighting extinguishment. The standard inlet is
2.5” NH female swivel. Rugged brass construction UNS
C84400. This nozzle is suitable for Class A and Class B foam
including AR-AFFF, AFFF, & fluoroprotein foam concentrates.
Specifications
Rated Flow 350 GPM (1325 LPM)
Nozzle Inlet 2.5” NH female swivel rocker lug style
Type Constant flow in all stream patterns
Foam pick-up rates ½%, 1%, 3%, 6%
Foam pick-up tube Clear flexible PVC 9.0’ (2.7m) x 1.25” ID
Operating pressure 100 PSI (7bar)
Operating temperature range -35°F - 232°F (-37°C - 111°C)
Weight 19.0 lbs. (2.2 kgs.)
Certification UL Listed

This fire stream data is an engineering estimate using just water and is provided for reference only. Actual stream
performance is affected by environmental conditions and fire water supply conditions at the site. All equipment should be
assessed after installation to verify the adequacy of the fire protection systems.
CATALOGUE FOR NOZZLE TYPE-2 (HF 500)

HF-500 HYDRO-FOAM MASTER STREAM NOZZLE


500 GPM @ 100 PSI Rated Flow
The Elkhart Brass Hydro-Foam self-educting nozzles are
constant flow with a built-in metering device that accurately
proportions foam concentrate at the selected rate. The HF-
500 nozzle series are fixed gallonage nozzles rated at 100 PSI
(7 bar). The stream pattern is easily adjusted under flowing
conditions from wide fog (90°) to straight (jet) providing
excellent firefighting extinguishment. The standard inlet is
2.5” NH female swivel. Rugged brass construction UNS
C84400. This nozzle is suitable for Class A and Class B foam
including AR-AFFF, AFFF, & fluoroprotein foam concentrates.
Specifications
Rated Flow 500 GPM (1896 LPM)
Nozzle Inlet 2.5” NH female swivel rocker lug style
Type Constant flow in all stream patterns
Foam pick-up rates ½%, 1%, 3%
Foam pick-up tube Clear flexible PVC 9.0’ (2.7m) x 1.25” ID
Operating pressure 100 PSI (7bar)
Operating temperature range -35°F - 232°F (-37°C - 111°C)
Weight 19.0 lbs. (2.2 kgs.)
Certification UL Listed

This fire stream data is an engineering estimate using just water and is provided for reference only. Actual stream
performance is affected by environmental conditions and fire water supply conditions at the site. All equipment should be
assessed after installation to verify the adequacy of the fire protection systems.
ELKHART BRASS MFG. CO., INC. • 800.346.0250 • 1.574.295.8330 • FAX: 574.293.9914 • www.elkhartbrass.com

TRAJECTORY CHART (REACH SELF-EDUCTING


NOZZLE FLOW
DATA) FOR HF 350 & HF 500

The flow and effective reach data found on the following pages is compiled and updated by our engineering staff in the testing area of our assembly department.
The flow is determined by an electronic flowmeter while a piezometer gauge at the base/inlet of the nozzle establishes the “nozzle pressure.”
The effective reach is determined by elevating the nozzle to 32 degrees above horizontal and at a height of 4’ above ground level. The reach of Straight Stream,
Narrow Fog (30 degrees) and Wide Fog (90 degrees) are then established by measuring where the last water droplets are falling at ground level. These tests are
conducted in “still air” conditions, so the actual results will vary depending upon conditions.

Discharge in U.S. GPM Effective Reach in Feet


Catalog Stream Nozzle Pressure PSI Nozzle Pressure PSI
GPM
No. Setting 40 50 60 70 80 90 100 125 40 50 60 70 80 90 100 125
SS 80 95 110 124 134 140 145 155
HF-350*
HF-350-A 350 30°-Fog 230 245 260 276 293 309 325 365 42 47 52 57 62 68 73 80
90°-Fog 13 14 15 16 17 18 20 23
SS 97 110 123 136 145 155 162 175
HF-500*
HF-500-A 500 30°-Fog 345 370 390 410 432 455 475 530 52 57 61 66 71 76 80 92
90°-Fog 18 20 22 23 25 27 29 31
*These flow figures computed with water only. Add 1, 3, 6% for total foam flow.

Discharge in U.S. GPM Effective Reach in Feet


Catalog Stream Nozzle Pressure PSI Nozzle Pressure PSI
No. Setting 50 60 70 75 80 85 90 95 100 105 110 50 60 70 75 80 85 90 95 100 105 110
SS
CSW-* 30°-Fog
C-HF
80°-Fog
*These flow figures computed with water only. Add 1, 3, 6% for total foam flow.

Discharge in U.S. GPM Effective Reach in Feet


Catalog Stream Nozzle Pressure PSI Nozzle Pressure PSI
No. Setting 50 60 70 80 90 100 125 50 60 70 80 90 100 125
SS
SM-1000HF
30°-Fog
SM-1000E-HF
90°-Fog
SS
SM-2000HF
30°-Fog
SM-2000E-HF
90°-Fog
*These flow figures computed with water only. Add 1, 3, 6% for total foam flow.